SN/T 4233-2015Requirements for construction of designated quarantine facilities for imported cattle and sheep(or goats) (English PDF)

进境牛羊指定隔离场建设要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for SN/T 4233-2015 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

December 31, 2009

Implementation date

May 1, 2010

Scope

SN/T 4233-2015 is the English-translated version of 进境牛羊指定隔离场建设要求.

SN/T 4233-2015 — This Standard specifies the inspection contents, methods and requirements of pre-operation inspection for offshore drilling and support units.

This Standard is applicable to the pre-operation inspection of offshore mobile drilling units such as bottom-sitting, self-elevating, semi-submersible drilling platforms, etc. and support units on the platform.

For floating drilling unit, this Standard may be served as a reference standard.

Found what you need?

Document preview — SN/T 4233-2015

National Standard of the People's Republic of China

ICS
75.020
Classification
E 13

Issued by: National Energy Administration

Contents

  • Foreword...3
  • 1 Scope...4
  • 2 Terms and definitions...4
  • 3 Pre-operation inspection...4
  • 3.1 Requirements...4
  • 3.2 Test conditions...4
  • 3.3 Inspection contents and methods...5
  • 4 Test report...6
  • 4.1 Contents of report...6
  • 4.2 Rectification of problems...6
  • Appendix A (Normative) Certificates and material inspection...7
  • Appendix B (Normative) Intuitive inspection...20

Foreword

This Standard replaces SY/T 10025-1999 "Pre-operation Inspection for Drilling Platform".

Compared with SY/T 10025-1999, the main changes of this Standard are as follows.

— Add test methods;

— Add test conditions;

— Tabulate the inspection contents;

— Add inspection report;

— Delete policy statement in SY/T 10025-1999;

— Delete inspection purpose in SY/T 10025-1999;

— Delete appendix D in SY/T 10025-1999.

Appendixes A, B and C in this Standard are normative.

This Standard was proposed by and shall be under the jurisdiction of the Standardizing Committee

on Offshore Oil Drilling Engineering.

Drafting organizations of this Standard. China Oilfield Services Limited (COSL) and China National

Offshore Oil Corporation (CNOOC).

Main drafters of this Standard. CAO Shijing, WANG Jianjun, LI Lihong, YUAN Xiaosong, WANG

Dongshi, and SONG Linsong.

The historical version replaced by this Standard is as follows.

— SY/T 10025-1999.

Pre-operation Inspection for Offshore Drilling Unit

1 Scope

This Standard specifies the inspection contents, methods and requirements of pre-operation

inspection for offshore drilling and support units.

This Standard is applicable to the pre-operation inspection of offshore mobile drilling units such as

bottom-sitting, self-elevating, semi-submersible drilling platforms, etc. and support units on the

platform. For floating drilling unit, this Standard may be served as a reference standard.

2 Terms and definitions

For the purpose of this Standard, the following terms and definitions shall apply.

2.1

pre-operation

The time from the moment FROM when drilling unit is confirmed to be used in drilling operation

TO the starting time of operation.

2.2

operator

A company which has the right to operate and manages oil and gas mines, or organizes and

operates offshore drilling project.

2.3

drilling contractor

A company which has or uses drilling unit and provides drilling operation services to operator.

3 Pre-operation inspection

3.1 Requirements

Pre-operation inspection shall be organized and carried out by an inspection group. The members

of inspection group shall include the experts in the fields of safety, environmental protection, drilling,

electromechanical industry, and marine affairs, etc. The leader of the inspection group shall be

appointed by the operator.

The inspection group shall make inspection plan and contents based on the characteristics of

operation. The operator shall notify the inspection plan and contents to drilling contractor about

10d in advance.

3.2 Test conditions

In case of one of the following conditions, drilling unit shall be inspected.

— When operator first-time uses the drilling unit;

— When there is significant difference existed in the engineering contents of adjacent operation

contract;

— After the owner of drilling unit is changed;

— After the significant repair or rectification of drilling unit;

— Drilling unit re-operates after having idled for 3 months or more;

— When operator considers that it is necessary.

