SL 419-2008Specification for soil and water conservation tests (English PDF)
水土保持试验规程
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL 419-2008 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
January 4, 2008
Implementation date
April 4, 2008
Scope
SL 419-2008 is the English-translated version of 水土保持试验规程.
SL 419-2008 is the Chinese industry standard "Specification for soil and water conservation tests". It was issued on January 4, 2008 by the Ministry of Water Resources of the People's Republic of China, and took effect on April 4, 2008. It is in force and replaces SL 419-2007.
Found what you need?
Document preview — SL 419-2008
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources of the People's Republic of China.
Date of issue: 2008-01-04.
Date of implementation: 2008-04-04.
Status: valid, replaces SL 419-2007.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Editions of SL 419
| Edition | Title | Revision | Status |
|---|---|---|---|
| SL 419-2008 | Specification for soil and water conservation tests | — | Valid |
| SL 419-2007 | Test specification of soil and water conservation | — | Obsolete |
This page sells the current edition, SL 419-2008. Earlier editions are listed for reference only.
How to Download SL 419-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
SL 419-2008
$265.00