TB/T 2075.12-2024Electrified railway contact network components - Part 12: Pulley compensation devices (English PDF)
电气化铁路接触网零部件 第12部分:滑轮补偿装置
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for TB/T 2075.12-2024 in 30 minutes.
Issued by
National Railway Administration
Level / Type
National · Recommended
Issue date
November 22, 2024
Implementation date
June 1, 2025
Scope
TB/T 2075.12-2024 is the English-translated version of 电气化铁路接触网零部件 第12部分:滑轮补偿装置.
TB/T 2075.12-2024 is the Chinese industry standard "Electrified railway contact network components - Part 12: Pulley compensation devices". It was issued on November 22, 2024 by the National Railway Administration, and took effect on June 1, 2025. It is in force and replaces TB/T 2075.12-2020.
Found what you need?
Document preview — TB/T 2075.12-2024
National Standard of the People's Republic of China
Issued by: National Railway Administration
Contents
- Document data
1 Document data
Sector: Railway (industry standard).
Issuing body: National Railway Administration.
Date of issue: 2024-11-22.
Date of implementation: 2025-06-01.
Status: valid, replaces TB/T 2075.12-2020.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Editions of TB/T 2075.12
| Edition | Title | Revision | Status |
|---|---|---|---|
| TB/T 2075.12-2024 | Electrified railway contact network components - Part 12: Pulley compensation devices | — | Valid |
| TB/T 2075.12-2020 | Catenary Components for Electrified Railway - Part 12: Pulley Compensation Device | — | Obsolete |
| TB/T 2075.12-2010 | Fittings for overhead contact system in electrification railway. Part 12: Pully assembly for tensioning | — | Obsolete |
| TB/T 2075.12-2002 | Fittings for overhead contact system of electrification railway-Part 12: Suspension pulley | — | Obsolete |
| TB/T 2075.12-1990 | Electrified railway catenary parts locating ring | — | Obsolete |
This page sells the current edition, TB/T 2075.12-2024. Earlier editions are listed for reference only.
How to Download TB/T 2075.12-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TB/T 2075.13-2024 — Electrified railway contact network components - Part 13: Ratchet compensation devices
TB/T 2075.11-1990 — Long electrified railway catenary parts holder
TB/T 2075.13-2020 — Catenary Components for Electrified Railway - Part 13: Ratchet Compensation Device
TB/T 2075.12-2024
$385.00