Valid

GB/T 21412.15-2017Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 15: Subsea structures and manifolds (English PDF)

石油天然气工业 水下生产系统的设计和操作 第15部分:水下结构物及管汇

Preview PDF

This is a limited preview

Buy now to download the full PDF (47 pages)

Need quotation for your management?

Get a formal quotation for GB/T 21412.15-2017 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Level / Type

National · Recommended

Issue date

October 14, 2017

Implementation date

May 1, 2018

Scope

GB/T 21412.15-2017 is the English-translated version of 石油天然气工业 水下生产系统的设计和操作 第15部分:水下结构物及管汇.

GB/T 21412.15-2017 — GB/T 21412 of this part of the recognized and widely accepted within the framework of industrial norms and standards, put forward the underwater structure and manifold push Recommended practice.

Therefore, it does not replace or exclude any requirement of other industry regulations. This section applies to underwater oil and gas production and underwater injection pressure control of underwater manifolds and base plate.

See examples of underwater production systems figure 1.

This section covers the following equipment. a) Underwater production system structural components and piping systems. --- Production and injection manifold; --- Modular and integrated single satellite wells and multi-well base plate; --- Underwater treatment and underwater booster station; --- Oil (gas) riser base and the outer riser base (FRB, ERB); --- Pipeline terminal manifold (PLEM); --- Pipeline terminal (PLET); --- T-type and Y-type connection; --- Underwater isolation valve structure (SSIV). b) underwater production system components. --- Underwater control and distribution structure; --- Other underwater structures. c) Protective structures associated with the above equipment.

The following parts and their applications are beyond the scope of this section. --- Pipe and manifold valves; --- pipes and connectors; --- Grease mouth; --- Production control system.

General information related to the above may be obtained from other specifications such as 13628-1 and APISpec2C.

Found what you need?

Document preview — GB/T 21412.15-2017

National Standard of the People's Republic of China

ICS
75.180.10
Classification
E 94

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Contents

  • Foreword V.
  • 1 Scope
  • 2 Normative references
  • 3 Terms, definitions and abbreviations
  • 3.1 Terms and definitions
  • 3.2 Abbreviations
  • 4 Manifold and base functional considerations
  • 4.1 Overview
  • 4.2 System Requirements
  • 4.3 System Interface
  • 4.4 Cluster well manifold requirements
  • 4.5 Base system requirements
  • 5 Design considerations
  • 5.1 System Design
  • 5.2 Load
  • 5.3 Piping Design
  • 5.4 Structure Design
  • 5.5 Basic Design
  • 5.6 Parts
  • 6 Design Verification and Verification
  • 6.1 Design Verification
  • 6.2 Design Verification
  • 6.3 Other comments
  • 7 Piping system materials and construction requirements
  • 7.1 Overview
  • 7.2 Piping and piping fittings
  • 7.3 Forgings
  • 7.4 Chemical Composition and Weldability
  • 7.5 Base metal sampling
  • 7.6 Base metal mechanical and corrosion testing
  • 7.7 Parts NDT
  • 7.8 Fastener Material
  • 7.9 Elbow and forming operation
  • 7.10 Parts welding transition layer and surfacing
  • 7.11 Piping System Welding and Nondestructive Testing
  • Construction and Manufacturing Considerations
  • 8.1 External corrosion protection
  • 8.2 Color
  • 8.3 Material Traceability

Foreword

GB/T 21412 "Design and operation of oil and gas industry underwater production system" is divided into 15 parts.

--- Part 1. General requirements and recommended practices;

--- Part 2. Non-bonded flexible pipe systems for the seabed and the sea;

--- Part 3. Out of the pipeline (TFL) system;

--- Part 4. Underwater wellhead equipment and Christmas tree equipment;

--- Part 5. Underwater umbilical;

--- Part 6. Underwater production control system;

--- Part 7. Completion/workover riser systems;

--- Part 8. Underwater vehicle (ROV) interface for subsea production systems;

--- Part 9. Remote operation tool (ROT) maintenance system;

--- Part 10. Cohesive flexible pipe specifications;

--- Part 11. Flexible pipe systems for the seabed and the sea;

--- Part 12. Dynamic production of legislation;

--- Part 13. Underwater production system remote operation tools and interfaces;

--- Part 14. Underwater high integrity pressure protection system;

--- Part 15. Underwater structures and manifold.

This section GB/T 21412 Part 15.

This section drafted in accordance with GB/T 1.1-2009 given rules.

This section uses the translation method identical with ISO 13628-15:2011 "design and operation of oil and gas industry underwater production system Part 15. Underwater structures and manifolds. " the documents of our country that are consistent with the corresponding international documents that are normative references in this section are as follows.

--- GB/T 12467.2-2009 Welding quality of metallic materials - Part 2. Complete quality requirements (ISO 3834-2:2005, IDT);

--- GB/T 19867 (all parts) welding procedure [ISO 15609 (all parts), IDT];

Oil and Gas Industry Drilling and Production Wellhead Equipment and Christmas Trees (ISO 10423).

2009, MOD);

--- GB/T 21412.1-2010 Design and operation of subsea production system for oil and gas industry - Part 1. General requirements and recommended practices (ISO 13628-1:2005, IDT);

--- GB/T 21412.8-2010 Design and operation of subsea production systems for oil and gas industry - Part 8. Underwater production System of underwater vehicle (ROV) interface (ISO 13628-8:2002, IDT).

This part of the National Oil and Gas Standardization Technical Committee (SAC/TC355) proposed and managed.

This part of the drafting unit. CNOOC Research Institute.

Drafters of this section. Guo Hong, Yan Jia Yu, Zheng Lijun, Xu Wenhu.

Oil and gas industry Underwater production system design and operation Part 15. Underwater structures and manifolds

1 Scope

GB/T 21412 of this part of the recognized and widely accepted within the framework of industrial norms and standards, put forward the underwater structure and manifold push Recommended practice. Therefore, it does not replace or exclude any requirement of other industry regulations.

This section applies to underwater oil and gas production and underwater injection pressure control of underwater manifolds and base plate. See examples of underwater production systems figure 1.

This section covers the following equipment.

a) Underwater production system structural components and piping systems.

--- Production and injection manifold;

--- Modular and integrated single satellite wells and multi-well base plate;

--- Underwater treatment and underwater booster station;

--- Oil (gas) riser base and the outer riser base (FRB, ERB);

--- Pipeline terminal manifold (PLEM);

--- Pipeline terminal (PLET);

--- T-type and Y-type connection;

--- Underwater isolation valve structure (SSIV).

b) underwater production system components.

--- Underwater control and distribution structure;

--- Other underwater structures.

c) Protective structures associated with the above equipment.

The following parts and their applications are beyond the scope of this section.

--- Pipe and manifold valves;

--- pipes and connectors;

--- Grease mouth;

--- Production control system.

General information related to the above may be obtained from other specifications such as 13628-1 and APISpec2C.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 47 pages — is available in the English PDF.

How to Download GB/T 21412.15-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
47 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 21412.15-2017

$590.00