Valid

CJJ 200-2014Technical regulation for city heat-supplying pipe net constructed by mining method (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (198 pages)

Need quotation for your management?

Get a formal quotation for CJJ 200-2014 in 30 minutes.

Issued by

Ministry of Housing and Urban-Rural Development of the People's Republic of China

Level / Type

National · Mandatory

Issue date

January 1, 2014

Implementation date

April 1, 2015

Scope

CJJ 200-2014 (Technical regulation for city heat-supplying pipe net constructed by mining method) is available as an English-translated PDF.

CJJ 200-2014 is the Chinese standard "Technical regulation for city heat-supplying pipe net constructed by mining method". This standard applies to heating network in the excavation of the tunnel design, construction and acceptance.

It was issued by Ministry of Housing and Urban-Rural Development of the People's Republic of China. It cites 25 other standards.

Found what you need?

Document preview — CJJ 200-2014

National Standard of the People's Republic of China

Classification
P46

Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China

Contents

  • Document data
  • Standards quoted by this standard
2 Normative references

The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document.

GB 50007

GB 50010

GB 50017

GB 50086

GB/T 50107

GB 50108

GB 50119

GBJ 146

GB 50164

GB 50203

GB 50204

GB 50205

GB 50208

GB 50278

GB 50299

GB 50300

GB/T 50476

GB 175

GB/T 700

GB 1499.1

GB 1499.2

GB/T 1596

GB/T 1955

GB 3095

GB 3096

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 198 pages — is available in the English PDF.

Referenced standards

How to Download CJJ 200-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
198 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

CJJ 200-2014

$3,785.00