Scope

GB/T 30285-2013 (Information security technology - Construction and sustain management specifications of disaster recovery center) is available as an English-translated PDF.

GB/T 30285-2013 - This standard specifies the disaster recovery center construction and operation and maintenance management process.

This standard applies to conduct information systems disaster recovery and business continuity activities or organizations providing disaster recovery and business information systems connected Continued service organization (hereinafter referred to as the "Agency").

Found what you need?

Document preview — GB/T 30285-2013

National Standard of the People's Republic of China

ICS
35.040

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Construction and Operation Management Overview
  • 4.1 Construction and Operation Management Principle
  • Life Cycle Model 4.2 Construction and operation and maintenance management
  • 4.3 The construction and operation and maintenance management
  • 4.4 Disaster recovery center set up organizations and 5 posts
  • 5 5 Disaster Recovery Center Planning
  • 5.1 Disaster recovery center needs analysis
  • 5.2 Disaster recovery planning center
  • Construction Management 6 Disaster Recovery Center
  • 6.1 Infrastructure Management

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules.

This standard by the National Safety Standardization Technical Committee (SAC/TC260) and focal points.

This standard was drafted. Beijing Chang'an Palais disaster recovery Services Limited.

1 Scope

This standard specifies the disaster recovery center construction and operation and maintenance management process.

This standard applies to conduct information systems disaster recovery and business continuity activities or organizations providing disaster recovery and business information systems connected Continued service organization (hereinafter referred to as the "Agency").

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 20984-2007 Information Security techniques - Information security risk assessment specification GB/T 20988-2007 Information security technology information system disaster recovery norms GB 50174-2008 electronic information system room design specifications

3 Terms and Definitions

The following terms and definitions apply to this document.

Production systems productionsystem Information systems to support the daily operation of the mechanism under normal circumstances.

Disaster backup system disasterrecoverysystem for disaster recovery purposes, when a disaster occurs that causes the production system unavailable for running over the production information system to meet the organization Continuity requirements of business operations.

Data center for supporting the operation of information systems and environmental grounds, generally composed of power protection systems, air conditioning systems, security systems, surveillance system Systems, fire protection systems, racks and trays, office and living support facilities and the like.

Production centers productioncenter Use of data center space and environmental agencies support the production system running the important information agency performs centralized management and processing properties and organizations.

Disaster Recovery Center Agencies meet critical business operations continuity requirements, use of data center space and environmental agencies support disaster backup system running, resist Cause all or part of the production system unavailable disaster to take over some or all of the functions of production centers, important information centralized institutions Management and disposal sites and organizations.

Note. Disaster Recovery Center, also known as disaster recovery center or disaster recovery center. Disaster Recovery Center in accordance with the distance and risk prevention functions and production center can be divided into

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 30285-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
19 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 30285-2013

$375.00