Valid

GB/T 17485-1998Hydraulic fluid power. Pumps, motors and integral transmissions. Parameter definitions and letter symbols (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (11 pages)

Need quotation for your management?

Get a formal quotation for GB/T 17485-1998 in 30 minutes.

Issued by

State Quality and Technical Supervision

Level / Type

National · Recommended

Issue date

September 2, 1998

Implementation date

August 1, 1999

Scope

GB/T 17485-1998 (Hydraulic fluid power. Pumps, motors and integral transmissions. Parameter definitions and letter symbols) is available as an English-translated PDF.

GB/T 17485-1998 — This standard applies to all types of hydraulic pumps, motors and integral transmissions.

Found what you need?

Document preview — GB/T 17485-1998

National Standard of the People's Republic of China

ICS
23.100.30
Classification
J 20

Issued by: State Quality and Technical Supervision

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This standard applies to all types of hydraulic pumps, motors and integral transmissions.

Document data

International classification (ICS): 23.100.30.

Chinese classification (CCS): J20.

Estimated length of the Chinese original: 17,192 words.

Adopted international standard: ISO 4391-1983, IDT.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 17485-1998

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
11 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 17485-1998

$225.00