Scope
TB/T 2658.20-2004 (Work and operation standard for railway maintenance construction Ballast replacing construction with heavy-duty track maintenance machinery) is available as an English-translated PDF.
TB/T 2658.20-2004 is the Chinese standard "Work and operation standard for railway maintenance construction Ballast replacing construction with heavy-duty track maintenance machinery".
This standard specifies the large-scale road maintenance machinery (hereinafter referred to as the "big machine") for ballast track bed operating conditions, work organization, working procedures and requirements and construction safety aspects.
This standard applies to the use of large machines for track bed ballast operations, including handling mud pumping ballast. Large cleaning machine hooking pneumatic unloading cha car for the track bed ballast cleaning operations may refer to.
This standard applies to road design speed of 160km/h and below the line. Issued on 2004-10-23, in force from 2005-01-15.
Found what you need?
Document preview — TB/T 2658.20-2004
National Standard of the People's Republic of China
- ICS
- 45.120
- Classification
- S24
Contents
- [Preview only]
- 1 Scope
- 2 Normative References
- 3 Terms and Definitions
- 3.1 Basic requirements
- 3.2 Material requirements
- 3.3 Structural requirements
- 3.4 Performance Requirements
- 4 Technical Requirements
- 4.1 Longitudinal rail restraint
- 4.2 Assembly clamping force
- 4.3 Fatigue performance of fastening assembly
- 4.4 Insulation performance
- 5 Test Methods
- 5.1 Type Inspection
- 5.2 End-of-manufacturing Inspection
- 6 Inspection Rules
- 6.1 Vertical Load Test
- 6.2 Longitudinal Compression Test
- 6.3 Longitudinal Tension Load Test
- 6.4 Torque Load Test
- 6.5 Rescue Strength Test (Single-head Lifting)
- 6.6 Safe Pressure Test of the Driver's Cab
- 6.7 Anti-collision Structure Pressure Test of the Driver's Cab
- 6.8 Cowcatcher Pressure Test
- 7 Marking, Packaging, Transportation and Storage
- 8 Test Equipment and Instruments
- 9 Strain Gage and Its Pasting and Wiring
- 9.1 Requirements of Measuring Gage
- 9.2 Requirements of Temperature Compensating Gage
- 9.3 Pasting Requirements of Strain Gage
- 9.4 Wiring Requirements of Strain Gage
- 9.5 Moisture-proof of Strain Gage
1 Foreword
TB/T 2658.20-2004 was issued by National Railway Administration on 23 October 2004 and has been in force since 15 January 2005.
It is one of 3 parts of the TB/T 2658 series.
The TB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
2 Scope Preview
This standard specifies the large-scale road maintenance machinery (hereinafter referred to as the "big machine") for ballast track bed operating conditions, work organization, working procedures and requirements and construction safety aspects. This standard applies to the use of large machines for track bed ballast operations, including handling mud pumping ballast. Large cleaning machine hooking pneumatic unloading cha car for the track bed ballast cleaning operations may refer to. This standard applies to road design speed of 160km/h and below the line.
TB/T 2658.20-2004 falls under ICS 45.120, in the field of railway engineering.
This catalogue holds 457 other TB/T standards in that field.
In this catalogue, TB/T standards carry edition years from 1973 to 2026.
3 About this standard
Sector: Railway & Train Industry Standard (Recommended)
Issued by: National Railway Administration
English translation: about 8 pages (approximate)
Chinese original: about 8,852 characters
4 Related standards
Other parts of this standard:
TB/T 2658.21-2007 — Maintenance performance. Part 21: Ultrasonic testing of rail welds
TB/T 2658.22-2010 — Maintenance performance. Part 22: Rail and switch grinding machine performance standard
Standards on related subjects:
TB/T 2340-2012 — Ultrasonic testing detector for rail
5 Classification and status
International classification (ICS): 45.120
Chinese Standard Classification (CCS): S 24
Prefix TB/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.
How to Download TB/T 2658.20-2004
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TB/T 2658.21-2007 — Maintenance performance. Part 21: Ultrasonic testing of rail welds
TB/T 2658.22-2010 — Maintenance performance. Part 22: Rail and switch grinding machine performance standard
TB/T 2033-2026 — Rail vehicle - Rail flat car
TB/T 2658.20-2004
$244.00