GB/T 29580-2013Time-based cost-allocation device for central air-conditioning (English PDF)
时间法集中空调分户计量装置
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 29580-2013 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
July 19, 2013
Implementation date
March 1, 2014
Scope
GB/T 29580-2013 is the English-translated version of 时间法集中空调分户计量装置.
GB/T 29580-2013 is the Chinese standard "Time-based cost-allocation device for central air-conditioning".
Its scope clause reads: This standard specifies the Time Act of central air conditioning household metering apparatus (hereinafter referred to as the device) terms and definitions, requirements, test methods, inspection Rules, labeling, transportation and storage This standard applies to central air conditioning systems by calculating the terminal equipment uptime-off control, to household metering apparatus. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 29580-2013
National Standard of the People's Republic of China
- ICS
- 17.040.30
- Classification
- N 13
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 requires
- 5 Test Method
- 6 Inspection rules
- 7 marking, transportation and storage of
- Appendix A (informative) Time Act of central air conditioning household metering device structure
- Annex C (informative) Time Act of central air conditioning household metering device management software
1 Scope
This standard specifies the Time Act of central air conditioning household metering apparatus (hereinafter referred to as the device) terms and definitions, requirements, test methods, inspection
Rules, labeling, transportation and storage
This standard applies to central air conditioning systems by calculating the terminal equipment uptime-off control, to household metering apparatus.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
GB/T 2423.1 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold
GB/T 2423.2 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat
GB 4793.1 measurement, control and laboratory safety requirements for electrical equipment - Part 1. General requirements
GB/T 6388 transport package shipping mark
GB/T 6587-2012 General specification for electronic measuring instruments
GB/T 9969 General Instructions industrial products
GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test
GB/T 17626.8-2008 Electromagnetic compatibility - Testing and measurement techniques - Power frequency magnetic field immunity test
GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity test
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Time Act sub-metering time-basedcost-alocation
Central air conditioning terminal equipment to control equivalent time off based on the methods of cold (hot) the amount assessed.
3.2 Time Act of central air conditioning household metering apparatus
Central air conditioning system during normal operation, the end of the collection device switch state, wind speed and operating time and other information to calculate the different wind
Speed means the cumulative time of heat exchange. Household metering apparatus includes a data collection, transmission and processing of other functional modules.
End device terminal
Fan coil central air conditioning system, combined air conditioner, floor heating coils and other heat exchange equipment.
3.3 Heat exchange time heattransmissiontime
In the case of cooling (heating) system normal operation, the terminal equipment in the heat exchange condition cumulative run time.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 29580-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 29580-2013
$255.00