TB/T 1484.1-2017Specification for cables on board rolling stock - Part 1: Power and control cables (English PDF)

机车车辆电缆 第1部分:动力和控制电缆

Preview PDF

TB/T 1484.1 | Evolution and historical versions

Std IDTitleStatus
TB/T 1484.1-2025Cables on board rolling stock - Part 1: Power and control cablesValid
TB/T 1484.1-2017Specification for cables on board rolling stock - Part 1: Power and control cablesObsolete

TB/T 1484.1-2017 is obsolete. It has been replaced by TB/T 1484.1-2025. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for TB/T 1484.1-2017 in 30 minutes.

Issued by

NRA

Level / Type

National · Recommended

Issue date

June 5, 2017

Implementation date

January 1, 2018

Scope

TB/T 1484.1-2017 is the English-translated version of 机车车辆电缆 第1部分:动力和控制电缆.

TB/T 1484.1-2017 is the Chinese industry standard "Specification for cables on board rolling stock - Part 1: Power and control cables". It was issued on June 5, 2017 by NRA, and took effect on January 1, 2018. It is obsolete: it has been replaced by TB/T 1484.1-2025.

Found what you need?

Document preview — TB/T 1484.1-2017

National Standard of the People's Republic of China

Issued by: NRA

Contents

  • Document data
1 Document data

Sector: Railway (industry standard).

Issuing body: NRA.

Date of issue: 2017-06-05.

Date of implementation: 2018-01-01.

Status: obsolete, replaced by TB/T 1484.1-2025.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download TB/T 1484.1-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TB/T 1484.1-2017

$680.00