Valid

GA 1800.2-2021Requirements for public security and counter-terrorist of electric power system - Part 2: Conventional thermal power companies (English PDF)

电力系统治安反恐防范要求 第2部分 火力发电企业

Preview PDF

This is a limited preview

Buy now to download the full PDF (11 pages)

Need quotation for your management?

Get a formal quotation for GA 1800.2-2021 in 30 minutes.

Issued by

Ministry of Public Security

Level / Type

National · Mandatory

Issue date

January 1, 1970

Implementation date

January 1, 1970

Scope

GA 1800.2-2021 is the English-translated version of 电力系统治安反恐防范要求 第2部分 火力发电企业.

GA 1800.2-2021 — This document stipulates the key objectives and key positions of thermal power generation enterprises' public security and anti-terrorism prevention, the level of key objectives and prevention levels, and the overall Prevention requirements, normal three-level protection requirements, normal second-level protection requirements, normal first-level protection requirements, abnormal protection requirements and safety protection systems skills requirement.

This document is applicable to the public security and anti-terrorism prevention work and management of thermal power generation enterprises.

Found what you need?

Document preview — GA 1800.2-2021

National Standard of the People's Republic of China

ICS
13.320
Classification
A 91

Issued by: Ministry of Public Security

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Key objectives and key parts
  • 5 Key target level and prevention level
  • 6 Overall precautionary requirements
  • 7 Normal three-level prevention requirements
  • 8 Normal secondary prevention requirements
  • 9 Normal primary prevention requirements
  • 10 Abnormal prevention requirements
  • 11 Technical requirements for security protection system
  • Appendix A (Normative) Configuration of normal prevention facilities for thermal power stations (plants)
  • Reference

Foreword

This document is in accordance with GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

This document is GA

Part 2 of 1800-2021 "Requirements for Anti-terrorism Prevention of Public Security in Power Systems". GA 1800-2021 has been released the following parts.

---Part 1: Power grid enterprises;

---Part 2: Thermal power generation enterprises;

---Part 3: Hydroelectric power generation enterprises;

---Part 4: Wind power companies;

---Part 5: Solar power generation companies;

---Part 6: Nuclear power generation companies.

This document is prepared by the Office of the National Anti-Terrorism Work Leading Group, the Public Security Administration of the Ministry of Public Security, the Anti-Terrorism Bureau of the Ministry of Public Security, and the Science and Technology Information of the Ministry of Public Security the Bureau of Chemistry proposed.

This document was prepared by the National Standardization Technical Committee of Security Alarm System (SAC/TC

100) Centralized.

1 Scope

This document stipulates the key objectives and key positions of thermal power generation enterprises' public security and anti-terrorism prevention, the level of key objectives and prevention levels, and the overall Prevention requirements, normal three-level protection requirements, normal second-level protection requirements, normal first-level protection requirements, abnormal protection requirements and safety protection systems skills requirement.

This document is applicable to the public security and anti-terrorism prevention work and management of thermal power generation enterprises.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

3836.1 Explosive Atmosphere Part 1: General Requirements for Equipment GB

12899 General Technical Specification for Handheld Metal Detectors GB/T

22239 Information Security Technology Network Security Level Protection Basic Requirements GB/T

28181 Technical requirements for information transmission, exchange and control of public security video surveillance networked systems GB/T

32581 Technical requirements for intrusion and emergency alarm systems GB

35114 Public security video surveillance network information security technical requirements GB/T 37078-2018 Technical requirements for entrance and exit control system GB

37300 Video image information collection specification for key public safety areas GB

50348 Security Engineering Technical Standard GB

50660 Design Code for Large and Medium-sized Thermal Power Plants GA

69 Explosion-proof blanket

GA/T

644 Technical requirements for electronic inspection system

3 Terms and definitions GB 50348 and GB the following terms and definitions defined by 50660 apply to this document.

Thermal power station (plant) conventional thermal power station Thermal power plants that generate heat from coal or hydrocarbons.

[Source. GB/T

2900.52-2008,602-01-23] 3.2 Conventional thermal power company an enterprise that owns one or more thermal power stations (factories) that provide electric energy and/or heat energy and services to the market.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.

Referenced standards

How to Download GA 1800.2-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
11 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GA 1800.2-2021

$210.00