YS/T 441.5-2014Management rules of nonferrous metals balance. Part 5: Gold and silver metallurgy (English PDF)
有色金属平衡管理规范 第5部分:金、银冶炼
This is a limited preview
Buy now to download the full PDF (8 pages)
Need quotation for your management?
Get a formal quotation for YS/T 441.5-2014 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Recommended
Issue date
October 14, 2014
Implementation date
April 1, 2015
Scope
YS/T 441.5-2014 is the English-translated version of 有色金属平衡管理规范 第5部分:金、银冶炼.
YS/T 441.5-2014 — This section YS/T 441 provides for non-ferrous metals as gold, silver rule of term portion of the metal balance management, responsibilities, metal balanced scorecard Calculation formula, the balance sheet metal preparation methods and formats.
This section is applicable to non-ferrous metallurgy tails anode mud as raw gold, silver smelting company and its subsidiary products.
Found what you need?
Document preview — YS/T 441.5-2014
National Standard of the People's Republic of China
- ICS
- 77.120.01
- Classification
- H 60
- Replacing
- YS/T 441.5-2001
Issued by: Ministry of Industry and Information Technology
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
Foreword
YS/T 441-2014 "non-ferrous metal balance management practices" is divided into five sections.
--- Part 1. Copper smelting mineral processing;
--- Part 2. lead smelting mineral processing;
--- Part 3. zinc smelting mineral processing;
--- Part 4. tin smelting mineral processing;
--- Part 5. gold, silver smelting.
This section is YS/T Part 5 441.
This section drafted in accordance with GB/T 1.1-2009 given rules.
The partial replacement of YS/T 441.5-2001 "non-ferrous metal smelting gold and silver part of the norm." This portion of YS/T 445.1-2001 Compared to the main changes are as follows.
--- Updated the reference standard;
--- Metal balance management responsibility has been revised to delete part of the duties and powers;
--- Modified semi-metal recovery, the amount of dry, intermediate materials, inventory and other definitions, delete the whole plant smelting recovery, the new step back Definition of yield, total recovery smelting, metal balance of terms;
--- Further improve the material flow chart of smelting process;
--- According to the actual situation on the balance sheet metal format has been improved.
The non-ferrous metal part by the National Standardization Technical Committee (SAC/TC243) centralized.
This section is responsible for drafting units. China Nonferrous Metals Industry Standards and Metrology Institute for Quality.
This section is drafted. Daye Nonferrous Metals Co., Ltd., Henan Yuguang Gold & Lead Co., Ltd.
Participated in the drafting of this section. Jiangxi Copper Company Limited, Yanggu Yoshimitsu Copper Co., Ltd. Copper North, East Camp radius Copper Co., Baiyin Nonferrous Metals Company.
1 Scope
This section YS/T 441 provides for non-ferrous metals as gold, silver rule of term portion of the metal balance management, responsibilities, metal balanced scorecard Calculation formula, the balance sheet metal preparation methods and formats.
This section is applicable to non-ferrous metallurgy tails anode mud as raw gold, silver smelting company and its subsidiary products.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 4134 ingot
GB/T 4135 Silver
GB/T 11066 (all parts) Methods for chemical analysis of gold GB/T 11067 (all parts), chemical analysis of silver GB/T 14260 heavy nonferrous metals flotation concentrates in bulk sampling and sample preparation General YS/T 87 copper, lead anode slime sampling and sample preparation method
3 Terms and Definitions
The following terms and definitions apply to this document.
Finished finishedproducts Within the company has completed the whole production process, the test meet the quality standards and storage procedures after finishing products.
Semi-finished products semi-finished the companies have completed within one or several production phases, comply with the requirements on product quality, but needs the other students in the enterprise Production stage smelting or further processed products.
In producting-finished products is in the smelting process, has not yet reached the finished or semi-finished products (including smelting though completed, but still have yet to test or inspection is completed no storage products). WIP between raw materials and semi-finished products, semi-finished products and semi-finished products, semi-finished and finished products.
By-products Smelting process output "three wastes" (waste gas, waste water, waste) further utilization (smelting or processing) to produce other products.
Returned goods reciclingproducts Metal smelting process, this process does not reach the output of finished or semi-finished quality requirements still need to return to this step metal reprocessing materials.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 4134Gold ingots
- GB/T 4135Silver ingots
- GB/T 14260General rules for sampling and sample preparation of heavy nonferrous metals flotation concentrates in bulk
GB/T 11066 · GB/T 11067
Editions of YS/T 441.5
| Edition | Title | Revision | Status |
|---|---|---|---|
| YS/T 441.5-2014 | Management rules of nonferrous metals balance. Part 5: Gold and silver metallurgy | — | Current |
| YS/T 441.5-2001 | Non-ferrous metals the balanced management norms gold, silver smelting section | — | Superseded |
This page sells the current edition, YS/T 441.5-2014. Earlier editions are listed for reference only.
How to Download YS/T 441.5-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation.
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 11066.1-1989 — Gold--Determination of gold content--Fire assaying method
GB/T 11066.1-2008 — Methods for chemical analysis of gold - Determination of gold content - Fire assaying method
GB/T 11066.10-2009 — Methods for chemical analysis of gold - Determination of silicon content - Molybdenum blue spectrophotometry
YS/T 441.5-2014