Scope
GB/T 26978.3-2011 (Design and manufacture of site built, vertical, cylindrical, flat-bottomed steel tanks for the storage of liquefied natural gases -- Part 3: Concrete components) is available as an English-translated PDF.
GB/T 26978.3-2011 — This section of concrete LNG storage tank component materials, design, construction of the general requirements to make provision. This section applies to on-site assembly of a vertical, cylindrical, flat, steel, liquefied natural gas operating temperature between 0 °C ~ -165 °C between Tank design and construction.
Found what you need?
Document preview — GB/T 26978.3-2011
National Standard of the People's Republic of China
- ICS
- 75.060
- Classification
- E 24
Issued by: Standardization Administration of China
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- Overview 4
- Tightness 5
- 6 Material
- 6.1 Overview
- 6.2 Concrete
- 6.3 Prestressing steel and steel
- 6.3.1 Prestressing steel and anchorage
- 6.3.2 Reinforcement
- 7 Design
- 7.1 Overview
Foreword
GB/T 26978 "on-site assembly of vertical cylindrical flat steel LNG storage tank design and construction" is divided into the following five sections.
--- Part 1. General;
--- Part 2. metal member;
--- Part 3. Concrete components;
--- Part 4. heat insulating member;
--- Part 5. Testing, drying, replacement and cooling.
This section GB/T 26978-2011 Part 3.
This section drafted in accordance with GB/T 1.1-2009 given rules.
The partial modification using EN14620-3:2006 "on-site assembly of steel vertical cylindrical flat operating temperature is between 0 °C ~ -165 °C of Refrigerated liquefied gas storage tank design and construction - Part 3. Concrete components "(in English).
The main differences are as follows.
Retains the LNG-related content, delete and LPG, ethylene, ethane and similar hydrocarbons and liquid ammonia, liquid Oxygen, liquid nitrogen and liquid argon storage and other related content.
Added "Appendix NA (informative), which gives a list of the technical differences and the reasons for reference.
For ease of use, this section to legal units of measurement-based, non-statutory standard unit of measurement corresponding value in subsequent brackets.
This part of the Annex A, Annex B, Appendix NA informative appendices.
This part of the National Standardization Technical Committee on Petroleum and Natural Gas LNG Technical Committee (SAC/TC355/SC1) centralized.
This section is responsible for drafting unit. CNOOC Gas & Power Group Co., Ltd., China Petrochemical Corporation Zhongyuan Petroleum Exploration Bureau of Investigation and Design Institute Study hospital.
This section participated in the drafting unit. China National Petroleum Corporation Tangshan LNG project manager, China Chengda Engineering Company, China Petroleum Pipeline Engineering Co., Ltd., China Petroleum and Natural Gas and Pipeline Company.
1 Scope
This section of concrete LNG storage tank component materials, design, construction of the general requirements to make provision.
This section applies to on-site assembly of a vertical, cylindrical, flat, steel, liquefied natural gas operating temperature between 0 °C ~ -165 °C between Tank design and construction.
2 Normative references
The following documents for the application of this document is essential, dated references, only the dated version suitable for use herein Member. For cited documents without a date. The latest version (including any amendments) applies to this document.
GB/T 26978.1-2011 site assembly vertical cylindrical flat steel LNG storage tank design and construction - Part 1. General GB/T 26978.2-2011 site design and construction of a vertical cylinder assembly of flat steel LNG storage tank - Part 2. Metal member EN206-1 concrete - Part 1. technical requirements, performance, production and standards compliance (Concrete-Part 1.
Specification, performance, productionandconformity) EN1992-1-1:2004 European standard 2. design of concrete structures - Part 1-1. General and building regulations (Eurocode 2. designofconcretestructures-Part 1-1. GeneralrulesandrulesforBuildings) EN1992-1-2:2004 European standard 2. design of concrete structures - Part 1-2. General - Structural fire design --- (Eurocode 2. designofconcretestructures-Part 1-2. Generalrules-Structuralfiredesign)
3 Terms and Definitions
GB/T 26978.1-2011 established in the following terms and definitions apply to this document.
Low lowtemperature
The temperature of less than -20 °C.
4 Overview
For general reinforced concrete and/or material selection and design of prestressed concrete structures, performance standards EN1992-1-1.
5 Air tightness
To ensure that the outer tank (for example, full containment tank) air tightness, use a metal liner or a polymer coating.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 26978.1-2011 · GB/T 26978.2-2011
How to Download GB/T 26978.3-2011
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 26978.5-2011 — Design and manufacture of site built, vertical, cylindrical flat-bottomed steel tanks for the storage of liquefied nature gases -- Part 5: Testing, drying, purging and cool-down
GB/T 24293-2026 — Thermostatic faucet
GB/T 48132.9-2026 — Green mine construction specifications - Part 9: Cement limestone mine
Secure payment via Stripe
Payments accepted
GB/T 26978.3-2011
$854.00