YC/T 281-2026On-the-spot evaluation criteria for quality control circle activity of tobacco enterprise (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (9 pages)

Need quotation for your management?

Get a formal quotation for YC/T 281-2026 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

January 13, 2026

Implementation date

April 1, 2026

Scope

YC/T 281-2026 (On-the-spot evaluation criteria for quality control circle activity of tobacco enterprise) is available as an English-translated PDF.

YC/T 281-2026 — This document specifies the on-site evaluation of the results and processes of the activities of the quality management team (hereinafter referred to as "QC team") in tobacco enterprises.

This document applies to the on-site evaluation of QC group activities in tobacco companies.

Found what you need?

Document preview — YC/T 281-2026

National Standard of the People's Republic of China

ICS
65.160
Classification
X 85
Replacing
YC/T 281-2008

Issued by: National Energy Administration

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4.1 Conforms to national and industry guidelines
  • 4.2 Comprehensive and objective evaluation

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents".

Drafting.

This document supersedes YC/T 281-2008 "On-site Evaluation Criteria for QC Group Activities in Tobacco Industry Enterprises" and is consistent with YC/T 281-Compared to 2008, aside from structural adjustments and editorial changes, the main technical changes are as follows.

a) The scope of application of the document has been changed, expanding its application to include tobacco companies (see Chapter 1, Chapter 1 of the 2008 edition);

b) Removed the terms and definitions for QC groups, QC group outcomes, "problem-solving" projects, and "innovative" projects; added on-site evaluation.

Price, outcome on-site evaluation, and process on-site evaluation terminology and definitions (see Chapter 3, Chapter 2 of the 2008 edition);

c) General requirements have been added (see Chapter 4);

d) Added evaluation categories (see Chapter 5);

e) Increased the evaluators, methods, and timing (see Chapter 6);

g) The requirements for the selection of technical parameters and management methods have been removed (see 3.2.5 and 3.2.6 of the 2008 version);

h) The on-site evaluation forms have been modified, dividing them into QC group achievement on-site evaluation forms and QC group achievement introduction and application forms.

Four forms. On-site Evaluation Form for Effectiveness, On-site Evaluation Form for QC Group Activities, and On-site Evaluation Form for the Introduction and Application of QC Group Results.

Tables (see Appendix A, Appendix B, and Table 1 of the 2008 edition).

Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.

This document was proposed by the State Tobacco Monopoly Administration.

This document is under the jurisdiction of the Enterprise Subcommittee of the National Tobacco Standardization Technical Committee (SAC/TC144/SC4).

1 Scope

This document specifies the on-site evaluation of the results and processes of the activities of the quality management team (hereinafter referred to as "QC team") in tobacco enterprises.

This document applies to the on-site evaluation of QC group activities in tobacco companies.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

GB/T 19000 Quality Management Systems. Fundamentals and Vocabulary

3 Terms and Definitions

The terms and definitions defined in GB/T 19000 and the following terms and definitions apply to this document.

On-the-spot evaluation Based on the scene and context of the QC group activity, and in accordance with the prescribed requirements and provided objective evidence, the results of the QC group activity and its process are evaluated.

The process of making judgments, analyses, and evaluations to arrive at reliable and logical conclusions.

In accordance with the requirements for on-site evaluation, the on-site evaluation aims to verify authenticity and effectiveness, and takes the results of QC group activities as the evaluation object.

Note. This includes on-site evaluation of the results of QC group activities and on-site evaluation of the results of the introduction and application of QC group achievements.

The on-site evaluation of the results implemented is called "results on-site evaluation," and the on-site evaluation of the results of the introduction and application of QC group results is called "effectiveness on-site evaluation." 3.3 in accordance with the on-site evaluation requirements, with the aim of assessing standardization and accuracy, the evaluation will focus on the QC group activity process and the introduction and application of QC group results.

On-site evaluation of the process.

4.1 Conforms to national and industry guidelines

To implement the national QC group activity requirements of "small, practical, active, and innovative," and to put into practice the industry's guiding principle of "taking the initiative ourselves," we must base our work on the needs of national and industry development.

Activities should be carried out targeting problems or development needs in enterprise production, operation, and management, effectively solving practical problems or meeting needs, and continuously improving...

To improve product and service management, help create new quality productivity in the industry, and serve the industry's high-quality development and modernization.

4.2 Comprehensive and objective evaluation

Adhere to systematic thinking, and comprehensively and accurately evaluate the results and processes of QC group activities based on on-site facts and objective evidence.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.

Referenced standards

How to Download YC/T 281-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
9 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YC/T 281-2026

$284.00