GB/T 21562.2-2015Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 2: Guide to the application for safety (English PDF)

轨道交通 可靠性、可用性、可维修性和安全性规范及示例 第2部分:安全性的应用指南

Preview PDF

This is a limited preview

Buy now to download the full PDF (181 pages)

Need quotation for your management?

Get a formal quotation for GB/T 21562.2-2015 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 31, 2015

Implementation date

July 1, 2016

Scope

GB/T 21562.2-2015 is the English-translated version of 轨道交通 可靠性、可用性、可维修性和安全性规范及示例 第2部分:安全性的应用指南.

GB/T 21562.2-2015 is the Chinese standard "Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 2: Guide to the application for safety".

Its scope clause reads: 1.1 This part of GB/T 21562 gives guidance on the safety process requirements of railway application systems specified in GB/T 21562-2008 and on the specific issues involved in the safety activities at various stages of the system life cycle (see 1.3).

This part applies to all systems covered by the scope of GB/T 21562-2008.This part assumes that users are familiar with safety issues, but GB/T 21562-2008 lacks detailed guidance on certain safety issues.

1.2 GB/T 21562-2008 is the basic RAMS standard for the top level of the system. This part is a supplement to GB/T 21562-2008 and applies only to the safety issues stated in 1.3.

1.3 This part only gives guidance on the following issues within the scope of GB/T 21562-2008 structures of safety demonstration documentation (safety arguments).

1.4 Table 1 illustrates the scope and limitations of the safety activities at various stages of the life cycle as defined in GB/T 21562-2008, and defines the. Its clauses include terms, definitions and abbreviations; guidelines for risk acceptance principle.

It was issued by the General Administration of Quality Supervision, Inspection and Quarantine on DECEMBER 31, 2015 and took effect on JULY 01, 2016.

Found what you need?

Document preview — GB/T 21562.2-2015

National Standard of the People's Republic of China

ICS
45.060

Contents

  • Foreword5
  • Introduction6
  • 1 Scope7
  • 2 Normative references9
  • 3 Terms, definitions and abbreviations9
  • 4 Guidelines for the concept of related organizations / entities and systems hierarchy and safety20
  • 5 General risk models and common functional hazard checklists for typical railway application systems28
  • 6 Application guidelines for functional safety, functional safety requirements, SI objectives, risk apportionment, and SIL49
  • 7 Safety proof guide combined with probabilistic and deterministic methods73
  • 8 Guidelines for risk acceptance principle88
  • 9 Basic element guide related to safety proof documents (safety arguments)95
  • Appendix A (Informative) Steps of risk assessment process112
  • Appendix B (Informative) Hazard checklist at the railway application system level127
  • Appendix C (Informative) Risk category classification method137
  • Appendix D (Informative) British railway system risk model diagram142
  • Appendix E (Informative) Technology and methods148
  • Appendix F (Informative) Graphical representation of availability concepts164
  • Appendix G (Informative) Example of establishing risk acceptance criteria166
  • Appendix H (Informative) Example of safety argument overview172
  • References181

1 Scope

1.1 This part of GB/T 21562 gives guidance on the safety process requirements of railway application systems specified in GB/T 21562-2008 and on the specific issues involved in the safety activities at various stages of the system life cycle (see 1.3).

This part applies to all systems covered by the scope of GB/T 21562-2008.This part assumes that users are familiar with safety issues, but GB/T 21562-2008 lacks detailed guidance on certain safety issues.

1.2 GB/T 21562-2008 is the basic RAMS standard for the top level of the system.

This part is a supplement to GB/T 21562-2008 and applies only to the safety issues stated in 1.3.

1.3 This part only gives guidance on the following issues within the scope of GB/T 21562-2008. structures of safety demonstration documentation (safety arguments).

1.4 Table 1 illustrates the scope and limitations of the safety activities at various stages of the life cycle as defined in GB/T 21562-2008, and defines the roles/responsibilities of key players. It should combine all the contents of this part for the in-depth understanding of Table 1.

2 Normative references

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this standard.

GB/T 20438.4-2006 Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 4: Definitions and abbreviations (IEC 61508-4:1998, IDT)

GB/T 21562-2008 Railway applications - Specification and demonstration of Reliability, Availability Maintainability and Safety (RAMS) (IEC 62278:2002, IDT)

GB/T 28808-2012 Railway applications - Communication, signaling and processing systems - Software for railway control and protection systems (IEC 62279:2002, IDT)

3 Terms, definitions and abbreviations

The following terms, definitions and abbreviations apply to this document.

