TZJ 1001-2017Preparation method of budget estimate for railway capital construction engineering design (English PDF)
铁路基本建设工程设计概(预)算编制办法
TZJ 1001 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| TB 10801-2024 | Standard for Design Estimate Budget of Railway Capital Construction Projects | Valid |
| TZJ 1001-2017 | Preparation method of budget estimate for railway capital construction engineering design | Obsolete |
TZJ 1001-2017 is obsolete. It has been replaced by TB 10801-2024. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for TZJ 1001-2017 in 30 minutes.
Issued by
NRA
Level / Type
Industry · Recommended
Issue date
May 6, 2017
Implementation date
July 1, 2017
Scope
TZJ 1001-2017 is the English-translated version of 铁路基本建设工程设计概(预)算编制办法.
TZJ 1001-2017 is the Chinese local standard "Preparation method of budget estimate for railway capital construction engineering design". It was issued on May 6, 2017 by NRA, and took effect on July 1, 2017. It is obsolete: it has been replaced by TB 10801-2024.
Found what you need?
Document preview — TZJ 1001-2017
National Standard of the People's Republic of China
Issued by: NRA
Contents
- Document data
1 Document data
Sector: Local Standards (local standard).
Issuing body: NRA.
Date of issue: 2017-05-06.
Date of implementation: 2017-07-01.
Status: obsolete, replaced by TB 10801-2024.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download TZJ 1001-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TZJ 2000-2017 — Basic quotas for railway engineering
TZJ 2001-2017 — Budget quotas for railway engineering (Volume 1: Subgrade engineering)
TZJ 2002-2017 — Budget quotas for railway engineering (Volume 2: Bridge and culvert engineering)
Secure payment via Stripe
Payments accepted
TZJ 1001-2017
$169.00