3.3 Inspection contents and methods

3.3.1 Certificates and material inspection

Inspect the quality certificates of drilling and support units, qualification of contractor, original

materials and record, management system, operational conditions, etc. The detail contents of

certificates and material inspection are shown in Appendix A.

3.3.2 Inspection of drilling unit and support units
3.3.2.1 Inspection methods

It should adopt intuitive inspection, function test, pressure test, unified operational test,

nondestructive test and disassembly inspection, etc.

3.3.2.2 Intuitive inspection

It should adopt the methods such as eye-inspection, hand-touching and ear-hearing. Intuitive

inspection contents are shown in Appendix B.

3.3.2.3 Function test

Observe the working conditions of all moving parts of control equipment under unladen load or

light load; monitor the range of displayed parameters of each instrument.

It is applicable to underwater & well control system, drilling string compensation system, skidding

system, crown block protector, safety detection and alarm system, power system, emergency

system, rescue system and fire-fighting system.

3.3.2.4 Pressure test

Use test medium to pressurize the system to test its loading and sealing capacities. It is applicable

to underwater & well control system, drilling fluid recycling system, well cementing system, ash

transmission system, and the pipeline and valve of sea water system. The test pressure of low

pressure installations such as sea water and ash transmission systems is the rated working

pressure. If it does not fall within 5min, then it is deemed as qualified. For high pressure installation,

low and high pressure tests shall be conducted separately. The test result of high pressure

equipment shall conform to the design requirements.

3.3.2.5 Unified operational test

Apply load to power, rotating, lifting and recycling systems; then conduct unified operational test.

During the test, the displayed data of relevant instruments such as ampere meter shall be recorded.

The test scheme shall be able to reflect the operational and power matching conditions of single

unit and entire system. The time of load test of drilling fluid recycling system shall not be lower than

6h. The time for the unified trial operation of newly constructed drilling unit shall not be lower than

36h.

3.3.2.6 Nondestructive test

On the condition that the tested object shall not be damaged or destroyed, sound, light, electric or

25 Marine riser and man delivery device

26 Gooseneck pipe and choke killing hose a

Sheave block for marine

riser tensioner and steel

rope a

28 Liquid-gas separator

Telescoped bulkhead for

guide rope tensioner and

steel rope a

30 Relief valve of tension system

31 Relief valve of guide rope tensioner

32 Relief valve for oil gas storage of compensator

33 Trip and pressure testing device for diverter

3 Only for floating drilling unit.

A.1.3.4 Certificates of power and support units

For the certificates of power and support units that need to be inspected, refer to Table A.5.

Table A.5 Certificates of Power and Support Units

Name of drilling unit. Responsible person. Inspection time. Inspector.

SN Equipment

Pressure

test

report

Third-party

test

certificate/r

eport

Ex-

factory

qualific

ation

certific

ate

Technica

instructi

ons

Maintena

nce

instruction

Namep

late

certificate

issued by

original

factory

Rema

rk

1 Main diesel generator set

2 Emergency diesel generator set

Rectification and

frequency conversion

electric control gear

4 Boiler (thermal medium boiler)

5 Activate air compressor

6 Tension air compressor

7 Serve air compressor

8 Soot blowing compressor

9 Respirator's compressor

10 Ship refrigerating installation

11 Air conditioning system

Pumps (ballast pump,

main sea water pump,

sewage pump, electric

submersible pump)

13 Fresh water generator

14 Crane, travelling crane, electric hoist

15 All the pneumatic/ hydraulic winches

16 Fastening object

17 Fastened object

18 Platform forklift

Mooring system

(anchor head, anchor

cable, Kent ring, fishing

tools, anchor chain,

buoy, shackle, anchor

gear)

Jacking system (motor,

gear case, brake, rack,

ring beam, ring beam

pin, shockproof rubber,

hydraulic system)

21 Locking device (rack, hydraulic system)

Main towing system

(cross-bridge cable,

towing bridle, anti-wear

chain, shackle, triangle,

stand-by towing line)

Table A.5 (Continued)

SN Equipmen...

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Referenced standards

How to Download SN/T 4233-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SN/T 4233-2015

$95.00