Valid

GB/T 17502-2009Specifications for submarine cable and pipeline route investigation (English PDF)

海底电缆管道路由勘察规范

Open the GB/T 17502-2009 preview as PDF

Preview — first pages of GB/T 17502-2009 (full document: 21 pages)

This is a limited preview

Buy now to download the full PDF (21 pages)

Issued by

General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC

Level / Type

National · Recommended

Issue date

October 30, 2009

Implementation date

April 1, 2010

Scope

GB/T 17502-2009 is the English-translated version of 海底电缆管道路由勘察规范.

China's national specification for surveying the route a submarine cable or pipeline will follow. It specifies the content, the methods and the technical requirements of submarine cable and pipeline route investigation, and the preparation of the results report and the archiving of the data. It applies to the siting and investigation of submarine cable and submarine pipeline projects, and may be referred to for other linear seabed works and shallow foundation structures. A submarine cable or pipeline is laid once and is almost impossible to inspect, repair or reroute afterwards at anything other than extraordinary cost. Everything that will threaten it over its life is decided before it is laid, by the route: rock outcrop that prevents burial, mobile sand waves that will expose a buried line as they migrate, soft mud that will not support it, slopes that can fail, active faults, gas-charged sediment, boulder fields, existing cables and pipelines to be crossed, wrecks and unexploded ordnance, fishing grounds where trawl gear will reach the bottom, and anchorages. The survey has to find all of it in a corridor along a route hundreds of kilometres long. The specification sets out the sequence: route preselection on existing data, then the landfall section which is investigated separately because the shallow zone is the most dynamic and the most congested part of the whole route, then positioning and navigation to the accuracy the results demand, then geophysical survey - bathymetry, side-scan, sub-bottom profiling and magnetometry - followed by seabed sampling, geological drilling, in situ testing and laboratory soil testing where the geophysics indicates a problem. It then covers the measurement of corrosive environmental parameters, seismic safety evaluation, the collection and observation of marine hydrometeorological data, and post-lay survey of the installed cable or pipeline. Issued on 30 October 2009 and in force since 1 April 2010, it replaces GB 17502-1998.

Document preview — GB/T 17502-2009

National Standard of the People's Republic of China

ICS
07.060
Classification
A 45
Replacing
GB 17502-1998

Issued by: General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 7 Navigation
  • 11 Situ test 11 12 12 ships and 13 laboratory soil test 13 corrosive environmental parameters measured 14 14 seismic safety evaluation
  • 16 After 16 submarine cables and pipeline survey

1 Scope

China's national specification for surveying the route a submarine cable or pipeline will follow. It specifies the content, the methods and the technical requirements of submarine cable and pipeline route investigation, and the preparation of the results report and the archiving of the data. It applies to the siting and investigation of submarine cable and submarine pipeline projects, and may be referred to for other linear seabed works and shallow foundation structures. A submarine cable or pipeline is laid once and is almost impossible to inspect, repair or reroute afterwards at anything other than extraordinary cost. Everything that will threaten it over its life is decided before it is laid, by the route: rock outcrop that prevents burial, mobile sand waves that will expose a buried line as they migrate, soft mud that will not support it, slopes that can fail, active faults, gas-charged sediment, boulder fields, existing cables and pipelines to be crossed, wrecks and unexploded ordnance, fishing grounds where trawl gear will reach the bottom, and anchorages. The survey has to find all of it in a corridor along a route hundreds of kilometres long. The specification sets out the sequence: route preselection on existing data, then the landfall section which is investigated separately because the shallow zone is the most dynamic and the most congested part of the whole route, then positioning and navigation to the accuracy the results demand, then geophysical survey - bathymetry, side-scan, sub-bottom profiling and magnetometry - followed by seabed sampling, geological drilling, in situ testing and laboratory soil testing where the geophysics indicates a problem. It then covers the measurement of corrosive environmental parameters, seismic safety evaluation, the collection and observation of marine hydrometeorological data, and post-lay survey of the installed cable or pipeline. Issued on 30 October 2009 and in force since 1 April 2010, it replaces GB 17502-1998.

This standard specifies the contents of the submarine cable and pipeline route investigation, methods and technical requirements, results report preparation and data archiving. This standard applies to submarine cable project, submarine pipeline project siting and investigation, other linear seabed, shallow foundation structures and siting Investigation may refer.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB 12327-1998 Hydrographic Specification

GB/T 12763.2-2007 oceanographic survey - Part 2. Marine hydrographic observations

GB/T 12763.3-2007 oceanographic survey - Part 3. Marine meteorological observations

GB/T 12763.6-2007 oceanographic survey - Part 6. Marine Biological Survey

GB/T 17424-1998 Differential Global Positioning System (DGPS) technology requirements

GB 17501-1998 marine engineering topographic surveying Specification

GB 17741-2005 project site seismic safety evaluation

GB 50011-2001 Seismic Design of Buildings

GB 50021-2001 investigation of geotechnical engineering

GB/T 50123-1999 standard soil test method

GB/T 50269-1997 Foundation Dynamic Properties Test Specification ASTMD2487-2006 soil engineering classification criteria (Unified Soil Classification System) ASTMD5778-1995 soil type and pore pressure measuring probe penetration test standard

3 Terms and Definitions

The following terms and definitions apply to this standard.

3.1 Including submarine cables and submarine pipelines. Submarine cable is laid on the sea bottom for cable refers to communications, power transmission, including undersea cables, Submarine transmission cables, etc; refers submarine pipeline laying in the sea for water, gas, oil or other substances transported tubular facilities.

3.2 Submarine cable and pipeline landing point near the water depth is less than 5m route corridors.

Note. usually extends from shore to land at 100m to the sea to a depth of 5m at.

3.3 Shoreline to a depth of 20m sea routes.

3.4 Depth 20m ~ 1000m sea routes.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 17502

EditionTitleRevisionStatus
GB/T 17502-2009Specifications for submarine cable and pipeline route investigationfirst revisionCurrent
GB 17502-1998Specifications for submarine cable and pipeline route investigationfirst issueSuperseded

This page sells the current edition, GB/T 17502-2009. Earlier editions are listed for reference only.

How to Buy GB/T 17502-2009

  1. 1Add to cart. Click the "Buy GB/T 17502-2009" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 17502-2009

$410.00

$350.00for partners