SY/T — Petroleum & Gas

Found: 4575 — page 87 of 96

PDF

SY/T 5092-1993 — Drilling sulfonated lignite

National·Recommended
Superseded$90.00
PDF

SY/T 5095-1993 — Oil drilling equipment pneumatic components valve test methods

National·Recommended
Withdrawn$225.00
PDF

SY/T 5096-1993 — Equipment pneumatic components Pressure regulator test methods Oil Drilling

National·Recommended
Withdrawn$225.00
PDF

SY/T 5102-1993 — Basic Environment Test of Instrument for Petroleum Exploration and Development - Test K: HTHP Test

National·Recommended
Superseded$55.00
PDF

SY/T 5128-1993 — Steel-Determination of continuous cooling transformation diagram-Dilatometric method

National·Recommended
Superseded$135.00
PDF

SY/T 5133-1993 — Releasing Flip spear fishing

National·Recommended
Withdrawn$225.00
PDF

SY/T 5139-1993 — Li Yun put derrick car

National·Recommended
Superseded$85.00
PDF

SY/T 5141-1993 — Hydraulic torque converter with centrifugal turbine used for drilling rig

National·Recommended
Superseded$355.00
PDF

SY/T 5151-1993 — Releasing tube upside down fishing

National·Recommended
Withdrawn$225.00
PDF

SY/T 5171-1993 — Petroleum Geophysical measurement specifications

National·Recommended
Superseded$605.00
PDF

SY/T 5177-1993 — Labour quotas for automobile overhaul

National·Recommended
Valid$325.00
PDF

SY/T 5179-1993 — Oil machining work quota

National·Recommended
Superseded$2,360.00
PDF

SY/T 5191-1993 — GC logging tool technical conditions

National·Recommended
Superseded$285.00
PDF

SY/T 5211-1993 — High-pressure and high-pressure pipe joint activities elbow

National·Recommended
Superseded$205.00
PDF

SY/T 5275.2-1993 — Filling with water distribution hollow active water distribution

National·Recommended
Superseded$85.00
PDF

SY/T 5313-1993 — Terms of Well drilling engineering

National·Recommended
Superseded$225.00
PDF

SY/T 5326-1993 — Coring technical regulations

National·Recommended
Superseded$205.00
PDF

SY/T 5468-1993 — Specification for provision of measuring instruments in petroleum well logging enterprises

National·Recommended
Valid$325.00
PDF

SY/T 5490-1993 — Sodium bentonite drilling test

National·Recommended
Superseded$185.00
PDF

SY/T 5563-1993 — DSZ1 seismic data repeater station

National·Recommended
Valid$325.00
PDF

SY/T 5564-1993 — Coded sweep generators for vibrators

National·Recommended
Valid$325.00
PDF

SY/T 5566-1993 — Low-energy crude oil water content analyzers

National·Recommended
Superseded$165.00
PDF

SY/T 5567-1993 — Specification for maintenance and repair of small diameter flowmeter-water cut logging instruments

National·Recommended
Valid$325.00
PDF

SY/T 5568-1993 — Electronic control box of vibrator seismic source

National·Recommended
Valid$325.00
PDF

SY/T 5569-1993 — Power stations for telemetry seismographs

National·Recommended
Valid$325.00
PDF

SY/T 5570-1993 — YKZ480 telemetry digitally controlled seismograph

National·Recommended
Valid$325.00
PDF

SY/T 5572-1993 — Drilling Classification and general technical conditions with fishing tools

National·Recommended
Superseded$90.00
PDF

SY/T 5573-1993 — Specification for the provision of measuring instruments in petroleum geophysical prospecting enterprises

National·Recommended
Valid$325.00
PDF

SY/T 5574-1993 — Specification for the equipment of measuring instruments in petroleum and natural gas geological logging enterprises

National·Recommended
Valid$325.00
PDF

SY/T 5578-1993 — Specification for the equipment of measuring instruments in oilfield surface construction enterprises

National·Recommended
Valid$325.00
PDF

SY/T 5579-1993 — Methods for description of conglomerate reservoirs

National·Recommended
Superseded$225.00
PDF

SY/T 5580-1993 — Fine description method of clastic reservoir

National·Recommended
Superseded$70.00
PDF

SY/T 5583-1993 — Requirements for drafting of product standards for petroleum instruments and meters

National·Recommended
Valid$325.00
PDF

SY/T 5585.1-1993 — Seismic data transmission cable electrical parameters of the test method. Characteristic impedance and the propagation time of the test

National·Recommended
Withdrawn$225.00
PDF

SY/T 5585.2-1993 — Cable electrical parameters of the test method of seismic data transmission working attenuation test

National·Recommended
Withdrawn$225.00
PDF

SY/T 5585.3-1993 — Seismic data transmission cable electrical parameters of the test method. Crosstalk attenuation test

National·Recommended
Withdrawn$225.00
PDF

SY/T 5585.4-1993 — Seismic data transmission cable electrical parameters of the test method. DC resistance. Insulation resistance. Capacitance simulation and other tests

National·Recommended
Withdrawn$225.00
PDF

SY/T 5587.10-1993 — Conventional oil wells, workover operations. Hydrajet perforating operation rules

National·Recommended
Superseded$435.00
PDF

SY/T 5587.11-1993 — Conventional oil wells, workover operations. Drillable packer drilling and milling technology practice

National·Recommended
Superseded$105.00
PDF

SY/T 5587.12-1993 — Conventional oil wells, workover operations. Pump method salvage operations

National·Recommended
Superseded$325.00
PDF

SY/T 5587.13-1993 — Conventional oil wells, workover downhole small pieces litter salvage operation method

National·Recommended
Withdrawn$225.00
PDF

SY/T 5587.14-1993 — Conventional oil wells, workover operations. Note the cement plug operating procedures

National·Recommended
Superseded$355.00
PDF

SY/T 5587.15-1993 — Conventional oil wells, workover drill cement plug operating procedures

National·Recommended
Withdrawn$225.00
PDF

SY/T 5587.16-1993 — Conventional oil wells, workover operations. Through wells, casing scrapers operating procedures

National·Recommended
Withdrawn$225.00
PDF

SY/T 5587.17-1993 — Conventional oil wells, workover operations. Salvage rope falling objects operating procedures

National·Recommended
Withdrawn$225.00
PDF

SY/T 5587.18-1993 — Conventional oil wells, workover operations. Drillable bridge plug drilling and milling operation rules

National·Recommended
Withdrawn$225.00
PDF

SY/T 5587.2-1993 — Routine workover operations for oil and water wells - Technical procedures for live well operation

National·Recommended
Valid$325.00
PDF

SY/T 5587.3-1993 — Conventional oil wells, workover operations. Killing spray for operating procedures

National·Recommended
Superseded$165.00