GB/T 30339-2026Guidance on post-project and post-programme evaluation (English PDF)
项目和项目群后评价指南
Open the GB/T 30339-2026 preview as PDF
This is a limited preview
Buy now to download the full PDF (8 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
January 28, 2026
Implementation date
March 1, 2026
Scope
GB/T 30339-2026 is the English-translated version of 项目和项目群后评价指南.
GB/T 30339-2026 is the Chinese national standard covering evaluating a project after it is finished - did it deliver what was promised, at what cost against the estimate, with what benefits actually realised and what lessons, assessed by someone other than the people who ran it. It replaces GB/T 30339-2013 and has been in force since 1 March 2026. It was issued on 28 January 2026 and has been in force since 1 March 2026, replacing GB/T 30339-2013. The document is under the responsibility of the Standardization Administration of China. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
Document preview — GB/T 30339-2026
National Standard of the People's Republic of China
- ICS
- 03.100.40
- Classification
- A 02
- Replacing
- GB/T 30339-2013
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Basic Concepts
- 4.1 Overview
- 4.2 Objective
- 4.3 Governance Support
- 4.4 Post-evaluation benefits
- 4.6.2 Lessons Learned from Application
- 5 Basic Principles
- 5.1 Independence 5
- 5.2 Objectivity 5
- 5.3 Targeted 5
- 5.4 Practicality 5
- 6 Preparations 5
- 6.1 Overview 5
- 6.2 Support from senior management 5
- 6.3 Organizational Capabilities and Resource Acquisition 5
- 6.4 Consistency of Organizational Governance System 5
- 6.5 Cooperation between the contractor or supplier 6
- 6.6 Customer Collaboration 6
- 7 Roles and Responsibilities 6
- 7.1 Overview 6
- 7.2 Initiating the Organization 7
- 7.3 Post-evaluation initiator 7
- 7.4 Post-evaluation team leader 7
- 7.5 Post-evaluation team members 7
- 7.6 Stakeholders and Consulting Clients 7
- 7.6.1 Overview 7
- 7.6.2 Internal Stakeholders 8
- 7.6.3 External Stakeholders 8
- 7.6.4 Consultation Targets 8
- 7.7 Improve the implementation team 8
- 8 Evaluation Content
- 8.1 General Rules
- 8.2 Governance and Management 9
- 8.2.1 Evaluation Criteria 9
- 8.2.2 Decision-making stage 9
- 8.2.3 Preparation Phase 10
- 8.2.4 Implementation Phase 10
- 8.3 Strategic Alignment and Objectives 10
- 8.3.1 Evaluation Points 10
- 8.3.2 Strategic Alignment 10
- 8.3.3 Target suitability 10
- 8.3.4 Goal Achievement Rate 11
- 8.4 Outputs and Results 11
- 8.4.1 Evaluation Points 11
- 8.4.2 Output 11
- 8.4.3 Organizational and Social Outcomes 11
- 8.4.4 Environmental Outcomes 11 8.5% profit 12%
- 8.5.1 Evaluation Points 12
- 8.5.2 Economic and Financial Benefits 12
- 8.5.3 Social Benefits 12
- 8.5.4 Environmental Benefits 12
- 8.6 Sustainability 12
- 8.6.1 Evaluation Points 12
- 8.6.2 Sustainability of Output 13
- 8.6.3 Sustainability of Expected Outcomes 13
- 8.6.4 Sustainability of Revenue Realization 13
- 8.6.5 Can serve as a template for future work 13
- 9 Evaluation Procedure 13
- 9.1 General Rules 13
- 9.2 Define Objectives and Scope 14
- 9.3 Post-evaluation work planning 14
- 9.4 Team Building and Mobilization 14
- 9.5 Post-evaluation work implemented for 14 days
- 9.5.1 General Rule 14
- 9.5.2 Data Collection and Summary 15
- 9.5.3 Data Analysis and Conclusions 15
- 9.5.4 Post-evaluation document preparation 15
- 9.6 Results Feedback and Utilization
- 15 Reference 17
1 Scope
GB/T 30339-2026 is the Chinese national standard covering evaluating a project after it is finished - did it deliver what was promised, at what cost against the estimate, with what benefits actually realised and what lessons, assessed by someone other than the people who ran it. It replaces GB/T 30339-2013 and has been in force since 1 March 2026. It was issued on 28 January 2026 and has been in force since 1 March 2026, replacing GB/T 30339-2013. The document is under the responsibility of the Standardization Administration of China. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
This document establishes the basic principles for post-project and program post-evaluation, and provides the basic concepts and preparations for conducting such evaluations. Job, role and responsibilities, evaluation content and evaluation procedures. This document applies to the post-evaluation work of planning, organizing and implementing various projects or project groups.
