Valid

GA/T 1049.2-2024Communication protocol for integrated traffic command platform for public security - Part 2: Traffic signal control system (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (91 pages)

Need quotation for your management?

Get a formal quotation for GA/T 1049.2-2024 in 30 minutes.

Issued by

Ministry of Public Security

Level / Type

National · Recommended

Issue date

September 13, 2024

Implementation date

January 1, 2025

Scope

GA/T 1049.2-2024 (Communication protocol for integrated traffic command platform for public security - Part 2: Traffic signal control system) is available as an English-translated PDF.

GA/T 1049.2-2024 — This document specifies the communication protocol between the public security traffic integrated command platform and the information layer of the traffic signal control system.

This document is applicable to the design and development of public security traffic integrated command platform and traffic signal control system software.

Found what you need?

Document preview — GA/T 1049.2-2024

National Standard of the People's Republic of China

ICS
93.080.79
Classification
Q 87
Replacing
GA/T 1049.2-2013

Issued by: Ministry of Public Security

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 General technical requirements
  • 4.1 General requirements
  • 4.2 Operation Requirements
  • 5 Data Object
  • 5.1 Configuration Parameters
  • 5.2 Operation Information
  • 5.3 Control Commands
  • Appendix A (Informative) XML Schema
  • Appendix B (Normative) Definition of data objects in the information control system
  • B.1 Configuration parameter data object
  • B.2 Operational information data object
  • B.3 Control Command Data Object

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document is part 2 of GA/T 1049 "Communication Protocol for Public Security Traffic Integrated Command Platform".

Lower part.

--- Part 1: General;

--- Part 2: Traffic signal control systems;

--- Part 3: Traffic video surveillance system;

--- Part 4: Traffic flow information collection system;

--- Part 5: Traffic violation monitoring and recording system;

--- Part 6: Traffic information release system;

--- Part 7: Police vehicles and single police positioning systems;

--- Part 8: Traffic facility management system;

--- Part 9: Traffic incident collection system;

--- Part 10: Motor vehicle detection and control system;

--- Part 11: Ministry, province and city three-level command platform.

This document replaces GA/T 1049.2-2013 "Communication Protocol for Public Security Traffic Integrated Command Platform Part 2: Traffic Signal Control System Compared with GA/T 1049.2-2013, in addition to structural adjustments and editorial changes, the main technical changes are as follows.

a) Deleted the terms and definitions of "traffic signal control system", "sub-area", "area", "phase", "stage", "cycle" and "equivalent car" (See 3.1, 3.3~3.8 of the 2013 edition);

b) Changed the protocol version number in the general requirements (see 4.1.2, 4.2.1 of the 2013 edition);

c) The logical relationship structure has been changed (see Figure 1, Figure 1 of the 2013 edition);

d) Added line parameters (see 5.1.5);

e) The sub-area parameters have been changed (see 5.1.6, 5.1.4 of the 2013 edition);

f) The intersection parameters have been changed (see 5.1.7, 5.1.5 of the 2013 edition);

g) The signal parameters have been changed (see 5.1.8, 5.1.6 of the 2013 edition);

h) The control import direction of the signal light group parameters has been changed (see 5.1.9, 5.1.7 of the 2013 edition);

i) The detector parameters have been changed (see 5.1.10, 5.1.8 of the 2013 edition);

j) Lane parameters have been changed (see 5.1.11, 5.1.9 of the 2013 edition);

k) Added pedestrian crossing parameters and signal group parameters (see 5.1.12 and 5.1.13);

l) The phase parameters have been changed (see 5.1.14, 5.1.11 of the 2013 edition);

m) The timing scheme parameters have been changed (see 5.1.15, 5.1.12 of the 2013 edition);

n) Added daily planning parameters and scheduling parameters (see 5.1.16 and 5.1.17);

o) The system status has been changed (see 5.2.1, 5.2.1 of the 2013 edition);

p) Deleted the regional status (see 5.2.2 of the 2013 edition);

q) The intersection control scheme has been changed (see 5.2.4, 5.2.5 of the 2013 edition);

r) The intersection phase has been changed (see 5.2.6, 5.2.7 of the 2013 edition);

s) Changed the light color status of the intersection signal group (see 5.2.7, 5.2.8 of the 2013 edition);

t) The intersection control scheme has been deleted (see 5.2.9 of the 2013 edition);

u) Added stage traffic flow data, variable guide lane status, trunk line control mode, trunk line section recommended speed, signal cabinet door status State (see 5.2.9~5.2.13);

v) The specified control method scheme has been changed (see 5.3.2, 5.3.2 of the 2013 edition);

w) Deleted the designated control plan (see 5.3.3 of the 2013 edition);

x) Changed the locking of traffic flow direction and added locking types (see 5.3.3, 5.3.4 of the 2013 edition);

y) Added the functions of issuing center plans, setting timing plan parameters, setting daily plan parameters, setting scheduling parameters, stage intervention, setting Function of changing the guide lane and retransmitting operation information (see 5.3.6~5.3.12);

z) The description of signal group parameter elements has been changed (see B.1.11, B.1.9 of the 2013 edition);

aa) The description of the stage number in the stage parameters has been changed (see Table B.13, Table B.16 of the 2013 edition);

bb) The description of the elements of the intersection phase has been changed (see B.2.6, B.2.7 of the 2013 edition).

Introduction

The public security traffic integrated command platform is positioned at the upper layer of the business application system of the public security traffic command system. It needs to be connected with various business applications.

System communication, integration and calling of its functions to realize its own specific business functions. GA/T 1049 "Communication Protocol of Public Security Traffic Integrated Command Platform" the purpose of the proposal is to standardize the data communication between the public security traffic integrated command platform and various business application systems, and to support the platform to effectively Integration and coordination. Considering that the functions and data of each business application system are relatively independent, it is necessary to target each type of system characteristics under the overall framework.

