Valid

DL/T 5210.6-2019Code for construction quality acceptance of electric power construct - Part 6: Commissioning (English PDF)

电力建设施工质量验收规程 第6部分:调整试验

Preview PDF

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL/T 5210.6-2019 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

June 4, 2019

Implementation date

October 1, 2019

Scope

DL/T 5210.6-2019 is the English-translated version of 电力建设施工质量验收规程 第6部分:调整试验.

DL/T 5210.6-2019 is the Chinese industry standard "Code for construction quality acceptance of electric power construct - Part 6: Commissioning". It was issued on June 4, 2019 by the National Energy Administration, and took effect on October 1, 2019. It is in force and replaces DL/T 5210.6-2009.

Found what you need?

Document preview — DL/T 5210.6-2019

National Standard of the People's Republic of China

Issued by: National Energy Administration

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: National Energy Administration.

Date of issue: 2019-06-04.

Date of implementation: 2019-10-01.

Status: valid, replaces DL/T 5210.6-2009.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Editions of DL/T 5210.6

EditionTitleRevisionStatus
DL/T 5210.6-2019Code for construction quality acceptance of electric power construct - Part 6: Commissioning—Valid
DL/T 5210.6-2009Specification for construction quality acceptance and evaluation of electric power construct. Part 6: The equipment and the system with the water treatment and hydrogen generation—Obsolete

This page sells the current edition, DL/T 5210.6-2019. Earlier editions are listed for reference only.

How to Download DL/T 5210.6-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 5210.6-2019

$285.00