Valid

TD/T 1039-2013Rules of engineering-quantity calculation for land consolidation and rehabilitation projects (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (21 pages)

Need quotation for your management?

Get a formal quotation for TD/T 1039-2013 in 30 minutes.

Issued by

Ministry of Land and Resources of the People's Republic of China

Level / Type

National · Recommended

Issue date

January 1, 2013

Implementation date

August 1, 2013

Scope

TD/T 1039-2013 (Rules of engineering-quantity calculation for land consolidation and rehabilitation projects) is available as an English-translated PDF.

TD/T 1039-2013 - This standard applies to land remediation project design phase of the project volume calculation. Bidding and acceptance phase of the project volume calculation can refer to carried out.

Found what you need?

Document preview — TD/T 1039-2013

National Standard of the People's Republic of China

ICS
91.020
Classification
P50

Issued by: Ministry of Land and Resources of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 General
  • 4 Earthworks
  • 5 Stone project
  • 6 Masonry works
  • 7 Concrete works
  • 8 Farm well engineering
  • 9 Transmission and Distribution Engineering
  • 10 Road works
  • 11 Installation Engineering
  • 12 Farmland Protection Engineering
  • Other works
  • Appendix A (Informative) General soil classification table
  • Appendix B (informative) earthwork calculation method
  • Appendix C (Informative) Rock Classification Table
  • Appendix D (Informative) Hydrogeological Drilling Stratigraphic Classification

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard is proposed and managed by the Ministry of Land and Resources.

This standard was drafted. Land and Resources Ministry of land remediation center, Ministry of Land and Cultivated Land Protection Division.

1 Scope

This standard applies to land remediation project design phase of the project volume calculation. Bidding and acceptance phase of the project volume calculation can refer to carried out.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document.

Building drafting standards GB/T 50104-2010 GB 50500-2013 construction project bill of quantities pricing specification TD/T 1012 land development and consolidation project planning and design specifications TD/T 1033-2012 high standards of basic farmland construction standards Land readjustment project design report preparation rules Land reclamation project mapping specification GJDGZ-101-1995 National unified construction project budget calculation rules (civil engineering) GYDGZ-201-2000 Unified national installation project budget calculation rules Finance Comprehensive.2011 No. 128 land development and consolidation project budget fixed standard

3 General rules

3.1 The amount of land renovation works should be based on the amount of physical construction projects or engineering drawings to calculate.

3.2 The amount of construction projects in the project should be classified in accordance with the "land development and consolidation project budget fixed standards" requirements.

3.3 Engineering calculation should be based on the following documents.

a) Engineering drawings and their descriptions;

b) construction design or construction program;

c) Other relevant technical and economic documents.

3.4 The amount of engineering units should be based on the following provisions.

a) cubic meters (m3) by volume;

b) square meters (m2) in area;

c) meters in length (m);

d) kg (kg) in terms of mass;

e) equipment in pieces (a group, sets, sets, units or roots) as a unit;

f) The trees are in strains.

When summarizing the project volume, the rules are as follows. take the effective figures in cubic meters, square meters, and kilograms as decimal places;

The unit takes an integer.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Referenced standards

How to Download TD/T 1039-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TD/T 1039-2013

$345.00