TB/T 1500.6-2009Operation of receiving and departing trains. Part 6: On single and double lines with telephone block and without interlocking (English PDF)
接发列车作业 第6部分:单双线电话闭塞无联锁
This is a limited preview
Buy now to download the full PDF (11 pages)
Need quotation for your management?
Get a formal quotation for TB/T 1500.6-2009 in 30 minutes.
Issued by
Ministry of Railways of the People's Republic of China
Level / Type
National · Recommended
Issue date
February 12, 2009
Implementation date
March 1, 2009
Scope
TB/T 1500.6-2009 is the English-translated version of 接发列车作业 第6部分:单双线电话闭塞无联锁.
TB/T 1500.6-2009 — This standard provides a single-line phone occlusion without interlock device (interlock equipment failure) sending and receiving train station operating procedures, technical requirements of the job positions.
Found what you need?
Document preview — TB/T 1500.6-2009
National Standard of the People's Republic of China
- ICS
- 03.220.30
- Classification
- S 93
- Replacing
- TB/T 1506-2003
Issued by: Ministry of Railways of the People's Republic of China
Contents
- What this standard covers1
- Document data2
What this standard covers
This standard provides a single-line phone occlusion without interlock device (interlock equipment failure) sending and receiving train station operating procedures, technical requirements of the job positions. This standard applies to single-line phone occlusion without interlock device (interlock device failure) of the station.
Document data
International classification (ICS): 03.220.30.
Chinese classification (CCS): S93.
Estimated length of the Chinese original: 16,195 words.
Supersedes the earlier edition TB/T 1506-2003.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
How to Download TB/T 1500.6-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TB/T 1500.1-2009 — Operation of receiving departing trains. Part 1: On double lines with auto-blocking and centralized interlocking (with signalman)
TB/T 1500.2-2009 — Operation of receiving and departing trains. Part 2: On double lines with auto-blocking and centralized interlocking(without signalman)
TB/T 1500.3-2009 — Operation of receiving and departing trains. Part 3: On single and double lines with semi-auto-blocking and centralized interlocking(with signalman)
Secure payment via Stripe
Payments accepted
TB/T 1500.6-2009
$404.00