GB/T 28557-2012Regulating evaluation of index on energy saving main parameter for electricity enterprise (English PDF)
电力企业节能降耗主要指标的监管评价
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 28557-2012 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
June 29, 2012
Implementation date
November 1, 2012
Scope
GB/T 28557-2012 is the English-translated version of 电力企业节能降耗主要指标的监管评价.
GB/T 28557-2012 is the Chinese standard "Regulating evaluation of index on energy saving main parameter for electricity enterprise". Its scope clause reads: This standard specifies the energy conversion efficiency of power companies and energy losses regulatory evaluation method itself.
This standard applies to electricity regulatory agencies on the grid and power generation for energy conservation and the main indicators of the regulatory process. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 28557-2012
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 power supply standard coal consumption and power consumption rate regulation
- 5 Integrated Power line loss rate regulation
- 6 Other types of energy regulation 3 power companies
- Appendix A (normative) to select power supply standard coal consumption baseline correction factor of
- Appendix B (normative) power supply standard coal consumption correction coefficient Select
- Annex C (normative) turbine plant power consumption rate correction coefficient Select
- Annex D (informative) The main level of energy efficiency of coal-fired generating units averages
1 Scope
This standard specifies the energy conversion efficiency of power companies and energy losses regulatory evaluation method itself.
This standard applies to electricity regulatory agencies on the grid and power generation for energy conservation and the main indicators of the regulatory process.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated edition applies to this article
Member. For undated references, the latest edition (including any amendments) applies to this document.
DL/T686 mains power loss calculation guide
DL/T904 thermal power plant technical and economic indicators calculation method
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Generation standard coal consumption
Generators each issue of coal per unit of energy consumed by the average, including the production of the amount of energy consumed directly, as well as to the production-sharing
The amount of energy the amount of energy and energy losses in the system and other products of auxiliary production systems and ancillary facilities for the production system of indirect consumption.
3.2 Power plant (field) power consumption rate
During the reporting period generator sets for power generation production plant (field) accounts for a percentage of electricity generation capacity.
3.3 Power supply standard coal consumption
Generators to provide power supply unit of the average amount of coal consumed to the grid.
Power supply standard coal consumption according to equation (1).
bg = bf1-Lfcy (1)
Where.
bg --- power supply standard coal consumption, in units of grams of standard coal per kWh [gce/(kW · h)];
bf --- generation standard coal consumption, in units of grams of standard coal per kWh [gce/(kW · h)];
Lfcy --- power plant power consumption rate,%.
3.4 Integrated grid line loss rate
Grid enterprises within the network coverage, the rate of energy loss in the power transmission network in all sectors generated. Calculation conditions Press DL/T686
Execution, integrated power grid line loss rate is calculated according to the formula (2).
Integrated grid line loss rate = [(power supply - electricity sales)/power supply] × 100% (2) […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 28557-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 28557-2012
$195.00