Valid

GB/T 26978.5-2011Design and manufacture of site built, vertical, cylindrical flat-bottomed steel tanks for the storage of liquefied nature gases -- Part 5: Testing, drying, purging and cool-down (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (9 pages)

Need quotation for your management?

Get a formal quotation for GB/T 26978.5-2011 in 30 minutes.

Issued by

Standardization Administration of China

Level / Type

National · Recommended

Issue date

September 29, 2011

Implementation date

March 1, 2012

Scope

GB/T 26978.5-2011 (Design and manufacture of site built, vertical, cylindrical flat-bottomed steel tanks for the storage of liquefied nature gases -- Part 5: Testing, drying, purging and cool-down) is available as an English-translated PDF.

GB/T 26978.5-2011 — This section provides test liquefied natural gas (LNG) storage tank, drying, replacement and cooling requirements. This section applies to on-site assembly of a vertical, cylindrical, flat, steel, liquefied natural gas operating temperature between 0 °C ~ -165 °C between Tank design and construction.

Found what you need?

Document preview — GB/T 26978.5-2011

National Standard of the People's Republic of China

ICS
75.060
Classification
E 24

Issued by: Standardization Administration of China

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Pressure test and pressure test
  • 4.1 Hydrostatic Test
  • 4.1.1 General Provisions
  • 4.1.2 Test requirements for various types of tank
  • 4.1.3 Additional requirements
  • 4.1.4 Water
  • 4.1.5 Conditions for implementation
  • 4.1.6 Filling process of inspection
  • 4.1.7 Water Filling
  • 4.2 Pressure Test
  • 4.2.1 Positive Pressure Test
  • 4.2.2 The test negative
  • 4.2.3 Emptying examination
  • 5 Drying, cooling and replacement
  • 5.1 Program
  • 5.2 Drying
  • 5.3 Replacement
  • 5.4 Cooling
  • 5 6 outage
  • Cooling Appendix A (informative) tank
  • Appendix NA (informative) of this section and EN14620-5:2006 7 technical differences and their causes
  • Reference

Foreword

GB/T 26978 "on-site assembly of vertical cylindrical flat steel LNG storage tank design and construction" is divided into the following five sections.

--- Part 1. General;

--- Part 2. metal member;

--- Part 3. Concrete components;

--- Part 4. heat insulating member;

--- Part 5. Testing, drying, replacement and cooling.

This section GB/T 26978-2011 Part 5.

This section drafted in accordance with GB/T 1.1-2009 given rules.

The partial modification using EN14620-5:2006 "on-site assembly of steel vertical cylindrical flat operating temperature is between 0 °C ~ -165 °C of Refrigerated liquefied gas storage tank design and construction - Part 5. Testing, drying, cooling and replacement "(in English).

The main differences are as follows.

Retains the LNG-related content, delete and LPG, ethylene, ethane and similar hydrocarbons and liquid ammonia, liquid Oxygen, liquid nitrogen and liquid argon storage and other related content.

Added "Appendix NA (informative)", which gives a list of the technical differences and the reasons for reference.

For ease of use, this section to legal units of measurement-based, non-statutory standard unit of measurement corresponding value in subsequent brackets.

Appendices A, NA in this section is informative appendix.

This part of the National Standardization Technical Committee on Petroleum and Natural Gas LNG Technical Committee (SAC/TC355/SC1) centralized.

This section is responsible for drafting unit. CNOOC Gas & Power Group Co., Ltd., China Petroleum Pipeline Engineering Co., Ltd.

This section participated in the drafting unit. China National Petroleum Corporation Tangshan LNG project manager, China Chengda Engineering Company, China Petrochemical Corporation Zhongyuan Petroleum Exploration Bureau of Investigation and Design Institute, China Petroleum and Natural Gas Pipeline Company.

1 Scope

This section provides test liquefied natural gas (LNG) storage tank, drying, replacement and cooling requirements.

This section applies to on-site assembly of a vertical, cylindrical, flat, steel, liquefied natural gas operating temperature between 0 °C ~ -165 °C between Tank design and construction.

2 Normative references

The following documents for the application of this document is essential, dated references, only the dated version suitable for use herein Member. For cited documents without a date. The latest version (including any amendments) applies to this document.

GB/T 26978.1-2011 site assembly vertical cylindrical flat steel LNG storage tank design and construction - Part 1.

General

3 Terms and Definitions

Terms and definitions GB/T 26978.1-2011 established in this document apply.

4 Pressure test and pressure test

4.1 Hydrostatic Test

4.1.1 General provisions

Pressure test should be carried out, it should be through the hydrostatic test to prove.

--- Completion of the design and construction of storage tanks can be loaded memory media (no leakage);

Note. this provision does not apply to a film canister. After the film cans, welding work is completed, replacing ammonia leak testing. Brushing sensitivity ammonia tank on the inside of the weld Paint. Ammonia gas into the thermal insulation space, once the leak ammonia, gas and the role of varnish, color from yellow to blue. To verify the test results in Reference holes opened on the film, to ensure the normal use inspection methods. After closing all leaks, conduct another test. Paint the inside of the tank using Vacuum cleaning methods to remove. You can see NFA09-106 comments.

--- Foundation able to withstand loads generated within the tank medium.

4.1.2 Test requirements for various types of storage tanks

For different types of tanks, pressure test should be carried out in accordance with Table 1.

The Contractor shall prepare a technical requirements, including all experimental work to be carried out. Test results should be recorded in the file format.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.

Referenced standards

Normative references

GB/T 26978.1-2011

How to Download GB/T 26978.5-2011

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
9 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 26978.5-2011

$534.00