YC/T 214.3-2006Tobacco machinery. Dry ice expansion tobacco plant. Part 3: Directives for acceptance (English PDF)
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for YC/T 214.3-2006 in 30 minutes.
Issued by
State Tobacco Monopoly Administration
Level / Type
National · Recommended
Issue date
October 13, 2006
Implementation date
October 13, 2006
Scope
YC/T 214.3-2006 (Tobacco machinery. Dry ice expansion tobacco plant. Part 3: Directives for acceptance) is available as an English-translated PDF.
YC/T 214.3-2006 — Tobacco machinery. Dry ice expansion tobacco plant. Part 3: Directives for acceptance
Found what you need?
Document preview — YC/T 214.3-2006
National Standard of the People's Republic of China
- ICS
- 65.160
- Classification
- X 94
Issued by: State Tobacco Monopoly Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the carbon dioxide inflation leaves silk production line acceptance conditions, methods and acceptance criteria. This standard applies to carbon dioxide inflation leaves silk production line (hereinafter referred to as the entire line), and the entire line of the machine acceptance.
Document data
International classification (ICS): 65.160.
Chinese classification (CCS): X94.
Estimated length of the Chinese original: 11,137 words.
Standards quoted by this document
GB 252; GB 2635-1992; GB 10621; GB/T 14436; GB/T 16447; YC 9; YC/T 11.2; YC/T 28.8-1996; YC/T 152-2001; YC/T 214.1; YC/T 214.2
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
How to Download YC/T 214.3-2006
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
YC/T 214.1-2006 — Tobacco machinery. Dry ice expansion tobacco plant. Part 1: Directives for design
YC/T 214.2-2006 — Tobacco machinery. Dry ice expansion tobacco plant. Part 2: Directives for installation and test run
YC/T 1-2026 — Tobacco machinery-Product model compilation rules and naming methods
Secure payment via Stripe
Payments accepted
YC/T 214.3-2006
$344.00