SY/T — Petroleum & Gas

Found: 4575 — page 89 of 96

PDF

SY/T 5783-1993 — Production logging interpretation rules

National·Recommended
Superseded$205.00
PDF

SY/T 5784-1993 — Calibration and calculation methods perforation depth horizons

National·Recommended
Withdrawn$225.00
PDF

SY/T 5785-1993 — Petroleum Industry Information Classification and Coding Guidelines

National·Recommended
Superseded$85.00
PDF

SY/T 5786-1993 — Specification for the provision of measuring instruments in material supply warehouses of petroleum enterprises

National·Recommended
Valid$325.00
PDF

SY/T 5787-1993 — Specification for the provision of measuring instruments in water supply and power supply enterprises of oil and gas fields

National·Recommended
Valid$325.00
PDF

SY/T 5788.2-1993 — Oil and gas drilling gas geological logging rules

National·Recommended
Superseded$105.00
PDF

SY/T 5788.3-1993 — Gas logging specifications for oil & gas exploration well

National·Recommended
Superseded$105.00
PDF

SY/T 5789-1993 — Induced flow wells operating procedures

National·Recommended
Withdrawn$225.00
PDF

SY/T 5790-1993 — Explosion repair sleeve technology practice law

National·Recommended
Superseded$165.00
PDF

SY/T 5791-1993 — Process of casing reformation and strengthening seal

National·Recommended
Superseded$90.00
PDF

SY/T 5792-1993 — Oil (gas) wells, sidetracking operation rules of construction

National·Recommended
Superseded$165.00
PDF

SY/T 5793-1993 — Mechanical recovery system efficiency testing and calculation methods

National·Recommended
Withdrawn$225.00
PDF

SY/T 5794-1993 — Drilling Fluid sulfonated asphalt class evaluation method

National·Recommended
Superseded$205.00
PDF

SY/T 5795-1993 — Beam pumping unit installation size, with the size of wearing parts

National·Recommended
Withdrawn$225.00
PDF

SY/T 5796-1993 — Assessment method for flocculant

National·Recommended
Superseded$85.00
PDF

SY/T 5797-1993 — Performance assessment method for oil-in-water emulsion breaker

National·Recommended
Superseded$85.00
PDF

SY/T 5798-1993 — Evaluation method for crude oil paraffin inhibitors - Wax deposition tester method

National·Recommended
Valid$325.00
PDF

SY/T 5799-1993 — Profile control agent performance evaluation method of two-liquid method

National·Recommended
Withdrawn$225.00
PDF

SY/T 5800-1993 — Regulations for acceptance of field data of petroleum magnetotelluric sounding

National·Recommended
Withdrawn$225.00
PDF

SY/T 5801-1993 — Petroleum exploration gravity field data, acceptance

National·Recommended
Superseded$325.00
PDF

SY/T 5803-1993 — Labour quotas for motor vehicle operation

National·Recommended
Valid$325.00
PDF

SY/T 5807-1993 — A process of hydraulic piston pumps work well since under

National·Recommended
Superseded$470.00
PDF

SY/T 5808-1993 — Code for assembly and testing of electric submersible pumps

National·Recommended
Valid$325.00
PDF

SY/T 5809-1993 — Specification for pressure measurement in electric submersible pump wells

National·Recommended
Valid$325.00
PDF

SY/T 5810-1993 — Continuous gas lift production wells design and construction work

National·Recommended
Superseded$270.00
PDF

SY/T 5811-1993 — General Technical Specification for Silicate Series Plugging Agent

National·Recommended
Superseded$85.00
PDF

SY/T 5812-1993 — Annulus testing wellheads

National·Recommended
Superseded$225.00
PDF

SY/T 5813-1993 — Hydraulic piston pump well pump top manometry procedures

National·Recommended
Withdrawn$225.00
PDF

SY/T 5814-1993 — Drilling with humic acid treatment agent effective determination of the content of humic

National·Recommended
Superseded$169.00
PDF

SY/T 5815-1993 — Rock pore volume compressibility test methods

National·Recommended
Superseded$105.00
PDF

SY/T 5818-1993 — Specification for soft fishing operations

National·Recommended
Valid$325.00
PDF

SY/T 5819-1993 — Gravity prospecting technical regulations

National·Recommended
Superseded$315.00
PDF

SY/T 5820-1993 — Technical specification oil magnetotelluric sounding method

National·Recommended
Superseded$355.00
PDF

SY/T 5821.1-1993 — Water shutoff operation methods for oil wells - Technique of water shutoff and profile control with sodium silicate-calcium chloride

National·Recommended
Valid$325.00
PDF

SY/T 5821-1993 — Carbonate reservoir water shutoff technology practice organic blocking agent

National·Recommended
Superseded$405.00
15 pages

SY/T 5822-1993 — Classification and Denomination of Oilfield Chemicals

National·Recommended
Valid$85.00
PDF

SY/T 5823-1993 — Specification for provision of measuring instruments in petroleum engineering construction and installation enterprises

National·Recommended
Valid$325.00
PDF

SY/T 5825-1993 — Mechanical downhole temperature thermometer test

National·Recommended
Superseded$40.00
PDF

SY/T 5826-1993 — Hydraulic piston pump maintenance procedures

National·Recommended
Superseded$309.00
PDF

SY/T 5827-1993 — Stuck salvage craft practice

National·Recommended
Superseded$630.00
PDF

SY/T 5828-1993 — Petroleum Geophysical surveying result Quality Inspection Rules

National·Recommended
Superseded$325.00
PDF

SY/T 5829-1993 — Naming rules for development well number of oil and gas field

National·Recommended
Superseded$85.00
PDF

SY/T 5830-1993 — Set layer volcanic reservoir description method

National·Recommended
Withdrawn$225.00
PDF

SY/T 5832-1993 — Sucker rod centralizer

National·Recommended
Superseded$120.00
PDF

SY/T 5833-1993 — Operating procedures for electric submersible pump wells

National·Recommended
Valid$325.00
PDF

SY/T 5834-1993 — Low solids control fluid performance measurement and evaluation methods

National·Recommended
Superseded$150.00
PDF

SY/T 5835-1993 — Fracturing wellhead valve

National·Recommended
Superseded$285.00
PDF

SY/T 5836-1993 — Design and construction practices in deep fracturing

National·Recommended
Withdrawn$225.00