GB/T 30217.1-2013Petroleum and natural gas industries -- Drilling and production equipment -- Part 1: Design and operation of marine drilling riser equipment (English PDF)
石油天然气工业 钻井和采油设备 第1部分:海洋钻井隔水管设备的设计和操作
This is a limited preview
Buy now to download the full PDF (89 pages)
Need quotation for your management?
Get a formal quotation for GB/T 30217.1-2013 in 30 minutes.
Issued by
Standardization Administration of China
Level / Type
National · Recommended
Issue date
December 31, 2013
Implementation date
October 1, 2014
Scope
GB/T 30217.1-2013 is the English-translated version of 石油天然气工业 钻井和采油设备 第1部分:海洋钻井隔水管设备的设计和操作.
GB/T 30217.1-2013 — GB/T 30217 apply to this part of the floating marine drilling riser system design, selection, operation and maintenance. This section it is intended for designers, system components as well as personnel selection and maintenance of the equipment referenced.
This depends in part on the original basic engineering Marine management and operating personnel, contractors and manufacturers accumulated experience. Note. this technology advances, advanced methods and equipment after another.
Encourage every owner and operator to follow this recommendation as part of the presentation Law and to supplement these with other technologies recommended practice proven to reduce costs, improve security and (or) reliability.
It should be regarded as a marine drilling riser system. Designers, contractors and operators should be recognized and recommended a single member of the election Selection method should be suitable for the overall performance of the system.
In this section, the marine drilling riser system includes a tensioner system and UFJ or ball joint all devices connected to the top and lower wellhead connector between, it does not include a splitter.
And, GB/T 30217 in this section applies only Configured for use with subsea BOP stacks together underwater operations. Part 1 of this chapter - Chapter 7 is directly applicable to the majority of floating drilling operations.
8.1 and 8.4 expressions involving deepwater drilling and crowded Destroyed exceptional circumstances. 8.2 expresses no special considerations guide rope drilling required.
In addition, 8.3 and 8.5 and expressed the cold weather conditions Operating under conditions of H2S. It is important that all riser main load path parts in this section are expressed in accordance with ISO 13625 predetermined load classification.
Found what you need?
Document preview — GB/T 30217.1-2013
National Standard of the People's Republic of China
- ICS
- 75.180.10
- Classification
- E 92
Issued by: Standardization Administration of China
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms, Definitions and Abbreviations
- 3.1 Terms and definitions
- 9 3.2 Acronyms
Foreword
GB/T 30217 "Petroleum and natural gas industries - Drilling and production equipment" is divided into two parts.
--- Part 1. marine drilling riser equipment design and operation;
--- Part 2. Deepwater drilling riser analysis, operations, and integrity technical report.
This section GB/T Part of 130,217.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This section uses the translation method identical with ISO 13624-1:2009 "Petroleum and natural gas industries - Drilling and production equipment - Part 1.
Marine drilling riser equipment design and operation. " Consistency correspondence between this part of international documents and normative references of our files are as follows.
--- SY/T 6917-2012 Petroleum and natural gas industries - Drilling and production equipment - Marine drilling riser joints (ISO 13625.
2002, MOD)
This section also made the following editorial changes.
--- Corrected text of the error.
This part of the National Oil Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96) and focal points.
This section is responsible for drafting. National oil and gas drilling equipment engineering and technology research center.
This section participated in the drafting unit. China Oilfield Services Limited, the oil industry well control equipment for Quality Supervision and Inspection Center, Baoji stone Oil Machinery Co., Ltd., CNOOC Energy Pipeline Engineering Branch development drilling pipe, finite Hebei North China Petroleum Rongsheng Machinery Manufacturing the company.
1 Scope
GB/T 30217 apply to this part of the floating marine drilling riser system design, selection, operation and maintenance. This section it is intended for designers, system components as well as personnel selection and maintenance of the equipment referenced. This depends in part on the original basic engineering Marine management and operating personnel, contractors and manufacturers accumulated experience.
Note. this technology advances, advanced methods and equipment after another. Encourage every owner and operator to follow this recommendation as part of the presentation Law and to supplement these with other technologies recommended practice proven to reduce costs, improve security and (or) reliability.
It should be regarded as a marine drilling riser system. Designers, contractors and operators should be recognized and recommended a single member of the election Selection method should be suitable for the overall performance of the system. In this section, the marine drilling riser system includes a tensioner system and UFJ or ball joint all devices connected to the top and lower wellhead connector between, it does not include a splitter. And, GB/T 30217 in this section applies only Configured for use with subsea BOP stacks together underwater operations.
Part 1 of this chapter - Chapter 7 is directly applicable to the majority of floating drilling operations. 8.1 and 8.4 expressions involving deepwater drilling and crowded Destroyed exceptional circumstances. 8.2 expresses no special considerations guide rope drilling required. In addition, 8.3 and 8.5 and expressed the cold weather conditions Operating under conditions of H2S.
It is important that all riser main load path parts in this section are expressed in accordance with ISO 13625 predetermined load classification.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.
ISO 13625 Petroleum and natural gas industries - Drilling and production equipment - Marine drilling riser joints (Petroleumandnatural gasindustries-Drilingandproductionequipment-Marinedrilingrisercouplings) BS7910 metal structural defects Acceptance Assessment Methodology Guide (Guidetomethodsforassessingtheacceptabilityof flawsinmetalicstructures)
3 Terms, definitions and abbreviations
3.1 Terms and Definitions
The following terms and definitions apply to this document.
3.1.1
Accumulators (for BOP) accumulator Filled ullage gas (nitrogen) pressure vessel for storing hydraulic fluid under pressure to operate the BOP.
3.1.2
Accumulators (for riser tensioner) accumulator Ullage filling gas pressure vessels, high pressure gas from the tensioner for cylinders in the pressure vessel pressurized gas side, the supply of high pressure
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 89 pages — is available in the English PDF.
Referenced standards
Normative references
ISO 13625
How to Download GB/T 30217.1-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 30217.2-2016 — Petroleum and natural gas industries -- Drilling and production equipment -- Part 2: Deepwater drilling riser analysis methodologies, operations and integrity
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 30217.1-2013
$1,230.00