Valid

GB/T 30949-2025Specification for the post-evaluation of water saving irrigation projects (English PDF)

节水灌溉项目后评价规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (10 pages)

Need quotation for your management?

Get a formal quotation for GB/T 30949-2025 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 31, 2025

Implementation date

July 1, 2026

Scope

GB/T 30949-2025 is the English-translated version of 节水灌溉项目后评价规范.

GB/T 30949-2025 is the Chinese standard "Specification for the post-evaluation of water saving irrigation projects".

Its scope clause reads: This document specifies the general requirements for post-evaluation of water-saving irrigation projects, as well as the evaluation organization, evaluation data, process evaluation, target evaluation, and impact assessment.

The content and requirements of impact assessment, sustainability assessment, comprehensive assessment, and assessment report. This document applies to the post-evaluation of water-saving irrigation projects. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 30949-2025

National Standard of the People's Republic of China

ICS
93.160
Classification
P 57
Replacing
GB/T 30949-2014

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1.Scope
  • 2 Normative References
  • 3.Terms and Definitions
  • 4.General Requirements
  • 5.Evaluation of the organization
  • 6.Evaluation Data
  • 7.Process Evaluation
  • 8.Target Evaluation
  • 9.Impact Assessment
  • 10 Sustainability Assessment
  • 11.Overall Evaluation
  • 12 Evaluation Report
  • Appendix A (Normative) Post-evaluation Indicators and Key Points for Water-Saving Irrigation Projects

1 Scope

This document specifies the general requirements for post-evaluation of water-saving irrigation projects, as well as the evaluation organization, evaluation data, process evaluation, target evaluation, and impact assessment.

The content and requirements of impact assessment, sustainability assessment, comprehensive assessment, and assessment report.

This document applies to the post-evaluation of water-saving irrigation projects.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

GB/T 50363 Technical Standard for Water-Saving Irrigation Engineering

SL72 Standard for Economic Evaluation of Water Conservancy Projects

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1

Projects aimed at improving irrigation water efficiency and effectiveness, with water-saving irrigation engineering and management measures as the main construction content.

3.2 Postevaluation

For projects that have been completed and accepted, or projects that have not undergone completion acceptance but whose main structure has been completed and put into use for more than one year, compare them with the project's establishment and construction...

The relevant documents and materials were reviewed, and the actual results achieved after the project was completed were compared and analyzed with the initially determined goals to summarize the experience and lessons learned.

Effective measures and suggestions for improvement are proposed.

3.3 Process evaluation

Based on the analysis of the status of each stage of the project, the following assessments are made regarding whether the project implementation process is carried out as planned, the management level of the project implementation process, and the work...

Evaluations will be made regarding the quality of the work.

3.4 economic evaluation

By analyzing and calculating the costs and benefits of a project, its economic rationality and financial compliance can be evaluated.

3.5 Impact evaluation

The project's economic, environmental, and social impacts are evaluated using both quantitative and qualitative methods.

3.6

The project's sustainable development capacity is evaluated based on information and data available at the post-evaluation point.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 10 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 30949

EditionTitleRevisionStatus
GB/T 30949-2025Specification for the post-evaluation of water saving irrigation projectscurrent editionCurrent
GB/T 30949-2014Specification for the post-evaluation of water saving irrigation projectsprevious editionSuperseded

This page sells the current edition, GB/T 30949-2025. Earlier editions are listed for reference only.

How to Download GB/T 30949-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
10 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 30949-2025

$210.00