Valid

YC/T 11.7-1993Tobacco machinery. Drawing and design document of product. Part 7: Standardization examination (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (5 pages)

Need quotation for your management?

Get a formal quotation for YC/T 11.7-1993 in 30 minutes.

Issued by

State Tobacco Monopoly Administration

Level / Type

National · Recommended

Issue date

February 23, 2006

Implementation date

March 1, 2006

Scope

YC/T 11.7-1993 (Tobacco machinery. Drawing and design document of product. Part 7: Standardization examination) is available as an English-translated PDF.

YC/T 11.7-1993 — This part of YC/T 11 specifies the drawings and design documents of tobacco machinery products, including CAD drawings and design documents (hereinafter referred to as drawings).

And the contents and requirements of the standardization review of documents or CAD files. This section applies to the standardized review of tobacco machinery product drawings and design documents.

Found what you need?

Document preview — YC/T 11.7-1993

National Standard of the People's Republic of China

ICS
65.160
Classification
X 94
Replacing
YC/T 11.7-1993

Issued by: State Tobacco Monopoly Administration

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Definition
  • 4 Basic requirements

Foreword

YC/T 11 "Tobacco Machinery Product Drawings and Design Documents" is divided into the following eight parts.

--- Part 1. General;

--- Part 2. Basic requirements;

--- Part 3. Format;

--- Part 4. Coding principles;

--- Part 5. Integrity;

--- Part 6. Change method;

--- Part 7. Standardization review;

--- Part 8. Management rules.

This part is the seventh part of YC/T 11.

This part replaces YC/T 11.7-1993 "Standard Review of Tobacco Machinery Product Drawings and Design Documents".

Compared with YC/T 11.7-1993, the main changes in this section are as follows.

--- The original "Chapter 3" "General Provisions" was changed to Chapter 4 "Basic Requirements"; the original Chapters 4 and 5 were changed to Chapters 5 and 6 respectively;

--- Added provisions for standardization review of CAD software and databases;

--- Added standardized review procedures and review methods for CAD documents;

--- Added the requirement that "patterns and design documents that have not been standardized for review should not be put into storage or transferred to the next process".

Appendix A of this standard is an informative annex.

This part is proposed by the National Tobacco Monopoly Bureau.

This part is under the jurisdiction of the National Tobacco Standardization Technical Committee (TC144).

This section drafted by. Shanghai Tobacco Machinery Co., Ltd., China Tobacco Machinery Technology Center Co., Ltd.

1 Scope

This part of YC/T 11 specifies the drawings and design documents of tobacco machinery products, including CAD drawings and design documents (hereinafter referred to as drawings).

And the contents and requirements of the standardization review of documents or CAD files.

This section applies to the standardized review of tobacco machinery product drawings and design documents.

2 Normative references

The terms in the following documents become the provisions of this part by reference to this part of YC/T 11. For dated references, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, an agreement is encouraged under this section.

The parties are studying whether the latest version of these documents can be used. For undated references, the latest edition applies to this section.

GB/T 1.2 Standardization Work Guide Part 2. Method for determining the content of normative technical elements in standards GB 9969.1 General instructions for the use of industrial products GB/T 14665 Mechanical Engineering CAD Drawing Rules GB/T 17825.1 CAD file management general GB/T 17825.2 CAD file management basic format GB/T 17825.3 CAD file management number principle GB/T 17825.4 CAD file management rules GB/T 17825.5 CAD file management basic program GB/T 17825.6 CAD file management change rules GB/T 17825.7 CAD file management signing rules GB/T 17825.8 CAD file management standardization review YC/T 11.1 Tobacco machinery product drawings and design documents - Part 1. General YC/T 11.5 Tobacco machinery product drawings and design documents - Part 5. Complete

3 Definition

The terms and definitions established in YC/T 11.1 apply to this part of YC/T 11.

4 Basic requirements

4.1 The basis for standardization review is the relevant technical regulations and standards at all levels. After standardization review, it should be achieved.

a) The designed product complies with relevant national technical regulations;

b) The designed products comply with national standards, industry standards and corporate standards;

c) Prioritize the use of stereotyped design and structural solutions, and maximize the use of standard parts, general parts, borrowed parts to improve design Inheritance and standardization of products;

d) rational selection of basic standards and raw material standards such as priority numbers and structural elements of parts;

e) Product drawings and design documents comply with relevant standards and are correct, complete, clear and uniform.

4.2 The CAD software purchased or developed shall be subject to standardization review to check whether it meets the requirements of national standards and relevant standards.

4.3 Standardization review is based on the premise that the design and auditors consciously implement various standards, in the preliminary design, technical design and work of the product.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 5 pages — is available in the English PDF.

Referenced standards

How to Download YC/T 11.7-1993

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
5 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YC/T 11.7-1993

$204.00