Valid

GB/T 25217.14-2020Methods for test, monitoring and prevention of rock burst—Part 14: Prevention method of roof hydraulic fracturing (English PDF)

冲击地压测定、监测与防治方法 第14部分:顶板水压致裂防治方法

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 25217.14-2020 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 19, 2020

Implementation date

June 1, 2021

Scope

GB/T 25217.14-2020 is the English-translated version of 冲击地压测定、监测与防治方法 第14部分:顶板水压致裂防治方法.

GB/T 25217.14-2020 is the part of the Chinese series on the test, monitoring and prevention of rock burst that sets the prevention method of roof hydraulic fracturing.

It gives the terms and definitions, the instruments and equipment, the conditions for roof hydraulic fracturing, the direct and directional hydraulic fracturing methods, the inspection of the effect and the safety requirements.

It applies to the prevention and control of rock burst by hydraulic fracturing of the roof. Coal mines, mining engineers and mine safety authorities use it. Issued on 19 November 2020, it has applied since 1 June 2021.

Found what you need?

Document preview — GB/T 25217.14-2020

National Standard of the People's Republic of China

ICS
73.010
Classification
D 04

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

GB/T 25217 "Measurement, Monitoring and Prevention of Rock Burst Pressure" is divided into 14 parts.

---Part 1: The method of measuring the impact tendency of roof rock formation and index;

---Part 2: Classification of impact tendency of coal and measurement method of index;

---Part 3: The method of measuring the impact tendency and index of coal-rock composite specimens;

---Part 4: Microseismic monitoring method;

---Part 5: Ground sound monitoring method;

---Part 6: Drill cuttings monitoring method;

---Part 7: Mining stress monitoring method;

---Part 8: Electromagnetic radiation monitoring methods;

---Part 9: Coal seam water injection prevention methods;

---Part 10: Prevention and treatment methods for coal seam borehole pressure relief;

---Part 11: Coal seam unloading blasting prevention methods;

---Part 12: Prevention and control methods of mining protective layer;

---Part 13: Prevention methods of roof deep hole blasting;

---Part 14: Prevention and treatment methods of roof hydraulic fracturing.

This part is Part 14 of GB/T 25217.

This section was drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This part of GB/T 25217 specifies the terms and definitions, instruments and equipment, and roof water Fracturing conditions, direct hydraulic fracturing method, directional hydraulic fracturing method, effect inspection, safety requirements.

This part is applicable to the prevention and control method of hydraulic fracturing of rock burst roof.

2 Normative references

The following documents are essential for the application of this document. For dated reference documents, only the dated version applies to this document. For undated references, the latest version (including all amendments) applies to this document.

GB/T 23561.10-2010 Determination of physical and mechanical properties of coal and rock Part 10: Determination of tensile strength of coal and rock

GB/T 25217.1-2010 Methods for the determination, monitoring and prevention of rock bursts. Part 1: Classification and classification of rock bursts Index method

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Roof hydraulic fracturing

Inject high-pressure liquid into the roof rock layer to create new or expand original cracks in the roof rock layer to control roof fracture and energy release The anti-shock technology.

3.2 Direct hydraulic fracturing

Construct fracturing holes in the roof rock layer, and inject high-pressure liquid after sealing the holes to fracture the roof rock mass to achieve the prevention of roof fracture and energy release. Chong technology.

3.3 Directional hydraulic fracturing

Artificially cut a directional pre-fracture in the roof rock layer, and then inject high-pressure liquid to crack the rock mass along the directional pre-fracture to achieve control Anti-impact technology for roof fracture and energy release.

3.4 Directional pre-crack

The slit cut in the fracturing hole has a shape similar to that of a wedge.

3.5 Slotting tool

A drill tool capable of directional pre-slit cutting.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 25217.14-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 25217.14-2020

$175.00