Valid

GB/T 28029.4-2020Electronic railway equipment - Train communication network (TCN) - Part 2-3: TCN communication profile (English PDF)

Also coversGBT28029.4-2020

Open the GB/T 28029.4-2020 preview as PDF

Preview — first pages of GB/T 28029.4-2020

This is a limited preview

Buy now to download the full PDF

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

March 6, 2020

Implementation date

October 1, 2020

Scope

GB/T 28029.4-2020 (Electronic railway equipment - Train communication network (TCN) - Part 2-3: TCN communication profile) is available as an English-translated PDF.

GB/T 28029.4-2020 — This part of GB/T 28029 specifies the communication protocol of the train communication network to ensure the Ethernet train defined in GB/T 28029.6 The interconnection between the various groups of the backbone network. The communication protocol aims to ensure the interoperability of information exchange between train formations. All elements necessary for communication interoperability are defined. a) An architecture with defined train directions related to different train views; b) General functional addressing concept; c) General communication protocol for data exchange between functions; d) Service set of train communication control. As a limitation, this communication protocol follows the Ethernet Train Backbone (ETB) technology defined in GB/T 28029.6. For marshalling networks, Define a more abstract interface so as not to limit the marshalling network technology [eg MVB (GB/T 28029.9), CANopen (GB/T 28029.11) Or ECN (GB/T 28029.12)]. Definition of application data content and its meaning (e.g. syntax and semantics) do not belong to the category of communication protocols, but belong to the category of application protocols As shown in Figure 1, two application protocols are explicitly supported. the TCMS application protocol defined in GB/T 28029.5 and the IEC 62580 series standard definition The relevant regulations of the on-board multimedia and information service (OMTS). Figure 1 GB/T 28029.4 as the connection element between the train backbone network and the application

Document preview — GB/T 28029.4-2020

National Standard of the People's Republic of China

ICS
45.060
Classification
S 70

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Foreword
  • 3 5.6.4, 6.4.4, 6.6.1, C.2.1, C.2.2, C.6.4, C.6.5, C.7.4, C.7.5).
  • Introduction
  • 1 Scope

Foreword

GB/T 28029 "Train Communication Network (TCN) for Rail Transit Electronic Equipment" is divided into the following 12 parts.

--- Part 1. Basic structure;

--- Part 2-1. Stranded Train Bus (WTB);

--- Part 2-2. Conformance Test of Wire Train Bus (WTB)

--- Part 2-3. TCN Communication Protocol;

--- Part 2-4. TCN Application Specification;

--- Part 2-5. Ethernet Train Backbone (ETB);

--- Part 2-6. Vehicle-ground communication;

--- Part 2-7. Radio-based Wireless Train Backbone Network (WLTB);

--- Part 3-1. Multifunctional Vehicle Bus (MVB);

--- Part 3-2. Multi-function vehicle bus (MVB) conformance test;

--- Part 3-3. CANopen Marshalling Network (CCN);

--- Part 3-4. Ethernet Marshalling Network (ECN).

This part is part 2-3 of GB/T 28029.

This section was drafted in accordance with the rules given in GB/T 1.1-2009.

This part uses the redrafting method to modify the adoption of IEC 61375-2-3..2015 "Train Communication Network (TCN) for Rail Transit Electronic Equipment

Part 2-3. TCN Communication Protocol.

Compared with IEC 61375-2-3..2015, there are structural changes in this part. The order of appendices has been adjusted. Appendix F has been adjusted to appendix A and appendix E.

Adjust to Appendix B, Appendix A to Appendix C, Appendix G to Appendix D, Appendix B to Appendix E, and Appendix C to Appendix

F, Appendix D is adjusted to Appendix G.

Compared with IEC 61375-2-3..2015, there are technical differences between this part and the terms involved in these differences have been passed on the outside margin

The vertical single line (|) in the white position is marked. The specific technical differences and the reasons are as follows.

--- Added the content of "Regulations" in the scope to meet the requirements of GB/T 1.1 (see Chapter 1).

--- With regard to normative quotation documents, this part has been adjusted with technical differences to adapt to China's technical conditions and adjustments

The situation is reflected in Chapter 2 "Regulatory Reference Documents", with specific adjustments as follows.

* Replace ISO /IEC 9646-6..1994 with GB/T 17178.6 equivalent to international standards (see A.5);

* Replace ISO /IEC 9646-7..1995 with GB/T 17178.7 equivalent to international standards (see A.5);

* Deleted ISO /IEC 17011..2004, ISO /IEC 17025..2005;

* Replace IEC 61375-1 with GB/T 28029.1 modified to adopt international standards (see 3.1, 4.2.2.1, 4.2.2.2, 4.2.4.2,

5.6.4, C.6.3.1, C.6.3.2, C.7.3.1, C.7.3.2);

* Replace IEC 61375-2-1 (see 3.1, 3.3.5) with GB/T 28029.2 modified to adopt international standards;

* Replace IEC 61375-2-4 with modified GB/T 28029.5 adopting international standards (see 3.3.5.1, 4.2.5.3, 4.3.2,

4.3.3, 5.4.4.5, A.2, A.7.6, A.10);

* Replace IEC 61375-2-5 with GB/T 28029.6 modified to adopt international standards (see 4.2.2.5, 4.2.3.1, 4.2.3.2,

4.2.4, 4.2.5.4, 5.2.1, 5.3.1, 5.3.2, 5.3.3, 5.3.4.2, 5.4.1, 5.4.4.3, 5.4.5.1, 5.4.5.2, 5.4.5.5, 5.5.

