Valid

GB/T 20674.3-2020Plastics pipes and fittings. Equipment for fusion jointing polyethylene systems -- Part 3: Operator""s badge (English PDF)

Also coversGBT20674.3-2020

Open the GB/T 20674.3-2020 preview as PDF

Preview — first pages of GB/T 20674.3-2020

This is a limited preview

Buy now to download the full PDF

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

November 19, 2020

Implementation date

June 1, 2021

Scope

GB/T 20674.3-2020 (Plastics pipes and fittings. Equipment for fusion jointing polyethylene systems -- Part 3: Operator""s badge) is available as an English-translated PDF.

GB/T 20674.3-2020 — This part of GB/T 20674 specifies the terms and definitions, data carriers, and data codes of the operator code of the polyethylene (PE) piping system welding equipment. This part, together with other parts of GB/T 20674, applies to gas/water supply polyethylene piping system welding equipment and operators. Note. Welding equipment is used for prefabricated connection of gas/water supply components (such as valves, steel-plastic conversion, etc.) or for nuclear power pipes, PE-RT pipes for cold and hot water, When connecting industrial pipes, composite pipes, etc., the supply and demand parties shall negotiate and agree.

Document preview — GB/T 20674.3-2020

National Standard of the People's Republic of China

ICS
83.140.30
Classification
G 33

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

GB/T 20674 "Plastic pipes and pipe fittings polyethylene system welding equipment" is divided into 4 parts.

---Part 1.Hot Fusion Butt;

---Part 2.Electrofusion connection;

---Part 3.Operator code;

---Part 4.Traceable coding.

This part is Part 3 of GB/T 20674.

This section was drafted in accordance with the rules given in GB/T 1.1-2009.

This part uses the redrafting law to amend and adopt ISO 12176-3.2011 "Plastic pipes and pipe fittings polyethylene system welding equipment No.

Part 3.Operator Code.

Compared with ISO 12176-3.2011, this part has many structural adjustments. Appendix A lists this part and ISO 12176-3.

The.2011 chapter number comparison list.

Compared with ISO 12176-3.2011, there are technical differences in this part. The clauses involved in these differences have been passed on the outer margins.

The vertical single line (|) of the position is marked, and a list of the corresponding technical differences and their reasons is given in Appendix B.

Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.

This part was proposed by the China National Light Industry Council.

This part is under the jurisdiction of the National Plastic Products Standardization Technical Committee (SAC/TC48).

Drafting organizations of this section. Chinaust Plastic Products Co., Ltd., Shandong Shengbang Plastic Co., Ltd., Xi'an Sulong Welding Equipment Co., Ltd., Luo

Senborg (Wuxi) Pipeline Technology Co., Ltd., Nansu Building Materials & Plastic Products (Shenzhen) Co., Ltd., Guangzhou Special Pressure Equipment Testing and Research Institute.

1 Scope

This part of GB/T 20674 specifies the terms and definitions, data carriers, and data codes of the operator code of the polyethylene (PE) piping system welding equipment.

This part, together with other parts of GB/T 20674, applies to gas/water supply polyethylene piping system welding equipment and operators.

Note. Welding equipment is used for prefabricated connection of gas/water supply components (such as valves, steel-plastic conversion, etc.) or for nuclear power pipes, PE-RT pipes for cold and hot water,

When connecting industrial pipes, composite pipes, etc., the supply and demand parties shall negotiate and agree.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article

Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 19278-2018 General terms and definitions for thermoplastic pipes, fittings and valves

GB/T 20674.1 Polyethylene system fusion splicing equipment for plastic pipes and fittings-Part 1.Thermal fusion butt joint

GB/T 20674.2 Polyethylene system welding equipment for plastic pipes and fittings-Part 2.Electrofusion connection

ISO 3166-1 Country and Region Name Code Part 1.Country Code

ISO /IEC 16390 Information Technology Automatic Identification and Data Capture Technology Cross Two-Five Code Bar Code Symbol Specification

3 Terms and definitions

The following terms and definitions defined in GB/T 19278-2018 apply to this document.

3.1

Welding operator

Qualified personnel trained in the welding skills of polyethylene pipes and/or pipe fittings.

Note. Welding operators can participate in one or more welding skills training, including. semi-automatic and/or fully automatic welding equipment.

3.2

Authorized organization

Organizations that organize welding operator training and grant operator codes, usually pipeline operation and maintenance organizations or related organizations.

3.3

digital

All natural numbers from 0 to 9.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 20674.3-2020

  1. 1Add to cart. Click the "Buy GB/T 20674.3-2020" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 20674.3-2020

$155.00

$130.00for partners