Valid

GB/T 24565-2009Monitoring and testing for energy saving of tunnel kiln (English PDF)

隧道窑节能监测

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 24565-2009 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 30, 2009

Implementation date

May 1, 2010

Scope

GB/T 24565-2009 is the English-translated version of 隧道窑节能监测.

GB/T 24565-2009 is the Chinese standard "Monitoring and testing for energy saving of tunnel kiln". Its scope clause reads: This standard specifies the tunnel kiln energy monitoring program, monitoring methods and assessment indicators.

This standard applies to coal, gas, fuel type and open flame muffle type production of ceramic products, tiles and refractories industrial tunnel kiln. Its clauses include terms and definitions; tunnel kiln energy monitoring project; tunnel kiln energy monitoring method.

Found what you need?

Document preview — GB/T 24565-2009

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 tunnel kiln energy monitoring project
  • 5 tunnel kiln energy monitoring method

1 Scope

This standard specifies the tunnel kiln energy monitoring program, monitoring methods and assessment indicators.

This standard applies to coal, gas, fuel type and open flame muffle type production of ceramic products, tiles and refractories industrial tunnel kiln.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent

Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research

Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 4272 General technical equipment and pipeline insulation

3 Terms and Definitions

The following terms and definitions apply to this standard.

3.1

The difference between surface temperature and ambient temperature tunnel kiln body.

4 tunnel kiln energy monitoring project

Check item 4.1

4.1.1

The kiln should be tight, complete, equipment and pipe insulation should be consistent with GB/T 4272 regulations.

4.1.2

Metering fully equipped, reasonable, and in the test cycle.

4.1.3

Exhaust systems, flue, chimney set reasonable work properly.

4.2 Test Project

4.2.1

exhaust gas temperature.

4.2.2

air factor.

4.2.3 Exhaust gas combustible components

CO, H2, CH4.

4.2.4

kiln surface temperature.

4.2.5

coal-ash carbon content.

5 tunnel kiln energy monitoring method

5.1 Conditions and Monitoring time

Monitoring should be carried out in the tunnel kiln production normal, steady state thermal conditions. Monitoring time not less than 2h.

5.2 Monitoring Instruments

Monitoring equipment should be used in good condition, the measurement range and resolution should be adapted to measure the project, its accuracy should not be less than shown in Table 1

Seek and test cycle. Instrument accuracy not less than the value specified in Table 1 of the new instrument, applicable to this standard.

GB/T 24915-2020 | GB 24850-2020 | GB 24500-2020 | GB/T 24562-2009 | GB/T 24561-2009 | GB/T 24560-2009 | […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 24565-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 24565-2009

$125.00