3 5.6.4, 6.4.4, 6.6.1, C.2.1, C.2.2, C.6.4, C.6.5, C.7.4, C.7.5).

* Added references to GB/T 16262 (all parts), GB/T 20438.1, GB/T 20830-2015, GB/T 25119,

IEC 62580 (all parts), IEEE802.3, UIC550 and UIC556 (see 3.3.1, 4.3.2, 6.8.2, A.7.4, E.3,

E.7).

--- Deleted the terms and definitions not used in the text (see Chapter 3).

--- Modified the definition of the decomposed form of the restricted group, the original text conflicts with the textual provisions in paragraph 2 of Table 19 and Table 21 (see 5.4.5.2.

--- Modified the process data priority of Table 28, the original IEC standard is defined as 3, which is at the highest priority and is the same as the monitoring data

Priority, in general practical applications, other data in the network should be lower than the monitoring data, so this part is modified to 2 ~ 3, compared with

The scope of IEC 61375-2-3 is broader, allowing the use of priority 2 to be lower than the priority of monitoring data (see 5.6.4).

--- Added description of the service primitive in PD.putData, IEC 61375-2-3 missed the description of the service primitive, this part

Complete supplement (see C.6.6.1).

This section also made the following editorial changes.

--- This part incorporates the technologies of IEC 61375-2-3..2015/COR1..2015 and IEC 61375-2-3..2015/COR2..2016

Errata content, the terms involved in these errata content have been carried out by the vertical double line (|) on the outer margin of its outer margin

Marking;

--- Removed the UIC prefix named by the UIC prefix for grouping and vehicle identifiers;

--- Modify the examples of Figure 16, Table 6, 5.3.3.2.16 g), Figure 21, 5.4.5.2, Table 21, Figure 22, 5.5.3 Example 4, Table 27, Table 29, Figure

31, Table 36, Figure 36, Table 43, Table 44, Table 49, Figure B.3, B.5.2.2, Figure B.9, Figure B.10, paragraph 2 of C.5, C.6.6. 3rd

6 paragraphs, Table C.1, Table C.10, Table C.15 (see Figure 15 of IEC 61375-2-3, Table 5, d of 5.3.3.2.16), Figure 20, 5.4.5.2,

Table 20, Figure 21, Example 3 of 5.5.3, Table 26, Table 28, Figure 30, Table 35, Figure 35, Table 42, Table 43, Table 48, paragraph 2 of A.5,

Paragraph 6 of A.6.6.3, Table A.1, Table A.10, Table A.15, Figure E.3, E.5.2.2, Figure E.9, Figure E.10].

Please note that some content of this document may involve patents. The issuer of this document does not assume responsibility for identifying these patents.

This part is proposed by the State Railway Administration.

This part is under the jurisdiction of the National Technical Committee for Standardization of Traction Electrical Equipment and Systems (SAC/TC278).

This section was drafted by. CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd., China Railway Science Research Institute Group Co., Ltd. rolling stock

Research Institute, CRRC Changchun Rail Bus Co., Ltd., CRRC Zhuzhou Electric Locomotive Co., Ltd., CRRC Nanjing Puzhen Vehicle Co., Ltd., CRRC

Che Tangshan Locomotive Co., Ltd., CRRC Qingdao Sifang Vehicle Research Institute Co., Ltd.

Introduction

GB/T 28029 elaborates the interaction of relevant data in the train communication network (TCN) in the rail transit train control and monitoring system

Cheng. These rules include a variety of communication technologies, covering the physical layer to the application layer.

The main purpose of this part of GB/T 28029 is to.

a) Define the interconnection requirements of the Ethernet train backbone network;

b) Standardize user requirements documents and give them in the form of standard documents;

c) Provide technical solutions for train backbone network interconnection;

d) Define the consistency test guideline, which is used for consistency detection of the communication protocol between groups (see Appendix A).

Related functional train applications are defined by GB/T 28029.5 and are not described in this section.

Rail Transit Electronic Equipment Train Communication Network (TCN)

Part 2-3. TCN communication protocol

1 Scope

This part of GB/T 28029 specifies the communication protocol of the train communication network to ensure the Ethernet train defined in GB/T 28029.6

The interconnection between the various groups of the backbone network.

The communication protocol aims to ensure the interoperability of information exchange between train formations. All elements necessary for communication interoperability are defined.

a) An architecture with defined train directions related to different train views;

b) General functional addressing concept;

c) General communication protocol for data exchange between functions;

d) Service set of train communication control.

As a limitation, this communication protocol follows the Ethernet Train Backbone (ETB) technology defined in GB/T 28029.6. For marshalling networks,

Define a more abstract interface so as not to limit the marshalling network technology [eg MVB (GB/T 28029.9), CANopen (GB/T 28029.11)

Or ECN (GB/T 28029.12)].

Definition of application data content and its meaning (e.g. syntax and semantics) do not belong to the category of communication protocols, but belong to the category of application protocols

As shown in Figure 1, two application protocols are explicitly supported. the TCMS application protocol defined in GB/T 28029.5 and the IEC 62580 series standard definition

The relevant regulations of the on-board multimedia and information service (OMTS).

Figure 1 GB/T 28029.4 as the connection element between the train backbone network and the application

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 28029.4-2020

  1. 1Add to cart. Click the "Buy GB/T 28029.4-2020" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 28029.4-2020

$3,335.00

$2,835.00for partners