DL/T 5210.4-2009Code for construction quality acceptance and evaluation of electric power construct. Part 4: Instrumentation and control (English PDF)
电力建设施工质量验收及评价规程 第4部分:热工仪表及控制装置
DL/T 5210.4 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 5210.4-2018 | Code for construction quality acceptance of electric power construct Part 4: Instrumentation and control equipment | Valid |
| DL/T 5210.4-2009 | Code for construction quality acceptance and evaluation of electric power construct. Part 4: Instrumentation and control | Obsolete |
DL/T 5210.4-2009 is obsolete. It has been replaced by DL/T 5210.4-2018. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5210.4-2009 in 30 minutes.
Issued by
Ministry of Railway
Level / Type
National · Recommended
Issue date
July 22, 2009
Implementation date
December 1, 2009
Scope
DL/T 5210.4-2009 is the English-translated version of 电力建设施工质量验收及评价规程 第4部分:热工仪表及控制装置.
DL/T 5210.4-2009 is the Chinese industry standard "Code for construction quality acceptance and evaluation of electric power construct. Part 4: Instrumentation and control".
It was issued on July 22, 2009 by the Ministry of Railway, and took effect on December 1, 2009. It is obsolete: it has been replaced by DL/T 5210.4-2018.
Found what you need?
Document preview — DL/T 5210.4-2009
National Standard of the People's Republic of China
Issued by: Ministry of Railway
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: Ministry of Railway.
Date of issue: 2009-07-22.
Date of implementation: 2009-12-01.
Status: obsolete, replaced by DL/T 5210.4-2018.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Download DL/T 5210.4-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5210.5-2018 — Code for construction quality acceptance of electric power construct - Part 5: welding
DL/T 5210.3-2009 — Code for construction quality acceptance and evaluation of electric power construct. Part 3: turbine generator unit
DL/T 5210.5-2009 — Code for construction quality acceptance and evaluation of electric power construct. Part 5: Piping and System
DL/T 5210.4-2009
$600.00