Obsolete

DL 5009.2-2004Code of safety operation in power engineering construction. Part 2: power transmission line (English PDF)

电力建设安全工作规程 第2部分:架空电力线路

Preview PDF

DL 5009.2 | Evolution and historical versions

Std IDTitleStatus
DL 5009.2-2004Code of safety operation in power engineering construction. Part 2: power transmission lineObsolete

DL 5009.2-2004 is obsolete. It has been replaced by DL 5009.2-2013. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL 5009.2-2004 in 30 minutes.

Issued by

National Development and Reform Commission

Level / Type

National · Mandatory

Scope

DL 5009.2-2004 is the English-translated version of 电力建设安全工作规程 第2部分:架空电力线路.

DL 5009.2-2004 is the Chinese industry standard "Code of safety operation in power engineering construction. Part 2: power transmission line". It was issued by the National Development and Reform Commission. It is obsolete: it has been replaced by DL 5009.2-2013.

Found what you need?

Document preview — DL 5009.2-2004

National Standard of the People's Republic of China

Issued by: National Development and Reform Commission

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: National Development and Reform Commission.

Status: obsolete, replaced by DL 5009.2-2013.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download DL 5009.2-2004

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL 5009.2-2004

$950.00