Develop corresponding specific communication protocols.

GA/T 1049 is divided into 11 parts.

--- Part 1: General. Provides the architecture, general provisions, data packets, communication procedures, common operations and data objects of the communication protocol.

The purpose of this standard is to put forward technical requirements and standardize the common and common contents in the communication protocol.

--- Part 2: Traffic signal control system. Configuration parameters, operation information and control commands of traffic signal control system According to the objects and the operations they support, technical requirements are proposed, aiming to realize the business functions of traffic signal control on the platform.

--- Part 3: Traffic video surveillance system. Configuration parameters, operation information and control commands of the traffic video surveillance system According to the object, and the technical requirements for the operations it supports, the platform aims to realize real-time viewing, PTZ control, historical History playback and other functions.

--- Part 4: Traffic flow information collection system. Configuration parameters, collection data, control commands of the traffic flow information collection system the three types of data objects and the operations they support propose technical requirements, aiming to enable the platform to monitor the status of traffic flow detection equipment and collect Access to traffic flow data.

--- Part 5: Traffic violation monitoring and recording system. Configuration parameters, operation information, control commands, and other aspects of the traffic violation monitoring and recording system.

The three types of data objects and the operations they support are proposed to implement the operation and maintenance of traffic violation monitoring and recording equipment on the platform.

manage.

--- Part 6: Traffic information publishing system. Configuration parameters, operation information and control commands of the traffic information publishing system the technical requirements are put forward according to the objects and the operations they support, aiming to realize the release of traffic information with variable information signs as the main body on the platform.

Equipment operation and maintenance management and information release.

--- Part 7: Police vehicle and single police positioning system. Configuration parameters, operation information, control the three types of data objects and the technical requirements for the operations they support are proposed, aiming to realize the management and Scheduling.

--- Part 8: Traffic facility management system. Configuration parameters, operation information data objects and their support for traffic facility management systems the platform is designed to realize the operation and maintenance of road traffic safety facilities and road traffic technical monitoring equipment.

manage.

--- Part 9: Traffic incident collection system. Configuration parameters, operation information data objects, and their support for the traffic incident collection system the technical requirements for supported operations are proposed, aiming to realize the operation and maintenance management of traffic event collection equipment and the access of traffic event information on the platform.

--- Part 10: Motor vehicle detection and control system. Configuration parameters, operation information, control commands and other aspects of the motor vehicle detection and control system Class data objects and the technical requirements for the operations they support are designed to enable the operation and maintenance of the highway vehicle intelligent detection and recording system on the platform Management and detection and control of motor vehicles.

--- Part 11: Ministry, province and city three-level command platform. Configuration parameters, operation information, control commands and other aspects of the ministry, province and city three-level command platform Class data objects and the technical requirements for the operations they support are intended to achieve basic traffic information between the ministry, province and city command platforms.

Cross-platform exchange of data such as ledgers, road communication status, important police situations, and collaborative processing.

Since the release and implementation of GA/T 1049.2-2013, GB/T 31418 "Terms of Road Traffic Signal Control Systems", GB 25280 "Terms of Road Traffic Signal Control Systems" and GB/T 31418 "Terms of Road Traffic Signal Control Systems" have been updated.

Traffic signal control machine", GB/T 39900 "General technical requirements for road traffic signal control systems" and other national standards for traffic signal control have been successively the relevant contents of this document shall be updated synchronously when it is released or revised.

The functions of road traffic signal control systems are constantly expanding and improving, with traffic signals such as variable guide lanes, trunk line coordination, and bus priority.

New application scenarios for control, unified management and control of multi-signal control systems, and other new application requirements continue to emerge.

GA/T 1049.2-2013 was revised and improved to continuously adapt to new application scenarios and application requirements, ensuring the in-depth support of traffic signal control systems.

Chemical application.

Communication protocol of public security traffic integrated command platform Part 2: Traffic signal control systems

1 Scope

This document specifies the communication protocol between the public security traffic integrated command platform and the information layer of the traffic signal control system.

This document is applicable to the design and development of public security traffic integrated command platform and traffic signal control system software.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in this document.

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.

GB 25280-2016 Road traffic signal controller GB/T 31418-2015 Terminology of road traffic signal control systems GB/T 39900-2021 General technical requirements for road traffic signal control systems GA/T 380-2012 Rules for the compilation of organization codes for public security organs nationwide GA/T 543.6 Public Security Data Element (6) GA/T 543.9 Public Security Data Element (9) GA/T 543.10 Public Security Data Element (10) GA/T 1049.1-2013 Public Security Traffic Integrated Command Platform Communication Protocol Part 1: General

3 Terms and definitions

The terms and definitions defined in GB/T 31418-2015, GA/T 1049.1-2013 and the following apply to this document.

A road intersection where traffic of vehicles and pedestrians is controlled by traffic lights.

The basic parameters that need to be set for the normal operation of the traffic signal control system.

Note. Configuration parameters mainly include road traffic signal controllers, areas, sub-areas, signal-controlled intersections, detectors, lanes, signal groups, stages and timing plans, etc.

4 General technical requirements

4.1 General requirements

4.1.1 The Public Security Traffic Integrated Command Platform (hereinafter referred to as the "Integrated Command Platform") and the Traffic Signal Control System (hereinafter referred to as the "Signal Control System") are connected to the the letter should comply with the requirements of 5.1 to 5.3 of GA/T 1049.1-2013.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 91 pages — is available in the English PDF.

Referenced standards

How to Download GA/T 1049.2-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
91 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GA/T 1049.2-2024

$2,034.00