Scope

GB/T 31184-2014 is the English-translated version of 离心式压缩机制造监理技术要求.

GB/T 31184-2014 specifies the basic technical requirements for the manufacturing supervision of centrifugal compressors and for the equipment quality matters connected with it.

Clause 1 states that it applies to the manufacturing supervision of centrifugal compressors used in oil refining, ethylene, fertilizer, chemical and other installations, and it adds one exclusion, concerning the manufacturing supervision of a geared centrifugal compressor, in a sentence the draft garbles too badly to restate.

Clause 3 takes its terms from GB/T 26429-2010 and API Std 617-2002 and defines manufacturing supervision as the monitoring and management service a firm carries out on the manufacturing of specialized equipment under contract, on commission from the principal.

The same clause defines witness, and three kinds of supervision control point set in advance: the file witness point or R point, set on the documents, records or reports of the equipment; the witness point or W point, set for a process, procedure or node to be witnessed on site; and the stop witness point or H point, which the engineer must witness and sign off before the next process step or node.

Clause 2 cites GB/T 26429-2010 and API Std 617-2002. The draft carries no table of contents and breaks off inside clause 3, so the requirement clauses themselves are not visible.

The standard is administered by the standardization technical committee the page identifies as SAC/TC423, and the page places it at ICS 03.080.99 and Chinese classification A20. It was issued on 3 September 2014 and has applied since 1 October 2014.

Found what you need?

Document preview — GB/T 31184-2014

National Standard of the People's Republic of China

ICS
03.080.99
Classification
A 20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules.

1 Scope

This standard specifies the basic technical requirements and centrifugal compressor manufacturing quality-related equipment supervision.

This standard applies to oil refining, ethylene, fertilizers, chemicals and other devices with centrifugal compressor manufacturing supervision.

This standard does not apply to the overall growth of manufacturing supervision gear centrifugal compressor.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 26429-2010 Equipment Project Management Regulation

APIStd617-2002 petrochemical and gas industry with axial, centrifugal compressors and expander - compressors (Axialand centrifugalcompressorsandexpander-compressorsforpetroleum, chemical, andgasindustry)

3 Terms and Definitions

GB/T 26429-2010 and APIStd617-2002 as defined in the following terms and definitions apply to this document.

3.1 Manufacturing supervision

The firm should accept the commission principal, according to the contract of specialized equipment manufacturing process monitoring and management services.

3.2 Witness testimony

Equipment supervision personnel files, records, entities, processes and other physical activities to observe, examine, record, confirmation testimony activities. [GB/T 26429-2010, the definition 3.13]

3.3 File witness point

R point

Engineer by the device of the relevant files on your device works, records or reports, witness and supervision preset control point. [GB/T 26429-2010, the definition 3.14]

3.4 Witness point

W Point

By the supervising engineer for process equipment, process, or result of node equipment construction site witness previously set supervision control points. [GB/T 26429-2010, the definition 3.15]

3.5 Stop witness point

H point

Before witnessed by the device into the Engineer and signed off after the next process step or node preset Supervision control point.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 31184-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 31184-2014

$235.00