Valid

GB/T 32451-2015Space project management (English PDF)

航天项目管理

Preview PDF

This is a limited preview

Buy now to download the full PDF (26 pages)

Need quotation for your management?

Get a formal quotation for GB/T 32451-2015 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Level / Type

National · Recommended

Issue date

December 31, 2015

Implementation date

July 1, 2016

Scope

GB/T 32451-2015 is the English-translated version of 航天项目管理.

GB/T 32451-2015 — This standard specifies the space program/project management requirements, through the top-down approach, for the customer and the contract between the supplier.

The requirements for product assurance shall be in accordance with the relevant standards. Note. A project is a collection of items. In this standard, "program" and "project" can be used in the same context.

This standard serves as a basic document for the management of aerospace projects to develop and coordinate customer project management requirements and guide the supplier to complete these items.

Management requirements. This standard requires.

The roles, responsibilities and authorities of different customers and suppliers should be clear; - customer and supplier activities should be coordinated; - information between customers and suppliers should be interoperable; --- should establish a stable and rigorous project organization; The rules applied to different programs/projects should be as standardized as possible. Can be tailored according to the actual situation.

Found what you need?

Document preview — GB/T 32451-2015

National Standard of the People's Republic of China

ICS
49.140
Classification
V 01

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative reference document
  • 3 Terms and definitions
  • 4 Acronym

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009.

This standard uses the re-drafting method to modify ISO 14300-1.:2011 "Aerospace Systems Program Management Part 1. Projects structure".

Taking into account our national conditions, in the use of ISO 14300-1.:2011, the standard made some changes. The technical differences have been compiled and in the margins of the terms of the articles in which they relate. These technical differences and their differences are given in Appendix A.

List of reasons for reference.

This standard has also made the following editorial changes.

a) the word "international standard" is changed to "this standard";

b) Prerequisites for the removal of international standards.

This standard is proposed by China Aerospace Science and Technology Corporation.

This standard is nationalized by the National Aeronautical Technology and Its Application Standardization Technical Committee (SAC/TC425).

The drafting of this standard. China Aerospace Standardization Institute, China Space Technology Research Institute.

Introduction

This standard specifies an overview and requirements for the management of aerospace projects aimed at optimizing performance, cost and schedule, and reducing risk.

Project management is an indispensable element of any project, but for aerospace systems, it is even more important due to the following characteristics.

--- special space environmental conditions;

--- high performance requirements;

Small batch

- limited exposure to the product during operation;

--- In the event of failure in flight failure;

--- the high complexity of the organization;

--- high cost.

The requirements of this project management requirements will regulate China's space project management, promote and facilitate international space cooperation.

Aerospace project management

1 Scope

This standard specifies the space program/project management requirements, through the top-down approach, for the customer and the contract between the supplier.

The requirements for product assurance shall be in accordance with the relevant standards.

Note. A project is a collection of items. In this standard, "program" and "project" can be used in the same context.

This standard serves as a basic document for the management of aerospace projects to develop and coordinate customer project management requirements and guide the supplier to complete these items.

Management requirements.

This standard requires.

The roles, responsibilities and authorities of different customers and suppliers should be clear;

- customer and supplier activities should be coordinated;

- information between customers and suppliers should be interoperable;

--- should establish a stable and rigorous project organization;

The rules applied to different programs/projects should be as standardized as possible.

Can be tailored according to the actual situation.

2 Normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document.

GB/T 19000-2008 Quality management system foundation and terminology (ISO 9000.:2005, IDT) GB/T 19001-2008 Quality management system requirements (ISO 9001.:2008, IDT) GB/T 19017-2008 Technical Management Guide for Quality Management Systems (ISO 10007.:2003, IDT) GB/T 32299-2015 Aerospace project risk management (ISO 17666.:2003, MOD) ISO 11893 Space Systems Project Management Project Organization (Spacesystems-Programmemanagement-Project organization ISO 21351 Aerospace System Functions and Specifications (Spacesystems-Functional andtechnicalspecifications) ISO 27026 Space System Project Management Project Management Structure Decomposition (Spacesystems-Programmemanage-ment-breakdownprojectmanagementstructures

3 Terms and definitions

GB/T 19000-2008 Definitions and the following terms and definitions apply to this document.

Project

A series of start and end dates to achieve a specific goal requires coordination and control. Work should be in line with schedule, cost and Resources and other aspects of the specific requirements.

Program

A collection of closely related items. Through the coordination of their management can be obtained separately project management is difficult to obtain the whole

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 32451-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
26 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32451-2015

$415.00