Valid

GB/T 28029.8-2020Electronic railway equipment - Train communication network (TCN) - Part 2-7: Radio based Wireless Train Backbone (WLTB) (English PDF)

Also coversGBT28029.8-2020

Open the GB/T 28029.8-2020 preview as PDF

Preview — first pages of GB/T 28029.8-2020

This is a limited preview

Buy now to download the full PDF

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

March 6, 2020

Implementation date

October 1, 2020

Scope

GB/T 28029.8-2020 (Electronic railway equipment - Train communication network (TCN) - Part 2-7: Radio based Wireless Train Backbone (WLTB)) is available as an English-translated PDF.

GB/T 28029.8-2020 — This part of GB/T 28029 specifies the protocol stack of radio-based wireless train backbone network, which is suitable for distributed power Freight train. This section describes the data link layer, application layer, and distributed power applications. This section does not consider automatic initial operation of the radio-based train backbone network.

Document preview — GB/T 28029.8-2020

National Standard of the People's Republic of China

ICS
45.060
Classification
S 70

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Foreword
  • 8.3 of.2014);
  • 1 Scope
  • 2 Normative references
  • 3 Terms, definitions and abbreviations
  • 3.1 Terms and definitions

Foreword

GB/T 28029 `` Train Communication Network (TCN) for Electronic Equipment of Rail Transit '' is divided into the following 12 parts.

--- Part 1. Basic structure;

--- Part 2-1. Stranded Train Bus (WTB);

--- Part 2-2. Twisted Train Bus (WTB) conformance test;

--- Part 2-3. TCN communication protocol;

--- Part 2-4. TCN application protocol;

--- Part 2-5. Ethernet Train Backbone Network (ETB);

--- Part 2-6. Vehicle-ground communication;

--- Part 2-7. Radio-based Wireless Train Backbone Network (WLTB);

--- Part 3-1. Multifunctional Vehicle Bus (MVB);

--- Part 3-2. Multifunctional Vehicle Bus (MVB) conformance test;

--- Part 3-3. CANopen Marshalling Network (CCN);

--- Part 3-4. Ethernet grouping network (ECN).

This part is part 2-7 of GB/T 28029.

This section is drafted in accordance with the rules given in GB/T 1.1-2009.

This part uses the redrafting method to modify and adopt IEC TR61375-2-7..2014 "railway electronic equipment train communication network

(TCN) Part 2-7. Wireless Train Backbone Network (WLTB).

Compared with IEC TR61375-2-7..2014, this part is structurally adjusted.Chapter 2 and 8.4.1 have been added, 4.4, 4.5, and attachments have been deleted.

Record A, the subsequent article numbers are changed in turn, Table 3 is added, and the serial numbers of subsequent tables are modified in turn. 9.3.3 ~ 9.3.8 are adjusted as Appendix A.

This section is technically different from IEC TR61375-2-7..2014, and the terms related to these differences have been passed on its outer page

The vertical single line (|) at the margin is marked.The specific technical differences and their causes are as follows.

--- Added normative references GB/T 28029.1, GB/T 28029.2, GB/T 28029.4, GB/T 28029.5,

GB/T 28029.6 (see Chapter 2);

--- Deleted some terms and definitions, which have been defined in GB/T 28029.1 and GB/T 28029.2 (see IEC TR61375-2-7.

2014 2.1.1 ~ 2.1.12, 2.1.14 ~ 2.1.20, 2.1.22, 2.1.23, 2.1.25, 2.1.26);

--- Added the term and definition of "node number" (see 3.1.7);

--- Removed the abbreviations of "CAN", "CN" and "TCP/IP" (see 2.2 of IEC TR61375-2-7..2014);

--- Removed the modulation, antenna and feeder to meet China's national conditions (see 4.4, 4.5 of IEC TR61375-2-7..2014);

--- Modify "5.1 Overview" to "5.1 Frequency", consistent with the content (see 5.1, 4.1 of IEC TR61375-2-7..2014);

--- Amended the radio transmission power regulations in 5.2 to meet China's national conditions (see 5.2, 4.2 of IEC TR61375-2-7..2014);

--- Modified the radio frequency regulations in 5.3 to meet China's national conditions (see 5.3, 4.3 of IEC TR61375-2-7..2014);

--- Modified the communication schedule of 7.1.1, according to the revised text description to modify Figure 4, in accordance with China's national conditions (see 7.1.1,

(IEC TR61375-2-7..2014 6.1.1);

--- Modified the 7.1.2 WNL sending instruction process to conform to China's national conditions, modify Figure 5 according to the process (see 7.1.2, IEC TR

61375-2-7..2014 6.1.2);

--- Modify "LTV and GTV" to "WNL and WNG" to make the context unified, and modify Figure 6 according to the standard flowchart (see 7.1.3,

(IEC TR61375-2-7..2014 6.1.3);

--- Modified the PDU structure diagram of Figure 7 of 7.2, the description is not clear (see 7.2, 6.2 of IEC TR61375-2-7..2014);

--- Modified Table 2 of 7.2, the user data set is not only the initial run data set, but also the process data set.

