GB/T 27737-2011Calculation method of energy equilibrium and energy efficiency in oxygen generation station system (English PDF)
制氧站系统能量平衡及能量效率计算方法
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 27737-2011 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 30, 2011
Implementation date
July 1, 2012
Scope
GB/T 27737-2011 is the English-translated version of 制氧站系统能量平衡及能量效率计算方法.
GB/T 27737-2011 is the Chinese standard "Calculation method of energy equilibrium and energy efficiency in oxygen generation station system". Its scope clause reads: This standard specifies the calculation method of energy balance and oxygen stations energy efficiency.
This standard applies to the energy balance of the pulp and paper business pressure swing adsorption (PSA) oxygen station systems and energy efficiency testing and calculations.
Its clauses include a block diagram of the energy balance; energy balance calculation formula described.
Found what you need?
Document preview — GB/T 27737-2011
National Standard of the People's Republic of China
- ICS
- 85.010
- Classification
- Y 30
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 a block diagram of the energy balance
- 2.2 System Boundaries
- 3 energy balance calculation formula described
- 3.1 Calculation of heat
- 3.2 Energy calculation (to calculate the total power load system-wide P)
1 Scope
This standard specifies the calculation method of energy balance and oxygen stations energy efficiency.
This standard applies to the energy balance of the pulp and paper business pressure swing adsorption (PSA) oxygen station systems and energy efficiency testing and calculations.
2 a block diagram of the energy balance
2.1
Oxygen station energy balance block diagram shown in Figure 1.
Oxygen station system of FIG. 1 a block diagram of the energy balance
2.2 System Boundaries
oxygen from the air into the station system began to be made final until the oxygen.
3 energy balance calculation formula described
3.1 Calculation of heat
Oxygen production process does not use steam process, water is not used, so the heat can be calculated negligible.
3.2 Energy calculation (to calculate the total power load system-wide P)
Calculate the total power load system-wide P see equation (1), namely.
P = sigmapsi · Ki · Pi = psi · (K1 · P1 K2 · P2 Kn · Pn) (1)
Where.
psi --- mixed coefficient, generally take psi = 0.8 ~ 0.9;
Ki --- need coefficient of electrical equipment;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 27737-2011
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 27737-2011
$85.00