Valid

CJ/T 539-2019General technical specifications of Tramway signal system (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (13 pages)

Need quotation for your management?

Get a formal quotation for CJ/T 539-2019 in 30 minutes.

Issued by

Ministry of Housing and Urban-Rural Development of the People's Republic of China

Level / Type

National · Recommended

Issue date

January 1, 1970

Implementation date

June 1, 2020

Scope

CJ/T 539-2019 (General technical specifications of Tramway signal system) is available as an English-translated PDF.

CJ/T 539-2019 — This standard specifies the general requirements, performance requirements, reliability, availability, maintainability and safety requirements of the tram signal system.

System composition, functional requirements, interface requirements with other systems, electromagnetic compatibility protection, test methods and inspection rules, signs, labels, accompanying documents, Packaging, transportation and storage. This standard applies to tram signal systems.

Found what you need?

Document preview — CJ/T 539-2019

National Standard of the People's Republic of China

ICS
33.040
Classification
Q 84

Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms, definitions and abbreviations
  • 4 General requirements
  • 5 Performance requirements
  • 6 Reliability, availability, maintainability and safety requirements
  • 7 System composition
  • 8 Functional requirements
  • 9 Interfacing with other systems
  • 10 Electromagnetic compatibility protection
  • 11 Test methods and inspection rules
  • 12 Signs, labels and accompanying documents
  • 13 Packaging, transportation and storage

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard was proposed by the Standard Rating Institute of the Ministry of Housing and Urban-Rural Development.

This standard is under the jurisdiction of the Urban Rail Transit Standardization Technical Committee of the Ministry of Housing and Urban-Rural Development.

The organization responsible for drafting this standard. Tonghao Wanquan Signal Equipment Co., Ltd.

Participated in the drafting of this standard. Beijing Quanlu Communication Signal Research and Design Institute Group Co., Ltd., Shenyang Hunnan Modern Tram Co., Ltd., Guangzhou Tram Co., Ltd., China Communications Tunnel Bureau Electrification Engineering Co., Ltd., Suzhou Gaoxin Tram Co., Ltd., Zhejiang Jiangzhonghe Technology Co., Ltd., Shanghai Fuxin Intelligent Traffic Control Co., Ltd., Wuhan Optics Valley Transportation Construction Co., Ltd.

1 Scope

This standard specifies the general requirements, performance requirements, reliability, availability, maintainability and safety requirements of the tram signal system.

System composition, functional requirements, interface requirements with other systems, electromagnetic compatibility protection, test methods and inspection rules, signs, labels, accompanying documents, Packaging, transportation and storage.

This standard applies to tram signal systems.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 12758 General technical conditions for urban rail transit signal system GB/T 21562 Rail transit reliability, availability, maintainability and safety specifications and examples GB/T 24338.5 Rail Transit Electromagnetic Compatibility Part 4: Signal and Communication Equipment Emission and Immunity GB/T 28808 Rail transit communication, signal and processing system control and protection system software GB/T 28809 Rail Transit Communication, Signal and Processing System Signal Safety Related Electronic System GB 50174 Data Center Design Specification GB 50343 Technical Specification for Lightning Protection of Building Electronic Information System TB/T 3027 Technical conditions for computer interlocking of railway stations

3 Terms, definitions and abbreviations

3.1 Terms and definitions

The following terms and definitions apply to this document.

3.1.1

Tramwaysignalsystem

According to the relative position and status of the tram and the line equipment, the tram operation command, operation control, and road connection can be realized manually or automatically.

A unified and coordinated automatic control system for road traffic signal control.

3.1.2

Dedicatedtrackcircuit it is suitable for trams and realizes the non-insulation resonant track circuit for section idle or occupancy detection.

3.1.3

Mainlineswitchcontrolsystem A system used to realize the interlocking control of main line turnouts, signals, and section idle or occupied detection equipment.

3.1.4

Level crossing signal control system Connect with the road traffic signal control system to realize the coordinated control of road traffic signals and tram signals at level crossings system.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.

Referenced standards

How to Download CJ/T 539-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
13 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

CJ/T 539-2019

$344.00