DL/T 860.71-2014Communication Networks and Systems in Substations - Part 7-1: Basic Communication Structure Principles and Models (English PDF)
电力自动化通信网络和系统 第7-1部分:基本通信结构原理和模型
This is a limited preview
Buy now to download the full PDF (72 pages)
Need quotation for your management?
Get a formal quotation for DL/T 860.71-2014 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
October 15, 2014
Implementation date
March 1, 2015
Scope
DL/T 860.71-2014 is the English-translated version of 电力自动化通信网络和系统 第7-1部分:基本通信结构原理和模型.
DL/T 860.71-2014 — Communication Networks and Systems in Substations - Part 7-1: Basic Communication Structure Principles and Models
Found what you need?
Document preview — DL/T 860.71-2014
National Standard of the People's Republic of China
- ICS
- 29.240.01
- Classification
- F 21
- Replacing
- DL/T 860.71-2006
Issued by: National Energy Administration
Contents
- Document data1
Document data
International classification (ICS): 29.240.01.
Chinese classification (CCS): F21.
Estimated length of the Chinese original: 109,113 words.
Adopted international standard: IEC 61850-7-1-2011, IDT.
Supersedes the earlier edition DL/T 860.71-2006.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 72 pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 33591-2017Technical specification of time synchronism system and equipment in smart substation
- GB/T 33602-2017General service protocol for electric power system
- NB/T 31067-2015Communications for monitoring and control of wind power plants - Information models
- GB/Z 25320.1-2010Power systems management and associated information exchange - Data and communications security - Part 1: Communication network and system security - Introduction to security issues
How to Download DL/T 860.71-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 860.10-2018 — Communication networks and systems for power utility automation -Part 10: Conformance testing
DL/T 860.4-2018 — Power automation communication networks and systems - Part 4: Systems and project management
DL/T 860.5-2006 — Communication networks and systems in substations. Part 5: Communication requirements for functions and device models
Secure payment via Stripe
Payments accepted
DL/T 860.71-2014
$1,400.00