GB/T 30245.2-2013Remote input and output instruments for industrial process measurement and control systems—Part 2: Performance evaluating methods (English PDF)
工业过程测量和控制系统用远程输入输出设备 第2部分:性能评定方法
This is a limited preview
Buy now to download the full PDF (25 pages)
Need quotation for your management?
Get a formal quotation for GB/T 30245.2-2013 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 31, 2013
Implementation date
July 1, 2014
Scope
GB/T 30245.2-2013 is the English-translated version of 工业过程测量和控制系统用远程输入输出设备 第2部分:性能评定方法.
GB/T 30245.2-2013 is the Chinese standard "Remote input and output instruments for industrial process measurement and control systems—Part 2: Performance evaluating methods".
Its scope clause reads: This section GB/T 30245 requirements for industrial process measurement and control systems with remote input and output devices - Performance evaluation and inspection Inspection rules, including test conditions, the test sample, the normal work and functions of type testing, electromagnetic compatibility (EMC) type testing and verification, security Whole routine testing, inspection rules and other considerations.
This section applies to the sensors and actuators without an industrial process measurement and control system components with the remote input and output devices.
Found what you need?
Document preview — GB/T 30245.2-2013
National Standard of the People's Republic of China
- ICS
- 35.100
- Classification
- N 18
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Acronyms
- 4 Test conditions
- 3 of 5 test sample
- 6 to work and function test type
- 7 Electromagnetic compatibility (EMC) type test and validate
- 8 General safety test
- 9 inspection rules
- 10 Other considerations
- 11 24 test reports and documentation
- References
- 3 power supply voltage change quickly test
- 4 supply voltage slowly change map test
1 Scope
This section GB/T 30245 requirements for industrial process measurement and control systems with remote input and output devices - Performance evaluation and inspection
Inspection rules, including test conditions, the test sample, the normal work and functions of type testing, electromagnetic compatibility (EMC) type testing and verification, security
Whole routine testing, inspection rules and other considerations.
This section applies to the sensors and actuators without an industrial process measurement and control system components with the remote input and output devices.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2423.1-2008 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold
GB/T 2423.2-2008 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat
GB/T 2423.4-2008 Environmental testing for electric and electronic products Part 2. Test methods - Test Db. Damp heat (12h
12h cycle)
GB/T 2423.5-1995 Environmental testing for electric and electronic products Part 2. Test methods Test Ea and guidance. Shock
GB/T 2423.7-1995 Environmental testing for electric and electronic products Part 2. Test Ec and guidance. Drop and turn
Down (Primarily for equipment - type specimens)
GB/T 2423.8-1995 Environmental testing for electric and electronic products Part 2. Test methods Test Ed. Free fall
GB/T 2423.10-2008 Environmental testing for electric and electronic products Part 2. Test methods Test Fc. Vibration (sinusoidal)
GB/T 2828.1-2012 Sampling procedures for inspection - Part 1. by acceptance quality limit (AQL) retrieval batch test sample plan
GB 4208-2008 shell protection (IP code)
GB 4793.1-2007 measurement, control and laboratory safety requirements for electrical equipment - Part 1. General requirements
GB 4824-2004 industrial, scientific and medical (ISM) radio-frequency equipment - Electromagnetic disturbance characteristics - Limits and methods of measurement
GB/T 4857.5 packaging transport package drop test methods
GB/T 14048.10-2008 voltage switchgear and control equipment Part 5-2. Control circuit devices and switching elements proximity switch
GB/T 16842-2008 housing for people and equipment protection test with a test
GB/T 17626.2-2006 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test
GB/T 17626.3-2006 Electromagnetic compatibility - Testing and measurement techniques RFEMS test
GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test
GB/T 17626.6-2008 Electromagnetic compatibility - Testing and measurement techniques Immunity to conducted disturbances induced field
GB/T 17626.8-2006 Electromagnetic compatibility - Testing and measurement techniques - Power frequency magnetic field immunity test
GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity test […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 30245.2-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 30245.1-2013 — Remote input and output instruments for industrial process measurement and control systems—Part 1: General technical conditions
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 30245.2-2013