GB/T 28558-2012Supercritical and ultra-supercritical generating set parameter series (English PDF)

超临界及超超临界机组参数系列

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 28558-2012 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

June 29, 2012

Implementation date

November 1, 2012

Scope

GB/T 28558-2012 is the English-translated version of 超临界及超超临界机组参数系列.

GB/T 28558-2012 is the Chinese standard "Supercritical and ultra-supercritical generating set parameter series". Its scope clause reads: This standard specifies the parameters, terms and definitions supercritical and ultra-supercritical units.

This standard applies to domestic production is rated at 350MW, 600MW, 660MW supercritical unit and the rated power As ultra-supercritical units 600MW, 660MW, 1000MW parameters series.

Supercritical and ultra-supercritical units specified in this standard is a reheat unit, the unit parameters expressed as. new steam pressure/new steam Temperature/reheat steam temperature.

Its clauses include terms and definitions; turbines, boilers and generators parameter series.

Found what you need?

Document preview — GB/T 28558-2012

National Standard of the People's Republic of China

ICS
27.100
Classification
K 54

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 turbines, boilers and generators parameter series

1 Scope

This standard specifies the parameters, terms and definitions supercritical and ultra-supercritical units.

This standard applies to domestic production is rated at 350MW, 600MW, 660MW supercritical unit and the rated power

As ultra-supercritical units 600MW, 660MW, 1000MW parameters series.

Supercritical and ultra-supercritical units specified in this standard is a reheat unit, the unit parameters expressed as. new steam pressure/new steam

Temperature/reheat steam temperature.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 754-2007 steam turbine power generation parameters series

GB/T 2900.46 Electrotechnical terminology - Steam turbine and auxiliary equipment

GB/T 2900.48-2008 Electrotechnical terminology boiler

3 Terms and Definitions

GB/T 754-2007, GB/T 2900.46, GB/T 2900.48-2008 defined and the following terms and definitions apply to this file.

3.1 Critical point of water

Water liquid and vapor phases can coexist in equilibrium parameters of the highest points of the inherent physical properties constant. Critical point of water temperature tc = 374.15 °C, the Provisional

Boundary point pressure pc = 22.129MPa.

3.2 Supercritical parameters

Steam parameter exceeds a critical point called supercritical pressure and temperature parameters.

3.3 USC ultra-supercriticalparameter

Steam turbine parameters than conventional supercritical parameters 24.2MPa/566 °C/566 °C when the inlet steam parameters.

3.4 Rated power

Under the new rated steam parameters, reheat steam parameters and backpressure prescribed rate feed water conditions, does not exceed the life, the power generation

Ensure continuous power at the motor terminals. The power is generally nameplate power.

NOTE. The back pressure should be considered here in the cold side of the cooling medium parameters highest annual temperature optimization.

4 turbines, boilers and generators parameter series

4.1

turbine, the boiler parameters Series Table 1.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 28558-2012

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 28558-2012

$105.00