Valid

GB/T 29580-2013Time-based cost-allocation device for central air-conditioning (English PDF)

时间法集中空调分户计量装置

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 29580-2013 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

July 19, 2013

Implementation date

March 1, 2014

Scope

GB/T 29580-2013 is the English-translated version of 时间法集中空调分户计量装置.

GB/T 29580-2013 is the Chinese standard "Time-based cost-allocation device for central air-conditioning".

Its scope clause reads: This standard specifies the Time Act of central air conditioning household metering apparatus (hereinafter referred to as the device) terms and definitions, requirements, test methods, inspection Rules, labeling, transportation and storage This standard applies to central air conditioning systems by calculating the terminal equipment uptime-off control, to household metering apparatus. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 29580-2013

National Standard of the People's Republic of China

ICS
17.040.30
Classification
N 13

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 requires
  • 5 Test Method
  • 6 Inspection rules
  • 7 marking, transportation and storage of
  • Appendix A (informative) Time Act of central air conditioning household metering device structure
  • Annex C (informative) Time Act of central air conditioning household metering device management software

1 Scope

This standard specifies the Time Act of central air conditioning household metering apparatus (hereinafter referred to as the device) terms and definitions, requirements, test methods, inspection

Rules, labeling, transportation and storage

This standard applies to central air conditioning systems by calculating the terminal equipment uptime-off control, to household metering apparatus.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 191 Packaging - Pictorial signs

GB/T 2423.1 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold

GB/T 2423.2 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat

GB 4793.1 measurement, control and laboratory safety requirements for electrical equipment - Part 1. General requirements

GB/T 6388 transport package shipping mark

GB/T 6587-2012 General specification for electronic measuring instruments

GB/T 9969 General Instructions industrial products

GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test

GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test

GB/T 17626.8-2008 Electromagnetic compatibility - Testing and measurement techniques - Power frequency magnetic field immunity test

GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity test

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Time Act sub-metering time-basedcost-alocation

Central air conditioning terminal equipment to control equivalent time off based on the methods of cold (hot) the amount assessed.

3.2 Time Act of central air conditioning household metering apparatus

Central air conditioning system during normal operation, the end of the collection device switch state, wind speed and operating time and other information to calculate the different wind

Speed means the cumulative time of heat exchange. Household metering apparatus includes a data collection, transmission and processing of other functional modules.

End device terminal

Fan coil central air conditioning system, combined air conditioner, floor heating coils and other heat exchange equipment.

3.3 Heat exchange time heattransmissiontime

In the case of cooling (heating) system normal operation, the terminal equipment in the heat exchange condition cumulative run time.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 29580-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 29580-2013

$255.00