GA/T 651-2006General procedures and requirements for the construction of public security traffic command system (English PDF)
This is a limited preview
Buy now to download the full PDF (12 pages)
Need quotation for your management?
Get a formal quotation for GA/T 651-2006 in 30 minutes.
Issued by
Ministry of Public Security
Level / Type
National · Recommended
Issue date
January 1, 1970
Implementation date
January 1, 1970
Scope
GA/T 651-2006 (General procedures and requirements for the construction of public security traffic command system) is available as an English-translated PDF.
GA/T 651-2006 — This document specifies the basic requirements for the construction of the public security traffic command system project and the preparation for project approval, construction preparation, project implementation, project acceptance, General procedures and requirements for operational evaluation and other stages.
This document is applicable to the construction of the public security traffic command system.
Found what you need?
Document preview — GA/T 651-2006
National Standard of the People's Republic of China
- ICS
- 93.080.99
- Classification
- P 51
Issued by: Ministry of Public Security
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Basic rules
- 5 Project preparation stage
- 6 Construction preparation stage
- 7 Project implementation stage
- 8 Project acceptance stage
- 9 Operational evaluation stage
- Appendix A (Informative) General Procedure Flow Chart of Public Security Traffic Command System Engineering Construction
- Appendix B (Informative) Trial Operation Record of Public Security Traffic Command System
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
This document replaces GA/T 651-2014 "General Procedures and Requirements for the Construction of Public Security Traffic Command System Engineering", and is consistent with GA/T 651-2014 in comparison, the main technical changes except for editorial changes are as follows.
a) The scope content has been changed (see Chapter 1, Chapter 1 of the 2014 edition);
b) The definition of project management unit has been changed (see 3.2, 3.2 in the 2014 edition);
c) The requirements for the project contracting mode have been added (see 4.2);
d) The requirements of the main stakeholders of the project have been added (see 4.3);
e) The requirements for stage division have been added (see 4.4);
f) The requirements for project establishment are changed (see 5.1, Chapter 5 of the 2014 edition);
g) The requirements of the feasibility study have been changed (see 5.2, 5.2 in the 2014 edition);
h) Deleted the requirements for approval of the project (see 5.3 of the 2014 edition);
i) The requirements of the commissioned design unit for the preliminary design have been changed (see 6.1.1.1, 6.1 of the 2014 edition);
j) The requirements for investigation and survey have been changed (see 6.1.1.3, 6.3 of the 2014 edition);
k) The requirements for review of preliminary design documents have been changed (see 6.1.1.4, 6.4.2 of the 2014 edition);
l) Added the requirement for preliminary design documents to be submitted to the competent authority for approval (see 6.1.1.5);
m) The requirements for preliminary design documents have been changed (see 6.1.2, 6.4.1 of the 2014 edition);
n) The requirements of the commissioned design unit for construction drawing design have been added (see 6.2.1.1);
o) The requirements for design review of construction drawings have been deleted (see 6.5.2 of the 2014 edition);
p) Added requirements for review of construction drawings and design documents (see 6.2.1.2);
q) Added the requirement for construction drawing design documents to be reported to the competent authority for record (see 6.2.1.3);
r) The requirements for construction drawings and design documents have been changed (see 6.2.2, 10 in the 2014 edition);
s) The requirements for determining supervision have been changed (see 6.3, 6.5.1 of the 2014 edition);
t) The requirements for engineering procurement have been changed (see 6.4, Chapter 7 of the 2014 edition);
u) The requirements for project bidding have been added (see 6.4.1.1);
v) Added the requirement for project procurement to be reported to the competent department for record (see 6.4.1.3);
w) The requirements for the award of engineering contracts have been changed (see Chapter 6.5, Chapter 8 of the 2014 edition);
x) Added the requirement for the project contract to be reported to the competent authority for record (see 6.5.2);
y) Added requirements for construction organization design (see 7.1);
z) The requirements for design clarification have been added (see 7.2);
aa) The requirements for detailed design have been added (see 7.3);
bb) The construction requirements are changed (see 7.4, Chapter 9 of the 2014 edition);
cc) The requirements for preliminary acceptance have been changed (see 8.1, 11.2 of the 2014 edition);
dd) The requirements for trial operation have been changed (see 8.2, 11.3 of the 2014 edition);
ee) Deleted the requirements for engineering evaluation (see 12.4 of the 2014 edition);
ff) The requirements for acceptance documents have been changed (see 8.3.2.3, 12.5.3 of the 2014 edition);
gg) The system requirements have been changed (see 8.4.2, 13.2 in the 2014 edition);
hh) The requirements of the operational evaluation stage have been added (see Chapter 9);
i) The general procedure flowchart for the construction of the public security traffic command system project has been added (see Appendix A);
j) Modified the trial operation record of the public security traffic command system (see Appendix B, see Appendix A of the 2014 edition).
1 Scope
This document specifies the basic requirements for the construction of the public security traffic command system project and the preparation for project approval, construction preparation, project implementation, project acceptance, General procedures and requirements for operational evaluation and other stages.
This document is applicable to the construction of the public security traffic command system.
2 Normative references
The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 19668 (all parts) Information Technology Service Supervision GB/T 50319 Construction Project Supervision Code GB/T 50326 Construction Project Management Code GA/T 515.2 Public Security Traffic Command System Design Specification Part 2: Provincial (Autonomous Region) Public Security Traffic Command System GA/T 515.3 Design Specification for Public Security Traffic Command System Part 3: Urban Public Security Traffic Command System GA/T 515.4 Design Specification for Public Security Traffic Command System Part 4: Drawing
3 Terms and definitions
The following terms and definitions apply to this document.
Constructionofpublicsecuritytrafficcommandsystem A construction project for the construction of the provincial (autonomous region) public security traffic command system or the urban public security traffic command system and its subsystems.
Project management unit in the public security traffic command system project preparation, construction preparation, project implementation, project acceptance, operation evaluation and other stages, responsible for planning, A unit that organizes, directs, coordinates, controls, and evaluates management work.
Note. It can be the construction unit itself or other units entrusted by the construction unit to be responsible for planning, organization, command, coordination, control, and evaluation.
4 Basic regulations
4.1 Project Management
The project management unit of the public security traffic command system project (hereinafter referred to as the project) should establish a project management organization in accordance with GB/T 50326 be responsible for project management.
4.2 Project contracting mode
According to the characteristics of the project's construction period, construction scale, construction content, technical difficulty, etc., design-tender-construction (DBB mode),
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.
Referenced standards
How to Download GA/T 651-2006
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 19668.1-2014 — Information technology service—Surveillance—Part 1: General rules
GB/T 19668.2-2017 — Information technology service—Surveillance—Part 2: Infrastructure project surveillance specification
GB/T 19668.3-2017 — Information technology service—Surveillance—Part 3: Operations and maintenance surveillance specification
Secure payment via Stripe
Payments accepted
GA/T 651-2006
$394.00