Obsolete

TB/T 3080-2003Technical rule for the concrete switch sleeper (English PDF)

混凝土岔枕技术条件

Preview PDF

TB/T 3080 | Evolution and historical versions

Std IDTitleStatus
TB/T 3080-2014Concrete turnout sleeper for ballasted trackObsolete
TB/T 3080-2003Technical rule for the concrete switch sleeperObsolete

TB/T 3080-2003 is obsolete. It has been replaced by TB/T 3080-2014. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for TB/T 3080-2003 in 30 minutes.

Issued by

Ministry of Railways

Level / Type

National · Recommended

Issue date

July 29, 2003

Implementation date

July 29, 2003

Scope

TB/T 3080-2003 is the English-translated version of 混凝土岔枕技术条件.

TB/T 3080-2003 is the Chinese industry standard "Technical rule for the concrete switch sleeper". It was issued on July 29, 2003 by the Ministry of Railways, and took effect on July 29, 2003. It is obsolete: it has been replaced by TB/T 3080-2014.

Found what you need?

Document preview — TB/T 3080-2003

National Standard of the People's Republic of China

Issued by: Ministry of Railways

Contents

  • Document data
1 Document data

Sector: Railway (industry standard).

Issuing body: Ministry of Railways.

Date of issue: 2003-07-29.

Date of implementation: 2003-07-29.

Status: obsolete, replaced by TB/T 3080-2014.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download TB/T 3080-2003

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TB/T 3080-2003

$105.00