TB/T 1500.2-2009Operation of receiving and departing trains. Part 2: On double lines with auto-blocking and centralized interlocking(without signalman) (English PDF)
接发列车作业 第2部分:双线自动闭塞集中联锁(未设信号员)
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for TB/T 1500.2-2009 in 30 minutes.
Issued by
Ministry of Railways of the People's Republic of China
Level / Type
National · Recommended
Issue date
February 12, 2009
Implementation date
March 1, 2009
Scope
TB/T 1500.2-2009 is the English-translated version of 接发列车作业 第2部分:双线自动闭塞集中联锁(未设信号员).
TB/T 1500.2-2009 — This standard specifies the double automatic block interlocking device for sending and receiving train station operating procedures, technical requirements of the job positions.
Found what you need?
Document preview — TB/T 1500.2-2009
National Standard of the People's Republic of China
- ICS
- 03.220.30
- Classification
- S 93
- Replacing
- TB/T 1501-2003
Issued by: Ministry of Railways of the People's Republic of China
Contents
- What this standard covers1
- Document data2
What this standard covers
This standard specifies the double automatic block interlocking device for sending and receiving train station operating procedures, technical requirements of the job positions. This standard applies to two-automatic block signal interlocking device does not have a member of the station.
Document data
International classification (ICS): 03.220.30.
Chinese classification (CCS): S93.
Estimated length of the Chinese original: 10,132 words.
Supersedes the earlier edition TB/T 1501-2003.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
How to Download TB/T 1500.2-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TB/T 1500.1-2009 — Operation of receiving departing trains. Part 1: On double lines with auto-blocking and centralized interlocking (with signalman)
TB/T 1500.3-2009 — Operation of receiving and departing trains. Part 3: On single and double lines with semi-auto-blocking and centralized interlocking(with signalman)
TB/T 1500.4-2009 — Operation of receiving and departing trains. Part 4: On single and double Lines with semi-auto-blocking and centralized interlocking(without signalman)
Secure payment via Stripe
Payments accepted
TB/T 1500.2-2009
$244.00