3.1 Explanation of terms and definitions used in GB/T 21562-

Note: The following clauses give further explanation to the definition of GB/T 21562-2008, and the term clause number corresponding to GB/T 21562-2008 is given in brackets.

3.1.3 Failure rate

Limit, if this exists, of the ratio of the conditional probability that the instant of time, T, of a failure of a product falls within a given time interval (t, t + delta t) and the length of this interval, delta t, when delta t tends towards zero, given that the item is in an up state at the start of the time interval.

3.1.7 Railway authority

The organization that has full responsibility for the managers of the operating track system.

3.1.8 Risk

Probable rate of occurrence of a hazard causing harm and the degree of severity of the harm.

4 Guidelines for the concept of related organizations / entities and systems hierarchy and safety

4.1 Overview

Considering the interaction of the system and its environment, GB/T 21562-2008 defines safety as "avoiding unacceptable risk of harm". This definition covers all aspects of safety, including functional and technical safety, health and safety issues, and human factors.

4.2 Related organizations/entities in the system

Depending on the social/policy environment and organizational/management structure associated with the railway application system, there may be several organizations/entities performing different functions in each phase of the system life cycle.

4.3 Concepts of system level

4.3.1 Basic concepts

The basic concepts of nesting systems and hierarchies are shown in Figure 1.

4.3.2 Railway application system environment and system level

Railway application systems usually operate in a socio-economic/policy environment.

4.4 Safety concept

4.4.1 Hazards
4.4.2 Risk
4.4.2.1 Overview

Risk (as defined in 3.1.8) is related to the occurrence and severity of damage. The damage may be.

4.4.2.3 Environmental damage

Environmental damage refers to the damage to related property, the proliferation of toxic substances or other harmful agents in the environment, and fire, etc.

4.4.2.4 Commercial damage

Commercial damage refers to damage to property/assets of stakeholders, damage to operating reputation, or loss of customers. It is a commercial problem.

4.4.3 Risk normalization

5 General risk models and common functional hazard checklists for typical railway application systems

5.1 Overview

This clause introduces the concept of a general risk model, gives guidance on the risk assessment process and application, and gives a hazard checklist.

5.2 General risk model

Modeling is primarily a simplification and generalization of reality, in order to understand causality and highlight important factors. Modeling is an effective tool for estimating and forecasting the future.

5.3 Risk assessment process

5.3.1 Overview

Risk assessment mainly includes hazard identification, risk assessment and risk tolerance judgment. Risk management includes identifying and implementing economic and practical risk control measures, and ensuring that resources are continuously used to control and maintain risks at an acceptable level.

5.3.2 General procedures
5.3.2.1 Overview

The general procedure is divided into two major steps.

5.3.2.4 Hazard records

Hazard records are a tool for recording the hazards identified and the actions taken or actions to be taken. These measures and actions reduce the hazard to permissible levels.

5.4.6 Sensitivity analysis

When performing risk analysis and subsequent analysis of tolerance, assumptions shall generally be made; due to the lack of data, the quantification of hazard frequency/probability and accident consequences can only be given through judgment, so the methods of assumption and judgment are to a large extent determine the overall risk and tolerance assessment results. Sensitivity analysis can be used to manage the impact of these assumptions and judgments.

5.4.7 Risk assessment at each stage of the fife cycle
5.4.7.1 Overview

As described in GB/T 21562-2008, risk assessment shall be repeated at various stages of the life cycle (see the last paragraph of A.2.4). The following clauses describe the application of the risk assessment process at different stages of design, maintenance and operation.

5.5 General function hazard checklist

5.5.1 Overview

Historically, safety has been improved by drawing lessons from painful accidents. Now it takes a more active and systematic approach to study causes of hazards and expand the scope of consideration. Hazard identification is a key step in the overall safety assurance process. Although multiple technologies are used in separate projects, the general system/industry-level approach is not yet complete.