"First Run PDU" changed to "PDU" (see 7.2, 6.2 of IEC TR61375-2-7..2014);

--- Added 8.4.1 "initial operation control code" and added Table 3 "initial operation control code definition" for easy understanding (see 8.4.1);

--- Added "8, DistanceofTV5, distance between traction locomotive 5 and traction locomotive 4, 2" in Table 5, and recalculated subsequent rows

To meet China's national conditions (see 8.4.3);

--- Modify the "decoder" in Figure 9 to "encoder/decoder" to meet China's national conditions (see 10.2, IEC TR61375-2-7..2014's

9.2.1);

--- Modify the title "Overview" of 10.3.1 to "Train Composition Configuration", the functional modules are listed according to the specific content in the text, which is convenient for bidding

Accurate understanding (see 10.3.1, 9.3.1 of IEC TR61375-2-7..2014);

--- Modify the "traction state" in 10.3.4.2 to the "original running state" to facilitate the understanding of the standard (see 10.3.4.2, IEC TR61375-

2-7..2014's 9.3.10.2).

The following editorial changes have also been made in this section.

--- Modify the standard name to "Train Electronic Network for Train Communication (TCN) Part 2-7. Radio Based on Radio

Train Backbone Network (WLTB);

--- Removed the introduction;

--- Adjusted some column item numbers (see 8.2);

--- Modified the error in IEC TR61375-2-7..2014.

* The last row of the offset column in Table 2 of 7.2 was modified. According to the length (bytes), "6" was changed to "8" (see 7.2, IEC TR61375-

2-7. 6.2 of.2014);

* Modified the offset column of Table 4 in 8.4.2 and rearranged according to the length of each parameter (see 8.4.2, IEC TR61375-2-7.

2014 7.4.1);

* Modified the offset column of Table 5 in 8.4.3 and rearranged according to the length of each parameter (see 8.4.3, IEC TR61375-2-7.

2014 7.4.2);

* Modified the offset column of Table 6 in 8.4.4 and rearranged according to the length of each parameter (see 8.4.4, IEC TR61375-2-7.

2014 7.4.3);

* Modified the offset column of Table 7 in 8.4.5 and rearranged according to the length of each parameter (see 8.4.5, IEC TR61375-2-7.

2014.7.4.4);

* Modified the offset column of Table 8 in 8.4.6 and rearranged according to the length of each parameter (see 8.4.6, IEC TR61375-2-7.

2014 7.4.5);

* Modified the offset column of Table 10 in 8.4.8 and rearranged according to the length of each parameter (see 8.4.8, IEC TR61375-2-7.

2014 7.4.7);

* Modified the offset column of Table 11 in 9.2, rearranged according to the length of each parameter (see 9.2, IEC TR61375-2-7.

2014 8.2);

* Modified the offset column of Table 12 in 9.3 and rearranged according to the length of each parameter (see 9.3, IEC TR61375-2-7.

8.3 of.2014);

* In 10.3.2, "When the parameters for GTV are input, the GTV enters the initial operation waiting state." Is modified to "Dang to

After the LTV parameter input is completed, the LTV enters the initial operation waiting state. "(See 10.3.2, IEC TR61375-2-7..2014

9.3.2).

Please note that some elements of this document may involve patents. The issuer of this document is not responsible for identifying these patents.

This section is proposed by the National Railway Administration.

This section is under the jurisdiction of the National Technical Committee for Standardization of Traction Electrical Equipment and Systems (SAC/TC278).

This section was drafted. CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd., China Railway Science Research Institute Group Co., Ltd.

Research Institute, China Shenhua Energy Co., Ltd. Shenshuo Railway Branch, CRRC Zhuzhou Electric Locomotive Co., Ltd., CRRC Qingdao Sifang Vehicles

Institute Ltd.

1 Scope

This part of GB/T 28029 specifies the protocol stack of radio-based wireless train backbone network, which is suitable for distributed power

Freight train. This section describes the data link layer, application layer, and distributed power applications.

This section does not consider automatic initial operation of the radio-based train backbone network.

2 Normative references

The following documents are essential for the application of this document. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 28029.1 Rail communication electronic equipment Train communication network (TCN) Part 1. Basic structure (GB/T 28029.1-

(2020, IEC 61375-1..2012, MOD)

GB/T 28029.2 Rail communication electronic equipment Train communication network (TCN) Part 2-1. Stranded train bus (WTB)

(GB/T 28029.2-2020, IEC 61375-2-1..2012, MOD)

GB/T 28029.4 Rail communication electronic equipment train communication network (TCN) Part 2-3. TCN communication protocol

(GB/T 28029.4-2020, IEC 61375-2-3..2015, MOD)

GB/T 28029.5 Rail communication electronic equipment train communication network (TCN) Part 2-4. TCN application protocol

(GB/T 28029.5-2020, IEC TS61375-2-4..2017, MOD)

GB/T 28029.6 Rail communication electronic equipment train communication network (TCN) Part 2-5. Ethernet train backbone network

(ETB) (GB/T 28029.6-2020, IEC 61375-2-5..2014, MOD)

3 Terms, definitions and abbreviations

3.1 Terms and definitions

The terms and definitions defined in GB/T 28029.1 and GB/T 28029.2 as well as the following terms apply to this document.

3.1.1

Operation direction

The direction in which a train travels from station to station along a railway line.

Note. Usually divided into two directions, that is, upward and downward.

3.1.2

Multi-hoprelaycommunication

For devices that cannot communicate directly, they can communicate with each other through the relay function of other devices.

3.1.3

Leadingtractionvehicle

Traction locomotive at the end of the train's forward direction.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 28029.8-2020

  1. 1Add to cart. Click the "Buy GB/T 28029.8-2020" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 28029.8-2020

$360.00

$305.00for partners