TZJ 2004-2017Budget quotas for railway engineering (Volume 4: Track engineering) (English PDF)
铁路工程预算定额(第四册 轨道工程)
TZJ 2004 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| TB/T 10825-2024 | Railway Engineering Budget Quota (Volume 4) - Railway engineering) | Valid |
| TZJ 2004-2017 | Budget quotas for railway engineering (Volume 4: Track engineering) | Obsolete |
TZJ 2004-2017 is obsolete. It has been replaced by TB/T 10825-2024. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for TZJ 2004-2017 in 30 minutes.
Issued by
NRA
Level / Type
Industry · Recommended
Issue date
May 6, 2017
Implementation date
July 1, 2017
Scope
TZJ 2004-2017 is the English-translated version of 铁路工程预算定额(第四册 轨道工程).
TZJ 2004-2017 is the Chinese local standard "Budget quotas for railway engineering (Volume 4: Track engineering)". It was issued on May 6, 2017 by NRA, and took effect on July 1, 2017. It is obsolete: it has been replaced by TB/T 10825-2024.
Found what you need?
Document preview — TZJ 2004-2017
National Standard of the People's Republic of China
Issued by: NRA
Contents
- Document data
1 Document data
Sector: Local Standards (local standard).
Issuing body: NRA.
Date of issue: 2017-05-06.
Date of implementation: 2017-07-01.
Status: obsolete, replaced by TB/T 10825-2024.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download TZJ 2004-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TZJ 1001-2017 — Preparation method of budget estimate for railway capital construction engineering design
TZJ 2000-2017 — Basic quotas for railway engineering
TZJ 2001-2017 — Budget quotas for railway engineering (Volume 1: Subgrade engineering)
Secure payment via Stripe
Payments accepted
TZJ 2004-2017
$169.00