YB/T 4270-2012Operation specifications of converter vaporization recovery steam generation system (English PDF)
This is a limited preview
Buy now to download the full PDF (11 pages)
Need quotation for your management?
Get a formal quotation for YB/T 4270-2012 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Recommended
Issue date
January 1, 2012
Implementation date
January 1, 2012
Scope
YB/T 4270-2012 (Operation specifications of converter vaporization recovery steam generation system) is available as an English-translated PDF.
YB/T 4270-2012 is the Chinese standard "Operation specifications of converter vaporization recovery steam generation system". This standard specifies the converter vaporization recovery steam generation system components and major equipment, systems operation, maintenance, incident handling.
This standard steam turbine type is saturated steam turbine. It was issued by Ministry of Industry and Information Technology. It cites 4 other standards.
Found what you need?
Document preview — YB/T 4270-2012
National Standard of the People's Republic of China
- ICS
- 77.010
- Classification
- H04
Issued by: Ministry of Industry and Information Technology
Contents
- Document data
- Standards quoted by this standard
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document.
GB 1576
GB/T 14541
DL/T 561
DL/T 893
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
Referenced standards
How to Download YB/T 4270-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 561-2022 — Guideline of chemical supervision for water and steam in thermal power plant
DL/T 5610-2021 — Code for planning and design of transmission network
DL/T 5611-2021 — Design Regulations for Power Access System
Secure payment via Stripe
Payments accepted
YB/T 4270-2012
$339.00