Valid

YD/T 2569-2013TD-LTE digital cellular mobile telecommunication network X2 interface test method (phase 1) (English PDF)

LTE数字蜂窝移动通信网 X2接口测试方法(第一阶段)

Preview PDF

This is a limited preview

Buy now to download the full PDF (22 pages)

Need quotation for your management?

Get a formal quotation for YD/T 2569-2013 in 30 minutes.

Issued by

Ministry of Industry and Information Technology

Level / Type

National · Recommended

Issue date

January 1, 2013

Implementation date

January 1, 2013

Scope

YD/T 2569-2013 is the English-translated version of LTE数字蜂窝移动通信网 X2接口测试方法(第一阶段).

YD/T 2569-2013 is the Chinese standard "TD-LTE digital cellular mobile telecommunication network X2 interface test method (phase 1)". This standard specifies the LTE digital cellular mobile communication network (the first phase) of the test method X2 interface.

This standard applies to LTE digital cellular mobile communication network (the first phase) of the base station equipment. It was issued by Ministry of Industry and Information Technology. It cites 1 other standard.

Found what you need?

Document preview — YD/T 2569-2013

National Standard of the People's Republic of China

ICS
33.060.99
Classification
M36

Issued by: Ministry of Industry and Information Technology

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative references
  • 3 Abbreviations
  • 3.1 Terms and definitions
  • 4 General
  • 4.1 Test environment
  • 4.2 UE Information
  • 4.3 Test Implementation
  • 5 Technical requirements

1 Foreword

YD/T 2569-2013 is issued by Ministry of Industry and Information Technology.

The YD/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

The document runs to 22 pages in English translation.

2 Scope Preview

This standard specifies the LTE digital cellular mobile communication network (the first phase) of the test method X2 interface. This standard applies to LTE digital cellular mobile communication network (the first phase) of the base station equipment.

YD/T 2569-2013 falls under ICS 33.060.99, in the field of telecommunications.

This catalogue holds 3,420 other YD/T standards in that field.

In this catalogue, YD/T standards carry edition years from 1982 to 2026.

3 Normative references

The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document.

YD/T 2568.4

4 About this standard

Issued by: Ministry of Industry and Information Technology

English translation: about 22 pages (approximate)

5 Related standards

Standards on related subjects:

GB/T 32401-2015 — Technical requirements and measurement methods for VHF/UHF frequency

YD/T 2689-2014 — Technical Requirement for LTE based Broadband Trunking Communication(B-TrunC)

GB/T 12572-2008 — Universal requirements and measurement methods of parameters for radio transmitting equipment

YD/T 2574-2017 — LTEFDD digital cellular mobile telecommunication network. Testmethod of eNodeB equipment(Phase 1)

YD/T 2573-2017 — LTE FDD digital cellular mobile telecommunication network. Technical requirement of eNodeB equipment(Phase 1)

YD/T 2571-2015 — TD-LTE digital cellular mobile communication network base station equipment technical requirements (the first stage)

6 Classification and status

International classification (ICS): 33.060.99

Chinese Standard Classification (CCS): M 36

Prefix YD/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 22 pages — is available in the English PDF.

Referenced standards

How to Download YD/T 2569-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
22 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YD/T 2569-2013

$610.00