2 Normative references
This document has no normative references.
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 project Temporary efforts made to achieve one or more predetermined goals. [Source: GB/T 45494-2025, 3.15]
3.2 Project group program A group of project components (3.3) managed in a coordinated manner to achieve benefits (3.11). [Source: GB/T 45494-2025, 3.12]
3.3 Program component Project (3.1), project cluster (3.2) or other related work. [Source: GB/T 45494-2025, 3.13]
3.4 business case Written justification for supporting the decision on a project (3.1) or a group of projects (3.2). [Source: GB/T 45494-2025, 3.2, with modifications]
3.5 Initiator/Sponsor The person responsible for acquiring resources and implementing decisions to achieve success. [Source: GB/T 45494-2025, 3.17]
3.6 Stakeholder Anyone who has an interest in, can influence, is influenced by, or considers themselves to be influenced by, any aspect of the project (3.1) or the project group (3.2). The individuals, groups, or organizations affected by it. [Source: GB/T 45494-2025, 3.18, with modifications]
15 Reference 17
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents". Drafting. This document replaces GB/T 30339-2013 "Implementation Guidelines for Post-Project Evaluation". Compared with GB/T 30339-2013, except for editorial revisions... In addition, the main technical changes are as follows:
---Added "Projects," "Programs," "Program Components," "Business Justification," "Sponsors," "Stakeholders," "Governance," and "Governance Entities." The terms and definitions of "output," "results," and "benefits" (see 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 3.10, and 3.11) are further elaborated. The term "post-project evaluation" has been changed to "post-project and project group evaluation," and the corresponding definition has been revised (see 3.12,
3.1 in the.2013 version). The following has been deleted. The terminology and definition of "project application organization" are explained (see section
3.2 of the.2013 edition);
---The "General Principles" section has been changed to "Basic Concepts" (see Chapter 4, Chapter 4 of the.2013 edition), and "Purpose," "Governance Support," and "Post-Governance Support" have been added. The content of "benefits from evaluation" and "continuous improvement" (see 4.2, 4.3,
---Added "Practicality" and related content to the "Basic Principles" section (see 5.4);
---Added "Preparatory Work" and related content (see Chapter 6);
---Added "Role and Responsibility" and related content (see Chapter 7);
---The relevant content in "Evaluation Content" has been changed (see Chapter 8, Chapter 5 of the.2013 edition);
---The section on "Post-Project Evaluation Organization and Management" has been removed (see Chapter 6 of the.2013 edition);
---The relevant content in the "Evaluation Procedure" has been changed (see Chapter 9, Chapter 7 of the.2013 edition);
---Added "Background and Environment of Post-Evaluation" (see Figure 1);
---Added a "Post-Evaluation Power-On Timing Diagram" (see Figure 2);
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.
Editions of GB/T 30339
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 30339-2026 | Guidance on post-project and post-programme evaluation | current edition | Current |
| GB/T 30339-2013 | Guidance on post-project and post-programme evaluation | previous edition | Superseded |
This page sells the current edition, GB/T 30339-2026. Earlier editions are listed for reference only.
How to Buy GB/T 30339-2026
- 1Add to cart. Click the "Buy GB/T 30339-2026" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 30339-2026
$425.00