6 Application guidelines for functional safety, functional safety requirements, SI objectives, risk apportionment, and SIL

6.1 Overview

When hazard identification, hazard analysis, and risk assessment (see 5.3 and 5.4) are completed, safety requirements shall be determined based on the results of these efforts. The determination of safety requirements is a repeated activity that reflects the repeated nature of risk assessment. It is therefore normal for overlap and repetition of the description of activities in different clauses of the part.

6.2.1 System features

All necessary system functions (basic requirements) shall be determined based on the goals of the created system and the system requirements. System design may also generate additional requirements, to ensure complete system functionality.

6.2.3 Safety-related functions and technical features and overall system safety

At the railway application system level, the basic functions (created based on the system's goals and system requirements) usually include (for example only used for passenger operations).

6.3.2 Apportionment method of safety objectives

Prior to assigning safety goals, the overall system shall be defined with effective overall safety objectives.

6.4.4 Controlling random failures and systematic faults to achieve SI
6.4.4.1 Overview

SI is the expression of the failure rate and corresponding qualitative measures required to achieve THR (i.e., the accident tolerability frequency). To achieve this goal, all hazards associated with the system or subsystem shall be controlled.

6.5 Fault-safety system guideline

6.5.1 Fault-safety concept

7 Safety proof guide combined with probabilistic and deterministic methods

7.1 Overview

The safety of railway application systems is usually ensured through the application of appropriate processes, procedures, tools, rules and methods throughout the life cycle of products, processes, systems and operations, but due to the complexity and novelty of many modern systems and tasks, these methods are difficult to give a better certainty.

7.2 Safety argument

7.2.1 Overview

The procedure given in GB/T 21562-2008 covers the RAMS activities required to build the system.

7.2.2 Guidance on detailed safety certification methods

The safety certification of the system shall not be confined to certain nodes of the system life cycle, but cover the entire life cycle of the system (whether or not the system-related risks are acceptable) and influence the final decision (usually at the system acceptance stage 10 of the life cycle of GB/T 21562-2008).

7.5 Combining deterministic and probabilistic methods

A deterministic method can be used to analyze the system from top to bottom, after reaching a certain level, use probabilistic methods to deeply analyze some components.

8 Guidelines for risk acceptance principle

8.1 Overview

Although there may be more acceptance principles, this clause only gives further guidance on the principles of risk acceptance given in clause 4.6.3.3 of GB/T 21562-2008.

8.2 Application of risk acceptance principle

The method of proof of acceptable risk level shall be in accordance with national laws, and the risk acceptance level can be set based on the principle of risk acceptance;

8.3 ALARP principle

8.3.1 Definition of ALARP

ALARP is one of the principles of risk assessment. ALARP divides the risk area in accordance with the acceptance criteria boundary and determines the following three areas.

8.3.2 Calculation of frequency and consequences

Assuming that the acceptance criteria have been defined, the next step is to perform hazard tree analysis (FTA), which is identified during the preliminary hazard identification and analysis (PHIA) process.

8.4 GAMAB (GAME) principle

8.4.1 Overview

This clause gives the application guide for GAMAB as described in D.2 of GB/T 21562-2008.GAMAB originated from the pioneering risk acceptance principle in France,

8.4.2 Basic principles

The following prerequisites shall be satisfied.

8.5 MEM (minimum endogenous mortality) safety principle

(see D.3 in GB/T 21562-2008)

9 Basic element guide related to safety proof documents (safety arguments)

9.1 Overview

The safety arguments are referenced in the relevant tasks of the project stage of Figure 9 of GB/T 21562-2008. For further explanation of safety arguments, see clauses 6.6 and 6.9 of GB/T 21562-2008. This clause further explains the different types of safety arguments and their contents.

9.2 Use of safety arguments

Safety certification is widely used, and the most important thing is to prove the safety of the system. Usually SRA shall also be approved in accordance with safety arguments.

9.3 Scope of safety arguments

The scope of safety arguments shall be determined by defining the system, the system's safety functions, the system integrity and processes required to implement these functions; if feasible, it should also determine the project stages and the deliverables of these stages of GB/T 21562-2008.

9.4 Levels of safety argument

9.6 Safety argument structure

GB/T 28809-2012 describes the general structure of safety arguments. The advantage of this structure is that it is compatible with various technologies and can provide a unified framework for any safety argument. […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 181 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 21562.2-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation.

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
181 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 21562.2-2015

$475.00